• About Us
  • Services
    • List of Authors
    • For Authors
    • Editor-in-Chief
    • For Editor-in-Chief
    • reviewer
    • For Reviewers
  • List of Journals
  • Order
  • Contact Us
  • Home
  • About Us
  • Contact Us
  • Register
  • Log in
  • Order
Advanced
  • Home
  • Scheduling
    • List of Articles Scheduling

      • Open Access Article
        • Abstract Page
        • Full-Text

        1 - Algorithm of determining Product's Batch Size and Sequence of the Operations of n Job on m Machine
        رسول Haji هوشنگ Taghizadeh
      • Open Access Article
        • Abstract Page
        • Full-Text

        2 - A New Approach For the Arrangement of the Resources Under Undetermined Jobs Sequence
        M. T. Taghavifard H. R. Dehnarseidi
      • Open Access Article
        • Abstract Page
        • Full-Text

        3 - TASA: A New Task Scheduling Algorithm in Cloud Computing
        Somayeh Taherian Dehkordi Vahid Khatibi Bardsiri
      • Open Access Article
        • Abstract Page
        • Full-Text

        4 - Improving the palbimm scheduling algorithm for fault tolerance in cloud computing
        Minoo Soltanshahi
      • Open Access Article
        • Abstract Page
        • Full-Text

        5 - Data Replication-Based Scheduling in Cloud Computing Environment
        Bahareh Rahmati Amir Masoud Rahmani Ali Rezaei
      • Open Access Article
        • Abstract Page
        • Full-Text

        6 - Task Scheduling Algorithm Using Covariance Matrix Adaptation Evolution Strategy (CMA-ES) in Cloud Computing
        Ghazaal Emadi Amir Masoud Rahmani Hamed Shahhoseini
      • Open Access Article
        • Abstract Page
        • Full-Text

        7 - Workflow Scheduling on Hybrid Fog-Cloud Environment Based on a Novel Critical Path Extraction Algorithm
        Fatemeh Davami Sahar Adabi Ali Rezaee Amir Masoud Rahamni
      • Open Access Article
        • Abstract Page
        • Full-Text

        8 - An Effective Task Scheduling Framework for Cloud Computing using NSGA-II
        Hanieh Ghorashi Meghdad Mirabi
      • Open Access Article
        • Abstract Page
        • Full-Text

        9 - HHC-PSS: Solving the problem of home health care with a resource constrained project scheduling approach
        Hamid Reza Yousefzade
      • Open Access Article
        • Abstract Page
        • Full-Text

        10 - Resource management for the issue of selecting and scheduling a self-financing project portfolio in Project-oriented organizations
        Seyed Mahdi Mirkhorsandi Langaroudi Hossein Khosravi Alireza Davoodi Seyed Mojtaba Movahedifar
      • Open Access Article
        • Abstract Page
        • Full-Text

        11 - A multi-objective optimization model for scheduling nurses and routing them in home health care services
        Hamid Reza Yousefzadeh somayeh Harati Motlagh Moosarreza Shamsyeh Zahedi
        10.30495/jnrm.2022.68149.2289
      • Open Access Article
        • Abstract Page
        • Full-Text

        12 - Presenting a Multi-Objective Mathematical Model for Time-Cost trade off Problem Considering Time Value of Money and Solve it by MOPSO Algorithm
        M.A Shafiiee M.R Shahriyary فرهاد hosseinzadeh lotfi reza radfar
      • Open Access Article
        • Abstract Page
        • Full-Text

        13 - Setup times optimization with considering maintenance scheduling by using nonlinear modeling
        A. Zaretalab M.R. Shahryari S. Naderi
      • Open Access Article
        • Abstract Page
        • Full-Text

        14 - Optimizing the Airline Routing Cost using Linear Programming and PSO Algorithm
        Shahram Saeidi Sahar Khoshfetrat
      • Open Access Article
        • Abstract Page
        • Full-Text

        15 - Evaluation of AquaCrop to simulate saffron (crocus sativus l.) yield under different water management scenarios and zeolite amounts
        Niazali Ebrahimipak Mohsen Ahmadee Aslan Egdernezhad Abbas Khashei Suiki
      • Open Access Article
        • Abstract Page
        • Full-Text

        16 - Simulating soybean irrigation scheduling using BUDGET model
        Mahdi Sarai Tabrizi
      • Open Access Article
        • Abstract Page
        • Full-Text

        17 - مسأله تخصیص موعد تحویل و زمانبندی به‌هنگام در سلولهای رباتیک جریان کارگاهی ترکیبی بلوکه‌شده با چندین روبات و هزینه تحویل دسته‌ای
        جواد رضائیان نگار درخشان ایرج مهدوی رضا علیزاده فروتن
      • Open Access Article
        • Abstract Page
        • Full-Text

        18 - A multi-product vehicle routing scheduling model with time window constraints for cross docking system under uncertainty: A fuzzy possibilistic-stochastic programming
        B. Vahdani SH. Sadigh Behzadi
      • Open Access Article
        • Abstract Page
        • Full-Text

        19 - Participation of units taking into account the possible rotational storage and intermittent load
        Amirhossein Babaali Mohammadali Ameli
      • Open Access Article
        • Abstract Page
        • Full-Text

        20 - Optimization of scheduling information in a network-based Standard IEEE802. 17 and measurement for video transmission
        Ehsan Korbekandi Mohsen Ashourian Sayed Ali Hashemi
      • Open Access Article
        • Abstract Page
        • Full-Text

        21 - A Review of Scheduling and Resource Allocation Algorithms with a Load Balancing Approach in Cloud Computing
        Yaser Ramzanpoor
        10.30486/mjtd.2023.1981169.1028
      • Open Access Article
        • Abstract Page
        • Full-Text

        22 - Integrated Optimal Active and Reactive Power Planning in Smart Microgrids with Possibility of One-Hour Islanding
        Parastou Khademi Astaneh Hossein Sheikh Shahrokh Dehkordi
        10.30486/teeges.2023.1979749.1063
      • Open Access Article
        • Abstract Page
        • Full-Text

        23 - A task scheduling model in heterogeneous cloud resources with a combination of collective intelligence algorithms
        safdar rostami Ali Broumandnia Ahmad Khademzadeh
      • Open Access Article
        • Abstract Page
        • Full-Text

        24 - Dynamic Programming for Multi-Crew Scheduling of the Emergency Repair of Network
        Mehrdad Niyazi Javad Behnamian
        10.30495/jsm.2021.1915574.1407
      • Open Access Article
        • Abstract Page
        • Full-Text

        25 - A Goal Programming Linear Model for Simultaneous Project Scheduling and Resource Leveling - a Huge Civil Project as a Case Study
        Yousef Rabbani
        10.30495/jsm.2021.1936452.1503
      • Open Access Article
        • Abstract Page
        • Full-Text

        26 - Parallel Machine Scheduling with Controllable Processing Time Considering Energy Cost and Machine Failure Prediction
        Yousef Rabbani Ali Qorbani Reza Kamran Rad
        10.30495/jsm.2022.1967931.1689
      • Open Access Article
        • Abstract Page
        • Full-Text

        27 - A Heuristic Algorithm for Solving Single Machine Scheduling Problem with Periodic Maintenance
        Amir Ebrahimi Zade Mohammad Bagher Fakhrzad Mohsen Hasaninezhad
      • Open Access Article
        • Abstract Page
        • Full-Text

        28 - A Genetic Algorithm with Modified Crossover Operator for a Two-Agent Scheduling Problem
        Maziyar Yazdani Fariborz Jolai
      • Open Access Article
        • Abstract Page
        • Full-Text

        29 - Staff Scheduling by a Genetic Algorithm
        Ahmad Reza Tahanian Maryam Khaleghi
      • Open Access Article
        • Abstract Page
        • Full-Text

        30 - Joint Maintenance and Spare Parts Inventory Planning (Case Study : Pre – Paint Shuttle Robot of an Automotive Company)
        seyd mohamad reza aboalaghaey Davood Mohammaditabar Sadigh Raissi
      • Open Access Article
        • Abstract Page
        • Full-Text

        31 - Designing a Green Workshop Model, By Balancing Between Completion Time and Energy Consumption (Case Study: Western Machine-Building Corporation)
        Maryam Rahimi alloghareh sayyed mohammad reza davoodi
      • Open Access Article
        • Abstract Page
        • Full-Text

        32 - َA Developed Cuckoo Search Algorithm for Solving a new Model of the Machine and Vehicle Scheduling
        Hojat Nabovati
        10.30495/imj.2021.683352
      • Open Access Article
        • Abstract Page
        • Full-Text

        33 - The identification and ranking of the indicators affecting the routing and scheduling of sustainable urban transportation using multi-criteria decisions
        shiba masoumi Seyyed Mohammad Hadji Molana Mehrdad Javadi Amir Azizi
        10.30495/imj.2022.1928040.1597
      • Open Access Article
        • Abstract Page
        • Full-Text

        34 - Solve the problem of time-cost-quality exchange of projects in the possible case by considering possible solutions
        S. Farid Mousavi Kaveh Khalili-Damghani Farnaz Rezapour Arezoo Gazori-Nishabori
        10.30495/imj.2022.1943331.1702
      • Open Access Article
        • Abstract Page
        • Full-Text

        35 - Providing a Method to Buffer Sizing Determination in Critical Chain of Project Scheduling (Case study: Suliran Co.)
        Mohammad Mehdi Tavagho Hamedani Ahmad Makouie
      • Open Access Article
        • Abstract Page
        • Full-Text

        36 - Apply GRASP Algorithm to Solve the Flow-shop Scheduling without Intermediate Queues Using Traveling Salesman Problem
        Javad Behnamian Ronak Mohammadi Omid Rezaei
      • Open Access Article
        • Abstract Page
        • Full-Text

        37 - Solving Resource-Constrained Project Scheduling Problem with Particle Swarm Optimization (Case Study: Bandar Abbas Gas Condensate Refinery)
        Mohammadhusein Nabizadeh Huseinali Hasanpoor Roozbeh Azizmohammadi Navid Hashtroodi
      • Open Access Article
        • Abstract Page
        • Full-Text

        38 - The Solution of Multi-Objective Multimode Resource-Constrained Project Scheduling Problem with Multi-Objective Bees Metaheuristic Algorithm
        Amir Sadeghi Sina Namazi Zahra Ghorajehlo Behnam Rezvanpour
      • Open Access Article
        • Abstract Page
        • Full-Text

        39 - An Effective Frog-leaping Algorithm to Minimize the Completion Time Problem of the Resource-constrained Projects
        Alireza Haji Akhondi Gholam Reza Tavakoli Peyman Akhavan Manouchehr Manteghi
      • Open Access Article
        • Abstract Page
        • Full-Text

        40 - A Comparative Study on Performance of "ant colony system" and "Linear Programming" methods in the Modeling of the Flow Shop Scheduling
        Said Esfandyari Ali Morovati Sharif Abadi Seyed Habibolah Mirghafouri Hamid Reza Kadkhodazadeh
      • Open Access Article
        • Abstract Page
        • Full-Text

        41 - Minimization of the deviation from the cut-off grades in long-term production scheduling of open pit mines with the goal of controlling waste stockpile
        Ehsan Mosavi Reza Shirinabadi
      • Open Access Article
        • Abstract Page
        • Full-Text

        42 - Minimization of the deviation from the optimal cut-off grades in long-term production scheduling of open pit mines by using mixed integer programming
        Ehsan Moosavi Reza Shirinabadi
      • Open Access Article
        • Abstract Page
        • Full-Text

        43 - Improving Energy-Efficient Target Coverage in Visual Sensor Networks
        Behrooz Shahrokhzadeh Mehdi Dehghan MohammadReza Shahrokhzadeh
      • Open Access Article
        • Abstract Page
        • Full-Text

        44 - Airlines Scheduling under Consideration, Operational constraints
        Shokoh Kheradmand Mohamad Mohamadi Bahman Naderi
      • Open Access Article
        • Abstract Page
        • Full-Text

        45 - An Integrated Model of Project Scheduling and Material Ordering: A Hybrid Simulated Annealing and Genetic Algorithm
        Nima Zoraghi Amir Abbas Najafi سید تقی اخوان نیاکی
      • Open Access Article
        • Abstract Page
        • Full-Text

        46 - A Hierarchical Production Planning and Finite Scheduling Framework for Part Families in Flexible Job-shop (with a case study)
        Davod Abachi fariborz jolai hasan haleh
      • Open Access Article
        • Abstract Page
        • Full-Text

        47 - Scheduling of a flexible flow shop with multiprocessor task by a hybrid approach based on genetic and imperialist competitive algorithms
        Javad Rezaeian Hany Seidgar Morteza Kiani
      • Open Access Article
        • Abstract Page
        • Full-Text

        48 - The project portfolio selection and scheduling problem: mathematical model and algorithms
        Bahman Naderi
      • Open Access Article
        • Abstract Page
        • Full-Text

        49 - An Assessment Method for Project Cash Flow under Interval-Valued Fuzzy Environment
        Vahid Mohagheghi SEYED meysam mousavi Behnam Vahdani
        10.22094/joie.2017.278
      • Open Access Article
        • Abstract Page
        • Full-Text

        50 - Modeling and scheduling no-idle hybrid flow shop problems
        Mehdi Yazdani Bahman Naderi
        10.22094/joie.2016.261
      • Open Access Article
        • Abstract Page
        • Full-Text

        51 - Scheduling of Multiple Autonomous Guided Vehicles for an Assembly Line Using Minimum Cost Network Flow
        Hamed Fazlollahtabar
        10.22094/joie.2017.587.1378
      • Open Access Article
        • Abstract Page
        • Full-Text

        52 - New Heuristic Algorithm for Flow Shop Scheduling with 3 Machines and 2 Robots Considering the Breakdown Interval of Machines and Robots Simultaneously
        mahdi eghbali Mohammad Saidi Mehrabad hassan haleh
        10.22094/joie.2016.259
      • Open Access Article
        • Abstract Page
        • Full-Text

        53 - A Job Shop Scheduling and Location of Battery Charging Storage for the Automated Guided Vehicles (AGVs)
        Saeed Dehnavi-Arani Ali Sabaghian Mehdi Fazli
        10.22094/joie.2018.543203.1511
      • Open Access Article
        • Abstract Page
        • Full-Text

        54 - Diversified Particle Swarm Optimization for Hybrid Flowshop Scheduling
        Javad Behnamian
        10.22094/joie.2018.671.1433
      • Open Access Article
        • Abstract Page
        • Full-Text

        55 - A Mathematical Model and a Solution Method for Hybrid Flow Shop Scheduling
        Esmaeil Najafi Bahman Naderi Hassan Sadeghi Mehdi Yazdani
      • Open Access Article
        • Abstract Page
        • Full-Text

        56 - Project Portfolio Selection with the Maximization of Net Present Value
        Mostafa Nikkhah Nasab Amir Abbas Najafi
      • Open Access Article
        • Abstract Page
        • Full-Text

        57 - َA Multi-objective simulated annealing algorithm to solving flexible no-wait flowshop scheduling problems with transportation times
        Bahman Naderi Hassan Sadeghi
      • Open Access Article
        • Abstract Page
        • Full-Text

        58 - Design of a Hybrid Genetic Algorithm for Parallel Machines Scheduling to Minimize Job Tardiness and Machine Deteriorating Costs with Deteriorating Jobs in a Batched Delivery System
        Mohammad Saidi-Mehrabad Samira Bairamzadeh
        10.22094/joie.2018.272
      • Open Access Article
        • Abstract Page
        • Full-Text

        59 - A Bi-Objective Airport Gate Scheduling with Controllable Processing Times Using Harmony Search and NSGA-II Algorithms
        Morteza khakzar Bafruei Sananz khatibi Morteza Rahmani
        10.22094/joie.2018.234
      • Open Access Article
        • Abstract Page
        • Full-Text

        60 - Service Performance Improvement Model: The Case of Teklehaymanot General Hospital
        Eshetie Berhan Selam Yibeltal Sisay Geremew
        10.22094/joie.2017.716.1452
      • Open Access Article
        • Abstract Page
        • Full-Text

        61 - The Preemptive Just-in-time Scheduling Problem in a Flow Shop Scheduling System
        Javad Rezaeian Sadegh Hosseini-Kia Iraj Mahdavi
        10.22094/joie.2017.499.11
      • Open Access Article
        • Abstract Page
        • Full-Text

        62 - Integrated Due Date Setting and Scheduling on a Single Machine Considering an Unexpected Unavailability
        Mehdi Iranpoor Seyed Mohammad Taghi Fatemi Ghomi
        10.22094/joie.2017.644.1415
      • Open Access Article
        • Abstract Page
        • Full-Text

        63 - Parallel Jobs Scheduling with a Specific Due Date: Asemi-definite Relaxation-based Algorithm
        Javad Behnamian
        10.22094/joie.2017.599.1385
      • Open Access Article
        • Abstract Page
        • Full-Text

        64 - Optimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms
        Javad Hasanpour Mohammad Ghodoosi Zahra Sadat Hosseini
        10.22094/joie.2016.263
      • Open Access Article
        • Abstract Page
        • Full-Text

        65 - Machine scheduling for multitask machining
        Saleh Yavari Ahmed Azab Mohammed Fazle Baki Mikel Alcelay Justin Britt
        10.22094/joie.2020.1869865.1660
      • Open Access Article
        • Abstract Page
        • Full-Text

        66 - Nurse Scheduling Problem by Considering Fuzzy Modeling Approach to Treat Uncertainty on Nurses’ Preferences for Working Shifts and Weekends off
        Hamed Jafari Hassan Haleh
        10.22094/joie.2019.576759.1595
      • Open Access Article
        • Abstract Page
        • Full-Text

        67 - Minimizing the operational costs in a flexible flow shop scheduling problem with unrelated parallel machines
        Ali Hassani Seyed Mohamad Hasan Hosseini Foroogh Behroozi
        10.22094/joie.2021.1890852.1718
      • Open Access Article
        • Abstract Page
        • Full-Text

        68 - Scheduling on flexible flow shop with cost-related objective function considering outsourcing options
        Mojtaba Enayati Ebrahim Asadi-Gangraj Mohammad Mahdi Paydar
        10.22094/joie.2020.1873983.1674
      • Open Access Article
        • Abstract Page
        • Full-Text

        69 - An Integrated Bi-Objective Mathematical Model for Minimizing Take-off Delay and Passenger Dissatisfaction
        Razieh Larizadeh Reza Ramezanian
        10.22094/joie.2021.1914607.1804
      • Open Access Article
        • Abstract Page
        • Full-Text

        70 - A bi-objective mathematical model for the patient appointment scheduling problem in outpatient chemotherapy clinics using Fuzzy C-means clustering: A case study
        Masoud Rabbani Alireza Khani amirreza Zare niloofar Akbarian-Saravi
        10.22094/joie.2022.1928133.1849
      • Open Access Article
        • Abstract Page
        • Full-Text

        71 - Two-Machine Open Shop Scheduling with Proportionally Deteriorating Jobs and Makespan Objective
        Ching-Fang Liaw
        10.22094/joie.2022.1949101.1926
      • Open Access Article
        • Abstract Page
        • Full-Text

        72 - A mathematical programming model for single round-robin tournament problem: A case study of Volleyball Nations League
        Hamed Jafari Morteza Rajabzadeh
        10.22094/joie.2022.1891205.1721
      • Open Access Article
        • Abstract Page
        • Full-Text

        73 - Developing and solving the multi-objective flexible and sustainable job shop scheduling problem with reverse flow and job rotation considerations in uncertain situations
        Arsalan Shojaei Davood Jafari Mehran Khalag Parshang Dokohaki
        10.22094/joie.2023.1962418.1976
      • Open Access Article
        • Abstract Page
        • Full-Text

        74 - An Efficient Extension of Network Simplex Algorithm
        Hassan Rashidi Edward P.K Tsang
      • Open Access Article
        • Abstract Page
        • Full-Text

        75 - Scheduling in Container Terminals using Network Simplex Algorithm
        Hassan Rashidi
      • Open Access Article
        • Abstract Page
        • Full-Text

        76 - A Bi-objective Pre-emption Multi-mode Resource Constrained Project Scheduling Problem with due Dates in the Activities
        zahra Sadat Hosseini Javad Hassan pour Emad Roghanian
      • Open Access Article
        • Abstract Page
        • Full-Text

        77 - A Simulated Annealing Algorithm for Multi Objective Flexible Job Shop Scheduling with Overlapping in Operations
        Mehrzad Abdi Khalife Babak Abbasi Amirhossein Kamali Dolat abadi
      • Open Access Article
        • Abstract Page
        • Full-Text

        78 - Meta heuristic for Minimizing Makespan in a Flow-line Manufacturing Cell with Sequence Dependent Family Setup Times
        Behzad Nikjo Javad Rezaeian
      • Open Access Article
        • Abstract Page
        • Full-Text

        79 - A New Approach in Job Shop Scheduling: Overlapping Operation
        parviz Fattahi mohammad Saidi Mehrabad
      • Open Access Article
        • Abstract Page
        • Full-Text

        80 - Multi-objective and Scalable Heuristic Algorithm for Workflow Task Scheduling in Utility Grids
        Vahid Kahejvand Hossein Pedram Mostafa Zandieh
      • Open Access Article
        • Abstract Page
        • Full-Text

        81 - An Iterated Greedy Algorithm for Flexible Flow Lines with Sequence Dependent Setup Times to Minimize Total Weighted Completion Time
        Bahman Naderi mostafa Zandieh Seyed Mohammad Taghi Fatemi Ghomi
      • Open Access Article
        • Abstract Page
        • Full-Text

        82 - The preemptive resource-constrained project scheduling problem subject to due dates and preemption penalties: An integer programming approach
        Behrouz Afshar nadjafi Shahram Shadrokh
      • Open Access Article
        • Abstract Page
        • Full-Text

        83 - A Mathematical Model for a Flow Shop Scheduling Problem with Fuzzy Processing Times
        Jafar Razmi Reza Tavakoli moghaddam Mohammad Saffari
      • Open Access Article
        • Abstract Page
        • Full-Text

        84 - Exact Mixed Integer Programming for Integrated Scheduling and Process Planning in Flexible Environment
        Mohammad Saidi Mehrabad Saeed Zarghami
      • Open Access Article
        • Abstract Page
        • Full-Text

        85 - An Exact Algorithm for the Mode Identity Project Scheduling Problem
        Behrouz Afshar Nadjafi Amir Rahimi Hamid Karimi
      • Open Access Article
        • Abstract Page
        • Full-Text

        86 - A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm
        Sedigheh Nader Abadi Emad Roghanian Hadi Aghassi
      • Open Access Article
        • Abstract Page
        • Full-Text

        87 - A Memetic Algorithm for Hybrid Flowshops with Flexible Machine Availability Constraints
        Fariborz Jolai mostafa zandieh Bahman Naderi
      • Open Access Article
        • Abstract Page
        • Full-Text

        88 - Modelling and Scheduling Lot Streaming Flexible Flow Lines
        Bahman naderi Mehdi Yazdani
      • Open Access Article
        • Abstract Page
        • Full-Text

        89 - Fuzzy Programming for Parallel Machines Scheduling: Minimizing Weighted Tardiness/Earliness and Flow Time through Genetic Algorithm
        Mohammad Asghari Samaneh Nezhadali
      • Open Access Article
        • Abstract Page
        • Full-Text

        90 - A Multi-Purpose Mathematical Model for Solving Multi-Mode Resource Constrained Project Scheduling Problem(M-RCPSP) and Environmental Effects:Augmented Ε-Constraint Method
        Hosseinali Heydari Heirsh Soltanpanah Hiva Faroughi Ayoub Rahimzadeh
        10.30495/qjopm.2019.668705
      • Open Access Article
        • Abstract Page
        • Full-Text

        91 - Provide a model for manpower scheduling using a hybrid meta-innovative algorithm in the Water and Sewerage Company
        seyed ahmad shayan nia roghayeh mirataollahi olya
      • Open Access Article
        • Abstract Page
        • Full-Text

        92 - Presenting a super-heuristic genetic algorithm for investment in project resource
        nooshin hafezi zadeh
        https://doi.org/10.71584/MGMT.2023.980439
      • Open Access Article
        • Abstract Page
        • Full-Text

        93 - ارائه یک روشی براساس الگوریتم نیروی گرانشی توسعه یافته برای حل مسئله زمانبندی
        عزیز نوروزی نودهی عباس طلوعی اشلقی
      • Open Access Article
        • Abstract Page
        • Full-Text

        94 - Multi-Objective Optimization for Coverage Aware Sensor Node Scheduling in Directional Sensor Networks
        Nemat Mottaki Homayun Motameni Hosein Mohamadi
      • Open Access Article
        • Abstract Page
        • Full-Text

        95 - Solving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times
        Abolfazl Adressi Reza Bashirzadeh Vahid Azizi Saeed Tasouji Hassanpour
      • Open Access Article
        • Abstract Page
        • Full-Text

        96 - Solving the Problem of Scheduling Unrelated Parallel Machines with Limited Access to Jobs
        Mohammadreza Naghibi Abolfazl Adressi
      • Open Access Article
        • Abstract Page
        • Full-Text

        97 - Scheduling Problem of Virtual Cellular Manufacturing Systems (VCMS); Using Simulated Annealing and Genetic Algorithm based Heuristics
        Saeed Taouji Hassanpour Reza Bashirzadeh Abolfazl Adressi Behnam Bahmankhah
      • Open Access Article
        • Abstract Page
        • Full-Text

        98 - A New Algorithm for Link Scheduling in MIMO Wireless Mesh Networks with Various Interference Condition by Ant Colony Algorithm
        Sadegh Zarmehi Mahmoud Daneshvar Farzanegan Avid Avokh
      • Open Access Article
        • Abstract Page
        • Full-Text

        99 - A Decentralized Framework to Improve Resilience in Microgrids Based on Peer to Peer Transactions, Considering Independence and Privacy
        Mohammad Doostizadeh Hassan Jalili Abbas Babaei
      • Open Access Article
        • Abstract Page
        • Full-Text

        100 - A Three-Level Framework for Determining the Optimal Strategy of Microgrids to Participate in the Day-Ahead Competitive Market by Considering Electric Vehicles and Demand Response Programs
        Abolfazl Bayatian Amir Ahmarinejad
      • Open Access Article
        • Abstract Page
        • Full-Text

        101 - Upper Bound for Queue length in Regulated Burst Service Scheduling
        Mahmood Daneshvar Farzanega Hossein Saeedi
      • Open Access Article
        • Abstract Page
        • Full-Text

        102 - یک مدل بهینه سازی بهبود یافته برای زمانبندی یک خط لوله درختی شکل چند محصولی
        Mehrnoosh Taherkhani
      • Open Access Article
        • Abstract Page
        • Full-Text

        103 - بکارگیری تئوری محدودیت ها در برنامه ریزی و مدیریت تولید-مطالعه موردی
        Ahmad Hooshmand Ali Reza Mehrazeen Ali Reza Davoody Mohamad Reza Shorvarzi
      • Open Access Article
        • Abstract Page
        • Full-Text

        104 - A Branch and Bound for single machine stochastic batch scheduling with delivery costs. A Chance Constraint approach (Case study in Iran)
        Hamidreza Haddad
      • Open Access Article
        • Abstract Page
        • Full-Text

        105 - Presenting a Mathematical Programming Model for Routing and Scheduling of Cross-Dock and Transportation in Green Reverse Logistics Network of COVID-19 Vaccines
        Pezhman Abbasi Tavallali Mohammadreza Feylizadeh Atefeh Amindoust
      • Open Access Article
        • Abstract Page
        • Full-Text

        106 - GASA: Presentation of an Initiative Method Based on Genetic Algorithm for Task Scheduling in the Cloud Environment
        Somayeh Taherian Dehkordi Vahid Khatibi Bardsiri
      • Open Access Article
        • Abstract Page
        • Full-Text

        107 - A new Shuffled Genetic-based Task Scheduling Algorithm in Heterogeneous Distributed Systems
        Mirsaeid Hosseini
      • Open Access Article
        • Abstract Page
        • Full-Text

        108 - Scheduling of Real-time Processes Distribution on Multiprocessor Using Meta-Heuristic Ant Colony Algorithms, Genetics and PSO
        Mostafa Soleymani Hossein Nematzadeh
      • Open Access Article
        • Abstract Page
        • Full-Text

        109 - An Efficient Genetic Algorithm for Task Scheduling on Heterogeneous Computing Systems Based on TRIZ
        Mehdi Akbari
      • Open Access Article
        • Abstract Page
        • Full-Text

        110 - Task Scheduling Using Particle Swarm Optimization Algorithm with a Selection Guide and a Measure of Uniformity for Computational Grids
        Mona Torabi
      • Open Access Article
        • Abstract Page
        • Full-Text

        111 - Solving the Job Scheduling Problem in Open Shop Using Bat Algorithm
        Sima Sivandi
      • Open Access Article
        • Abstract Page
        • Full-Text

        112 - A Hybrid Genetic Algorithm for the Open Shop Scheduling with Makespan and Total Completion Time
        Behnam Barzegar Homayun Motameni Ali Khosrozadeh ghomi Azadeh Divsalar
      • Open Access Article
        • Abstract Page
        • Full-Text

        113 - Task Scheduling in Fog Computing: A Survey
        Abbas Najafizadeh Afshin Salajegheh Amir Masoud Rahmani Amir Sahafi
      • Open Access Article
        • Abstract Page
        • Full-Text

        114 - Solving Flexible Job-Shop Scheduling Problem using Hybrid Algorithm Based on Gravitational Search Algorithm and Particle Swarm Optimization
        Behnam Barzegar Homayun Motameni
      • Open Access Article
        • Abstract Page
        • Full-Text

        115 - Evaluating of Feasible Solutions on Parallel Scheduling Tasks with DEA Decision Maker
        Mirsaeid Hosseini Shirvani
      • Open Access Article
        • Abstract Page
        • Full-Text

        116 - Modelling and robust scheduling of two-stage assembly flow shop under uncertainty in assembling times
        Maryam seyedhamzeh hossein amoozad khalili Seyed Mohammad Hassan Hosseini mortaza honarmand azimi Kamaladdin Rahmani
        10.30495/jiei.2021.1937425.1150
      • Open Access Article
        • Abstract Page
        • Full-Text

        117 - Aircraft routing problem considering various maintenance operation factors: A literature review
        Masoumeh Mirjafari Alireza Rashidi Komijan Ahmad Shoja
        10.30495/jiei.2023.1988013.1308
      • Open Access Article
        • Abstract Page
        • Full-Text

        118 - Improved TLBO and JAYA algorithms to solve new fuzzy flexible job-shop scheduling problems
        Raviteja Buddala Siba Sankar Mahapatra Manas Ranjan Singh Bhanu Chandar Balusa Purusotham Singamsetty Venkata Phanikrishna Balam
        10.30495/jiei.2023.1935150.1142
      • Open Access Article
        • Abstract Page
        • Full-Text

        119 - A multi-product, multi-period and multi-hub routing and scheduling model for offshore logistics
        Alireza Rashidi Komijan Mehdi  Razi Peyman  Afzal Vahidreza Ghezavati Kaveh Khalili Damghani
      • Open Access Article
        • Abstract Page
        • Full-Text

        120 - Robust Scheduling and Planning of Operating Rooms and Sterilization Unit with Emergency and Elective Patients: Two Metaheuristic Algorithms
        Fatemeh Arjmandi Parvaneh Samouei
      • Open Access Article
        • Abstract Page
        • Full-Text

        121 - An electromagnetism-like metaheuristic for open-shop problems with no buffer
        Bahman Naderi Esmaeil Najafi Mehdi Yazdani
      • Open Access Article
        • Abstract Page
        • Full-Text

        122 - A novel hybrid genetic algorithm to solve the make-to-order sequence-dependent flow-shop scheduling problem
        Mohammad Mirabi S. M. T. Fatemi Ghomi F . Jolai
      • Open Access Article
        • Abstract Page
        • Full-Text

        123 - Dynamic configuration and collaborative scheduling in supply chains based on scalable multi-agent architecture
        Fu-Shiung Hsieh
      • Open Access Article
        • Abstract Page
        • Full-Text

        124 - Cat swarm optimization for solving the open shop scheduling problem
        Abdelhamid Bouzidi Mohammed Essaid Riffi Mohammed Barkatou
      • Open Access Article
        • Abstract Page
        • Full-Text

        125 - Optimisation of assembly scheduling in VCIM systems using genetic algorithm
        Son Duy Dao Kazem Abhary Romeo Marian
      • Open Access Article
        • Abstract Page
        • Full-Text

        126 - Maximizing the nurses’ preferences in nurse scheduling problem: mathematical modeling and a meta-heuristic algorithm
        Hamed Jafari Nasser Salmasi
      • Open Access Article
        • Abstract Page
        • Full-Text

        127 - New scheduling rules for a dynamic flexible flow line problem with sequence-dependent setup times
        Hamidreza Kia Seyed Hassan Ghodsypour Hamid Davoudpour
      • Open Access Article
        • Abstract Page
        • Full-Text

        128 - A heuristic approach for multi-stage sequence-dependent group scheduling problems
        N Salmasi
      • Open Access Article
        • Abstract Page
        • Full-Text

        129 - Locomotive assignment problem with train precedence using genetic algorithm
        Siamak Noori Seyed Farid Ghannadpour
      • Open Access Article
        • Abstract Page
        • Full-Text

        130 - Integrated model for pricing, delivery time setting, and scheduling in make-to-order environments
        Hamid Sattari Garmdare M. M . Lotfi Mahboobeh Honarvar
      • Open Access Article
        • Abstract Page
        • Full-Text

        131 - Minimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times
        Samaneh Noori-Darvish Reza Tavakkoli-Moghaddam
      • Open Access Article
        • Abstract Page
        • Full-Text

        132 - A fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates
        A.H Gharehgozli
      • Open Access Article
        • Abstract Page
        • Full-Text

        133 - JIT single machine scheduling problem with periodic preventive maintenance
        Mohammadreza Shahriari Naghi Shoja Amir Ebrahimi Zade Sasan Barak Mani Sharifi
      • Open Access Article
        • Abstract Page
        • Full-Text

        134 - An improved genetic algorithm for multidimensional optimization of precedence-constrained production planning and scheduling
        Son Duy Dao Kazem Abhary Romeo Marian
      • Open Access Article
        • Abstract Page
        • Full-Text

        135 - Solving the flexible job shop problem by hybrid metaheuristics-based multiagent model
        Houssem Eddine Nouri Olfa Belkahla Driss Khaled Ghe´dira
      • Open Access Article
        • Abstract Page
        • Full-Text

        136 - A three-stage assembly flow shop scheduling problem with blocking and sequence-dependent set up times
        Aref Maleki-Darounkolaei Mahmoud Modiri Reza Tavakkoli-Moghaddam Iman Seyyedi
      • Open Access Article
        • Abstract Page
        • Full-Text

        137 - Nurse rostering using fuzzy logic: A case study
        A Eskandari K Ziarati
      • Open Access Article
        • Abstract Page
        • Full-Text

        138 - Techniques for cash management in scheduling manufacturing operations
        Mehdy Morady Gohareh Naser Shams Gharneh Reza Ghasemy Yaghin
      • Open Access Article
        • Abstract Page
        • Full-Text

        139 - Scheduling of flexible manufacturing systems using genetic algorithm: A heuristic approach
        Vijay Kumar A. N. Narashima Murthy Krishnappa Chandrashekara
      • Open Access Article
        • Abstract Page
        • Full-Text

        140 - Lot sizing with rework and different inspection costs
        Rasoul Haji Alireza Haji
      • Open Access Article
        • Abstract Page
        • Full-Text

        141 - Splittable stochastic project scheduling with constrained renewable resource
        S.S Hashemin S.M.T Fatemi Ghomi
      • Open Access Article
        • Abstract Page
        • Full-Text

        142 - A genetic algorithm approach for problem
        E Mehdizadeh R Tavakkoli-Moghaddam
      • Open Access Article
        • Abstract Page
        • Full-Text

        143 - Yard crane scheduling in port container terminals using genetic algorithm
        H Javanshir S.R Seyedalizadeh Ganji
      • Open Access Article
        • Abstract Page
        • Full-Text

        144 - An algorithm for multi-objective job shop scheduling problem
        Parviz Fattahi Mohammad Saidi Mehrabad Mir B. Aryanezhad
      • Open Access Article
        • Abstract Page
        • Full-Text

        145 - Flexible job shop scheduling under availability constraints
        M.T Taghavi-Fard H.R Dehnar Saidy
      • Open Access Article
        • Abstract Page
        • Full-Text

        146 - Technical Note: An opportunity cost maintenance scheduling framework for a fleet of ships: A case study
        O.E Charles-Owaba A.E Oluleye F.A Oyawale S.K Oke
      • Open Access Article
        • Abstract Page
        • Full-Text

        147 - Flexible resource management and its effect on project cost and duration
        Desta A. Hailemariam Xiaojun Shan Sung H. Chung Mohammad T. Khasawneh William Lukesh Angela Park Adam Rose Denis C . Pinha Rashpal S. Ahluwalia
      • Open Access Article
        • Abstract Page
        • Full-Text

        148 - Role of batch size in scheduling optimization of flexible manufacturing system using genetic algorithm
        Muhammad Umair Akhtar Muhammad Huzaifa Raza Muhammad Shafiq
      • Open Access Article
        • Abstract Page
        • Full-Text

        149 - Modeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition
        Sama Ahmadpour Vahidreza Ghezavati
      • Open Access Article
        • Abstract Page
        • Full-Text

        150 - An integrated approach for scheduling flexible job-shop using teaching–learning-based optimization method
        Raviteja Buddala Siba Sankar Mahapatra
      • Open Access Article
        • Abstract Page
        • Full-Text

        151 - Scheduling of undergraduate thesis examination: a case study in Industrial Engineering Department of Universitas Sebelas Maret
        Cucuk Nur Rosyidi Endah Budiningsih Wakhid Ahmad Jauhari
      • Open Access Article
        • Abstract Page
        • Full-Text

        152 - A TCSC Control Based on Stabilizing Delay Effect for Inter-Area Oscillation Damping in a Power System with Time Delay
        Yasaman Yardani Sefidi Rasoul Asghari Babak Mozafari Mohammad Salay Naderi
      • Open Access Article
        • Abstract Page
        • Full-Text

        153 - Joint Coordination of Wind Farms and Pumped Storage Plants in Generation Scheduling Using Modified Particle Swarm Optimization with Bacteria Foraging Concept
        Hassan Siahkali
      • Open Access Article
        • Abstract Page
        • Full-Text

        154 - Optimal Scheduling of a Renewable-based Micro Grid Considering Reliability Effect
        Amir Ghaedi Reza Sedaghati Mehrdad Mahmoudian
        10.30495/SPRE.2024.1056077
      • Open Access Article
        • Abstract Page
        • Full-Text

        155 - The Optimal Timing of Capital Investment, Financing and Financing
        نصیبه ولی زاده جواد رمضانی مهدی خلیل پور
      • Open Access Article
        • Abstract Page
        • Full-Text

        156 - Optimizing Operation Scheduling in a Microgrid Considering Probabilistic Uncertainty and Demand Response Using Social Spider Algorithm
        Amir Mortazi Seyedamin Saeed Hamidreza Akbari
        10.30495/ijsee.2022.1968838.1231
      • Open Access Article
        • Abstract Page
        • Full-Text

        157 - An Optimal Charge Framework Using Multivariate Copula for Day-ahead Scheduling of Electric Vehicle in Parking Lot Providing Power Markets
        Mohamad Amin Gharibi Hamed Nafisi Hossein Askarian Abyaneh Amin Hajizadeh
        10.30495/ijsee.2022.1954526.1183
      • Open Access Article
        • Abstract Page
        • Full-Text

        158 - Optimal Placement and Scheduling of Switched Capacitor Banks Using Multi-Objective Hybrid Optimization Algorithm under Load Uncertainty Conditions
        Ehsan Akbari
        10.30495/ijsee.2022.1968418.1229
      • Open Access Article
        • Abstract Page
        • Full-Text

        159 - Synchronizing of Smart Homes in Microgrids using Whale Optimization Algorithm
        Farhad Nourozi Navid Ghardash khani
      • Open Access Article
        • Abstract Page
        • Full-Text

        160 - The Role of Neural Networks in Improving Construction Project Scheduling
        Akbar Alidadi Shamsabadi Iman Pishkar Milad  Torabi Anaraki
      • Open Access Article
        • Abstract Page
        • Full-Text

        161 - A Swarm-based Scheduling Algorithm for Lifetime Improvement of Visual Sensor Networks
        Mir Gholamreza Mortazavi Mirsaeid Hosseini Shirvani Arash Dana Mahmood Fathy
        10.30495/ijsee.2024.2003747.1297
      • Open Access Article
        • Abstract Page
        • Full-Text

        162 - Flexible Scheduling of Active Distribution Networks for Market Participation with Considering DGs Availability
        Milad Hoseinpour M.-R Haghifam
        IJSEE-1705-1050
      • Open Access Article
        • Abstract Page
        • Full-Text

        163 - MODELLING AND ANALYSIS OF A DISCRETE-TIME PRIORITY QUEUING COMPUTER NETWORK WITH PRIORITY JUMPS USING PROBABILITY GENERATING FUNCTIONS
        Deepak C. Pandey Arun K. Pal
      • Open Access Article
        • Abstract Page
        • Full-Text

        164 - A SIMPLIFIED LAGRANGIAN MULTIPLIER APPROACH FOR FIXED HEAD SHORT-TERM HYDROTHERMAL SCHEDULING
        S. Kavitha Nirmala P.Ratchagar
      • Open Access Article
        • Abstract Page
        • Full-Text

        165 - Irrigation Water Volume and Water Efficiency of Walnut Orchards in As-Suwayda, Syria
        Hussam Abdullah Abbas Ammar Dham Hamza Radhi Zainab Hussein Adhub Majeed M. Abid Noora M. Hameed Hanan Askar Hussny
        10.22034/jon.2023.1978788.1208
      • Open Access Article
        • Abstract Page
        • Full-Text

        166 - A data-driven model for scheduling and sequencing tasks in industry 4.0 compliant production systems with flow shop
        Danial Hatami Alireza Irajpour Reza Ehtesham Rasi
      • Open Access Article
        • Abstract Page
        • Full-Text

        167 - Planning and scheduling of green production and distribution considering several products in the chemical industry
        Asghar Arabi Hojat Nabovati
        https://doi.org/10.71769/jgm.2025.1106336
      • Open Access Article
        • Abstract Page
        • Full-Text

        168 - A TOPSIS-Based Improved Weighting Approach With Evolutionary Computation
        Mithat Zeydan Murat  Güngör Burak Urazel
        10.30495/TFSS.2024.1115434
      • Open Access Article
        • Abstract Page
        • Full-Text

        169 - Tasks scheduling in distributed fog layer and cloud computing systems using dung beetle optimization algorithm
        mohsen eghbali reza aziz
        10.71623/joins.2024.1118497
      • Open Access Article
        • Abstract Page
        • Full-Text

        170 - Artificial Bee Colony to Solve the Berth Allocation and Crane Assignment Problem
        Sara SOUAINI Jamal  Benhra Salma  Mouatassim
        10.22094/QJIE.2024.1120903
      • Open Access Article
        • Abstract Page
        • Full-Text

        171 - Virtual alliance in hospital network for operating room scheduling: Benders decomposition
        Mahdis Lotfi Javad Behnamian
        10.22094/QJIE.2024.1121407
      • Open Access Article
        • Abstract Page
        • Full-Text

        172 - The multi-objective model of workshop production flow scheduling considering machine preparation times
        majid motamedi Mohammad Hossein Darvish Motevali
      • Open Access Article
        • Abstract Page
        • Full-Text

        173 - Investigation of applied water and water productivity of wheat fields in Fars province
        Mohammad Ali Shahrokhnia Amir Eslami Javad Baghani
        10.30495/wej.2021.27044.2288
      • Open Access Article
        • Abstract Page
        • Full-Text

        174 - Task scheduling in cloud computing using deep reinforcement learning
        Behnam Salari Mehdi  Akbari ّFaramarz Safi Behrang  Barekatain
      • Open Access Article
        • Abstract Page
        • Full-Text

        175 - Real-Time Scalable Task Offloading in Edge Computing Using Semi-Markov Decision Processes and Attention-Based Deep Reinforcement Learning
        Abbas  Mirzaei Nasser Mikaeilvand Babak Nouri-Moghaddam Sajjad Jahanbakhsh Gudakahriz Ailin Khosravani Fatemeh Tahmasebizade Ali Seifi Hosein Hatami
        https://doi.org/10.82553/josc.2025.140309061191686
      • Open Access Article
        • Abstract Page
        • Full-Text

        176 - Developing and Calibrating an Autonomy Scale for EFL Learners through an Adapted Model of Task Difficulty
        Farhad Motaharikia Abdollah Baradaran Hamid Marashi
      • Open Access Article
        • Abstract Page
        • Full-Text

        177 - Nurse Scheduling Problem Optimization based on Water Flow-like, Vibration Damping and Bee Colony Algorithms
        Parisa Shahnazari-Shahrezaei
        10.71932/ijm.2025.1201016

Sanad


Sanad is a platform for managing Azad University publications

Links


  • Islamic Azad University
  • Relevant Journals of the Ministry of Science, Research and Technology
  • Iranian Journals IndexedIn ISI

Related Centers


  • Office of the Supreme Leader
  • Presidential Institution
  • Ministry of Science, Research and Technology
  • Ministry of Health and Medical Education
  • Community Communication Center (SAMS)

Technical Support


  • Phone : +98 21 22222222
  • Email : journals@iau.ac.ir

Official pages



  • Home Page
  • Site Map
  • Islamic Azad University
  • Contact Us
  • Home
  • Site Map
  • Islamic Azad University
  • Contact Us

The rights to this website are owned by the Raimag Press Management System.
Copyright © 2021-2025

Home| Login| About Us| Contact Us|
[فارسی] [العربية] [fa] [ar]
  • IAU
  • Login