A Heuristic Algorithm for Solving Single Machine Scheduling Problem with Periodic Maintenance
Subject Areas : Business StrategyAmir Ebrahimi Zade 1 , Mohammad Bagher Fakhrzad 2 , Mohsen Hasaninezhad 3
1 - Department of Industrial Engineering,
Yazd University, Yazd, Iran
2 - Department of Industrial Engineering,
Yazd University, Yazd, Iran
3 - Department of Industrial Engineering,
Iran University of Science and Technology, Tehran, Iran
Keywords:
Abstract :
[1] Pinedo, M.L. (2002). Scheduling: Theory, Algorithms, and Systems (Vol. 1) New Jersey: Springer.
[2] Graham, R. L., Lawler, E. L., Lenstra, J. K., & Kan, A. H. G. Rinnooy. (1979). Optimization and Approximation in Deterministic Sequencing and Scheduling: a Survey. In E. L. J. P.L. Hammer & B. H. Korte (Eds.), Annals of Discrete Mathematics; 5: 287-326.
[3] Pinedo, M., Rammouz, E. (1988). A note on stochastic scheduling on a single machine subject to breakdown and repair. Probability in the Engineering and Information- National Sciences; 2:41–9.
[4] Birge, J., Frenk, JBG, Mittenthal, J., Rinnooy Kan, AHG. (1990). Single-machine scheduling subject to stochastic breakdowns. Naval Research Logistics; 37:664–77.
[5] Frostig, E. (1991). A note on stochastic scheduling on a single machine subject to breakdown-the preemptive repeat model. Probability, Engineering and Informational Sciences; 5:349–54.
[6] Adiri, I., Bruno, J., Frostig, E., Rinnooy Kan, AHG. (1989). Single machine flow-time scheduling with a single breakdown. Acta Informatica; 26:679–96.
[7] Adiri, I., Frostig, E., Rinnooy Kan, AHG. (1991). Scheduling on a single machine with a single breakdown to minimize stochastically the number of tardy jobs. Naval Research Logistics; 38:261–71.
[8] Akturk, MS., Ghosh, JB., Gunes, ED. (2003). Scheduling with tool changes to minimize total completion time: a study of heuristics and their performance. Naval Research Logistics; 50:15–30.
[9] Akturk, MS., Ghosh, JB., Gunes ED. (2004). Scheduling with tool changes to minimize total completion time: basic results and SPT performance. European Journal of Operations Research; 157:784–90.
[10] Ecker, KH. Gupta, JND. (2005). Scheduling tasks on a flexible manufacturing machine to minimize tool change delays. European Journal of Operations Research; 164:627–38.
[11] Chen, JS. (2008). Optimization models for the tool change scheduling problem. Omega; 36:888–94.
[12] Choi, Y-C., Kim, Y-D. (2001). Tool replacement policies for a machining center producing multiple types of products with distinct due dates. International Journal of Production Research; 39:907–21.
[13] Yang, D.L., Hung, C.L., Hsu, C.J., Chern, M.S., (2002). Minimizing the makespan in a single machine scheduling problem with a flexible maintenance. Journal of the Chinese Institute of Industrial Engineers; 19: 63–66.
[14] Qi, X., Chen, T., Tu. F. (1999). Scheduling the maintenance on a single machine. Journal of the Operational Research Society; 50:1071–8.
[15] Chen, JS. (2006). Single machine scheduling with flexible and periodic maintenance. Journal of the Operational Research Society; 57:703–10.
[16] Low, C., Ji, M., Hsu, C-J., Su, C-T. (2010). Minimizing the makespan in a single machine scheduling problems with flexible and periodic maintenance. Applied Mathematical Modeling; 34: 334–42.
[17] Liao, CJ. Chen, WJ. (2003). Single-machine scheduling with periodic maintenance and nonresumable jobs. Computers and Operations Research; 30:1335–47.
[18] Chen, WJ. (2006). Minimizing total flow time in the single machine scheduling problem with periodic maintenance. Journal of the Operational Research Society; 57:410 –5.
[19] Chen, WJ. (2009). Minimizing number of tardy jobs on a single machine subject to periodic maintenance. Omega; 37:591–9.
[20] Lee, S-H., Lee, I-G. (2008). Heuristic algorithm for the single machine scheduling with periodic maintenance. Journal of the Korean Institute of Industrial Engineers; 34:318–27.
[21] Lau, HC. Zhang, C. (2004). Job scheduling with unfixed availability constraints. In: Proceedings of 35th Meeting of the Decision Sciences Institute. Boston, USA; p. 4401–6.
[22] Liao, C-J., Chen, C-M., Lin, C-H. (2007). Minimizing makespan for two parallel machines with job limit on each availability interval. Journal of the Operational Research Society 58 938–47.
[23] Dell’ Amico, M., Martello, S. (2001). Bounds for the cardinality constrained P||Cmax problem. Journal of Scheduling 4:123–38.
[24] Yang, D-L., Hsu, C-J., Kuo, W-H. (2008). A two-machine flow shop scheduling problem with a separated maintenance constraint. Computers & Operations Research 35:876–83.
[25] Hsu, C-J., Low, C., Su, C-T., (2010). A single-machine scheduling problem with maintenance activities to minimize makespan. Applied Mathematics and Computation 215: 3929–3935.
[26] Pinedo, M. (1995). Scheduling: theory, algorithms and systems. New Jersey: Prentice-Hall.
[27] Lee, C.Y., Liman, S.D. (1992). Single machine flow-time scheduling with scheduled maintenance. Acta Informatica 29, 375–382.