A Job Shop Scheduling and Location of Battery Charging Storage for the Automated Guided Vehicles (AGVs)
Subject Areas : Operation and Chain ManagementSaeed Dehnavi-Arani 1 , Ali Sabaghian 2 , Mehdi Fazli 3
1 - Department of Industrial Engineering, Yazd University, Yazd, Iran
2 - Department of Management, Naragh Branch, Islamic Azad University, Naragh, Iran
3 - Department of Industrial engineering, Iran University of Science and Technology, Tehran, Iran
Keywords:
Abstract :
Asef-Vaziri, A., Gilbert L., and Robert O. (2007). Exact and Heuristic Procedures for the Material Handling Circular Flow Path Design Problem. European Journal of Operational Research 176(2): 707–26.
Corréa, A.I., André L., and Louis M.R. (2007). Scheduling and Routing of Automated Guided Vehicles: A Hybrid Approach. Computers and Operations Research 34(6) 8.
Digani, V., Lorenzo S., Cristian S., and Cesare F.(2014). Hierarchical Traffic Control for Partially Decentralized Coordination of Multi Agv Systems in Industrial Environments. In Robotics and Automation (ICRA), 2014 IEEE International Conference on, IEEE, 6144–49.
Ebben, M.(2001). Logistic control in automated transportation networks. Beta Ph.D. thesis series D-40, Twente University Press, Enschede, The Netherlands.
ElMekkawy, T. Y., and S. Liu. (2009). A New Memetic Algorithm for Optimizing the Partitioning Problem of Tandem AGV Systems. International Journal of Production Economics 118(2): 508–20.
Glover, F., Woolsey, L. (1974). Converting the 0–1 polynomial programming problem to a 0–1 linear program. Oper Res,22:180–182
Ho, Ying-Chin, and Ping-Fong Hsieh. (2004). A Machine-to-Loop Assignment and Layout Design Methodology for Tandem AGV Systems with Multiple-Load Vehicles. International Journal of Production Research 42(4): 801–32.
Jun-jie, Z. (2007). Design of AGV battery monitoring system with smart battery monitoring chip. Hoisting and Conveying Machinery2, 4.
Kawakami, T., Takata, S. (2012). Battery Life Cycle Management for Automatic Guided Vehicle Systems. Design for Innovative Value Towards a Sustainable Society403-408.
Lee, J.H, Beom H.L, and Myoung H.C. (1998). A Real-Time Traffic Control Scheme of Multiple AGV Systems for Collision Free Minimum Time Motion: A Routing Table Approach. IEEE Transactions on Systems, Man, and Cybernetics-Part A: Systems and Humans 28(3): 347–58.
McHaney, R.(1995). Modeling battery constraints in discreteevent automated guided vehicle systems. International Journal of Production Research 33 (11), 3023–3040.
Pinlam, W., Mooghdaharn, C., Bupparit, Y. (2002). Automatic battery recharging station for AGVs. Advanced Micro Devices.
Qiu, L, Wen-Jing H., Shell-Ying H., and Han W. (2002). Scheduling and Routing Algorithms for AGVs: A Survey.” International Journal of Production Research 40(3)
Saidi-Mehrabad, M., Dehnavi-Arani., S., Evazabadian, F., and Mahmoodian, V. (2015). An Ant Colony Algorithm (ACA) for solving the new integrated model of job shop scheduling and conflict-free routing of AGVs. Computers and Industrial Engineering 86, 2-13.
Ventura, José A, and Brian Q.R. (2009). Optimal Location of Dwell Points in a Single Loop AGV System with Time Restrictions on Vehicle Availability. European Journal of Operational Research 192(1): 93–104.
Vis, I. (2006). Survey of research in the design and control of automated guided vehicle systems. European Journal of Operational Research, 170(3), 677–709.
Weyns, D., Nelis B., and Tom H. (2006). Gradient Field-Based Task Assignment in an Agv Transportation System. In Proceedings of the Fifth International Joint Conference on Autonomous Agents and Multiagent Systems, ACM, 842–49.