Scheduling on flexible flow shop with cost-related objective function considering outsourcing options
Subject Areas : Operation and Chain ManagementMojtaba Enayati 1 , Ebrahim Asadi-Gangraj 2 , Mohammad Mahdi Paydar 3
1 - Department of Industrial Engineering, Babol Noshirvani University of Technology, Babol, Iran
2 - Department of Industrial Engineering, Babol Noshirvani University of Technology, Babol, Iran
3 - Department of Industrial Engineering, Babol Noshirvani University of Technology, Babol, Iran
Keywords:
Abstract :
Ahmadizar, F. & Amiri, Z. (2018). Outsourcing and scheduling for a two-machine flow shop with release times. Engineering Optimization, 50(3), 483-498.
Asadi-Gangraj, E. (2018). Lagrangian relaxation approach to minimizing makespan in hybrid flow shop scheduling problem with unrelated parallel machines. Scientia Iranica E, 25(6), 3765-3775.
Asadi-Gangraj, E., (2017). Heuristic Approach to Solve Hybrid Flow-Shop Scheduling Problem with Unrelated Parallel Machines. International Journal of Industrial Engineering & Production Research, 28(1), 61-74.
Behnamian, J., (2020). Parallel Jobs Scheduling with a Specific Due Date: a Semi-Definite Relaxation-Based Algorithm. Journal of Optimization in Industrial Engineering, 13(2), 199-210.
Chan, F.T., Kumar, V. & Tiwari, M.K. (2009). The relevance of outsourcing and leagile strategies in performance optimization of an integrated process planning and scheduling model. International Journal of Production Research, 47(1), 119-142.
Chen, Z.-L. & Li, C.-L. (2008). Scheduling with subcontracting options. IIE transactions, 40(12), 1171-1184.
Choi, B.-C. & Chung, J. (2011). Two-machine flow shop scheduling problem with an outsourcing option. European Journal of Operational Research, 213(1), 66-72.
Choi, B.-C. & Chung, K. (2016). Min–max regret version of a scheduling problem with outsourcing decisions under processing time uncertainty. European Journal of Operational Research, 252(2), 367-375.
Chung, D., Lee, K., Shin, K. & Park, J. (2005). A new approach to job shop scheduling problems with due date constraints considering operation subcontracts. International Journal of Production Economics, 98(2), 238-250.
Chung, D.-Y. & Choi, B.-C. (2013). Outsourcing and scheduling for two-machine ordered flow shop scheduling problems. European Journal of Operational Research, 226(1), 46-52.
Eberhart, R. & Kennedy, J. (1995). A new optimizer using particle swarm theory. In: Micro Machine and Human Science. Proceedings of the Sixth International Symposium, 39-43. IEEE
Goldberg, D.E. & Holland, J.H. (1988). Genetic algorithms and machine learning. Machine learning, 3(2), 95-99.
Guo, X. & Lei, D. (2014). Bi-objective job shop scheduling with outsourcing options. International Journal of Production Research, 52(13), 3832-3841.
Haoues, M., Dahane, M., Mouss, N.K. & Rezg, N. (2013). Integrated Optimisation of In-House Production and Outsourcing Strategy: Genetic Algorithm Based Approach. IFAC Proceedings Volumes, 46(7), 420-425.
Hosseini, S.M.H. (2019). Modeling and Solving the Job Shop Scheduling Problem Followed by an Assembly Stage Considering Maintenance Operations and Access Restrictions to Machines. Journal of Optimization in Industrial Engineering, 12(1), 63-78.
Johnson, S.M. (1954). Optimal two‐and three‐stage production schedules with setup times included. Naval Research Logistics (NRL), 1(1), 61-68.
Lee, I.S. & Sung, C. (2008). Minimizing due date related measures for a single machine scheduling problem with outsourcing allowed. European Journal of Operational Research, 186(3), 931-952.
Lee, I.S. & Sung, C. (2008). Single machine scheduling with outsourcing allowed. International Journal of Production Economics, 111(2), 623-634.
Lee, K. & Choi, B.-C. (2011). Two-stage production scheduling with an outsourcing option. European Journal of Operational Research, 213(3), 489-497.
Lee, Y.H., Jeong, C.S. & Moon, C. (2002). Advanced planning and scheduling with outsourcing in manufacturing supply chain. Computers & Industrial Engineering, 43(1-2), 351-374.
Lei, D. & Guo, X. (2016). A shuffled frog-leaping algorithm for job shop scheduling with outsourcing options. International Journal of Production Research, 54(16), 4793-4804.
Mishra, N., Choudhary, A. & Tiwari, M. (2008). Modeling the planning and scheduling across the outsourcing supply chain: a Chaos-based fast Tabu–SA approach. International Journal of Production Research, 46(13), 3683-3715.
Moghaddam, A., Yalaoui, F. & Amodeo, L. (2012). A Genetic-based Algorithm to Find Better Estimation of Non-Dominated Solutions for a Bi-objective Re-entrant Flowshop Scheduling Problem with Outsourcing. IFAC Proceedings Volumes, 45(6), 1383-1388.
Mokhtari, H. & Abadi, I.N.K. (2013). Scheduling with an outsourcing option on both manufacturer and subcontractors. Computers & Operations Research, 40(5), 1234-1242.
Mokhtari, H., Abadi, I.N.K. & Amin-Naseri, M.R. (2012). Production scheduling with outsourcing scenarios: a mixed integer programming and efficient solution procedure. International Journal of Production Research, 50(19), 5372-5395.
Nahavandi, N. & Asadi-Gangraj, E. (2014). A new lower bound for flexible flow Shop Problem with unrelated parallel machines. International Journal of Industrial Engineering & Production Research, 25(1), 65-70.
Nayeri, S., Asadi-Gangraj, E. & Emami, S. (2019). Metaheuristic algorithms to allocate and schedule of the rescue units in the natural disaster with fatigue effect. Neural Computing and Applications, 31, 7517–7537.
Neto, R.F.T., Godinho Filho, M. & Da Silva, F.M. (2015). An ant colony optimization approach for the parallel machine scheduling problem with outsourcing allowed. Journal of Intelligent Manufacturing, 26(3), 527-538.
Neto, R.T. & Godinho Filho, M. (2011). An ant colony optimization approach to a permutational flowshop scheduling problem with outsourcing allowed. Computers & Operations Research, 38(9), 1286-1293.
Qi, X. (2008). Coordinated logistics scheduling for in-house production and outsourcing. IEEE Transactions on Automation Science and Engineering, 5(1), 188-192.
Qi, X. (2009). Two-stage production scheduling with an option of outsourcing from a remote supplier. Journal of Systems Science and Systems Engineering, 18(1), 1-15.
Qi, X. (2011). Outsourcing and production scheduling for a two-stage flow shop. International Journal of Production Economics, 129(1), 43-50.
Rezaeian, J. & Zarook, Y. (2018). An efficient bi-objective genetic algorithm for the single batch- processing machine scheduling problem with sequence-dependent family setup time and non-identical job sizes. Journal of Optimization in Industrial Engineering, 11(2), 65-78.
Ruiz-Torres, A.J., Ho, J.C. & López, F.J. (2006). Generating Pareto schedules with outsource and internal parallel resources. International Journal of Production Economics, 103(2), 810-825.
Tirkolaee, E.B., Goli, A., & Weber, G.W. (2020). Fuzzy mathematical programming and self-adaptive artificial fish swarm algorithm for just-in-time energy-aware flow shop scheduling problem with outsourcing option. IEEE transactions on fuzzy systems, DOI: 10.1109/TFUZZ.2020.2998174.
Wang, S. & Cui, W. (2020). Approximation algorithms for the min-max regret identical parallel machine scheduling problem with outsourcing and uncertain processing time, International Journal of Production Research, Doi: 10.1080/00207543.2020.1766721.
Zhong, W. & Huo, Z. (2013). Single machine scheduling problems with subcontracting options. Journal of Combinatorial Optimization, 26(3), 489-498.