Minimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times
Subject Areas : Mathematical OptimizationSamaneh Noori-Darvish 1 , Reza Tavakkoli-Moghaddam 2
1 - Department of Industrial Engineering, Allame Mohades Noori University, PC: 46415-451, Noor, Iran
2 - Department of Industrial Engineering, College of Engineering, University of
Tehran, PC: 14399-57131, Tehran, Iran
Keywords:
Abstract :