New Heuristic Algorithm for Flow Shop Scheduling with 3 Machines and 2 Robots Considering the Breakdown Interval of Machines and Robots Simultaneously
Subject Areas : Design of Experiment
mahdi eghbali
1
(
MSc Student, Department of Industrial and Mechanical Engineering, Qazvin Branch, Islamic Azad University, Qazvin, Iran
)
Mohammad Saidi Mehrabad
2
(
Department of Industrial Engineering, Iran University of Science and Technology, Narmak, Tehran, Iran
)
hassan haleh
3
(
Islamic Azad University, Qazvin Branch, Department of Industrial and Mechanical Engineering, Qazvin, Iran
)
Keywords:
Abstract :