List of Articles Construction Projects Open Access Article Abstract Page Full-Text 1 - Designing a cost control system to increase competitiveness in construction projects based on the integration of PFABC and tc Hossein Toosi Arezou Chamikarpour Open Access Article Abstract Page Full-Text 2 - Risks in projects of modernization and reconstruction of old urban tissue Case Study: Mashhad Majd project ابراهیم رومینا علی ممیزان Open Access Article Abstract Page Full-Text 3 - Optimizing the Environmental Impacts of the Construction Industry with Multi-Mode Activities: The Iranian Leopold Matrix Method Sayyid ali Banihashemi Mohammad Khalilzadeh Alireza Shahraki Mohsen Rostami M. Seyed Saeedreza Ahmadizade 10.30495/jest.2021.49836.4937 Open Access Article Abstract Page Full-Text 4 - A Comprehensive Model for the Assignment of Unfinished Development Projects with their Economic Approach: Qualitative Study Hassan Ali Mohammadi Mohammad Ghasemi Kaveh Khalili Damghani Gholamreza Hashemzadeh 10.30495/jsm.2021.680460 Open Access Article Abstract Page Full-Text 5 - An Integrated Approach for Evaluation Applications of Building Information Modeling Based on Rough Number Alireza Aminrad Mohammad Miehosseini Mohammad Ehsanifar Ehsanullah Zeighami 10.30495/jsm.2022.1967274.1686 Open Access Article Abstract Page Full-Text 6 - An Overview of the Use of Solar Energy in Building Construction Projects mahsa Hojjatian Amirhossein Heravi Javad Asad Poor Open Access Article Abstract Page Full-Text 7 - Classify the Iranian’s Construction Projects Key Risks by Structural Equation Modeling Kajal Zarei Bahareh Mohebban Alireza Esmaeilzadeh Ahmad Jamalian Open Access Article Abstract Page Full-Text 8 - Selecting the portfolio of construction projects with a life cycle approach using DEMATEL and TOPSIS Fuzzy techniques (Sarchesmeh Mehrkariman Company) mohammad forozandeh mohsen roozbahani 10.30495/imj.2023.1938019.1684 Open Access Article Abstract Page Full-Text 9 - The Relationship between Employees knowledge Management and Construction Projects Performance in Iran Seyed Heidar Mirfakhr Aldini Ali Reza Naser Sadrabadi Mehrdad Morad Open Access Article Abstract Page Full-Text 10 - Using QFD to Assess the Construction Projects (Case Study: Mehr Mass Constriction Project in Kurdistan province) Heirsh Soltanpanah Said Hoseini Open Access Article Abstract Page Full-Text 11 - Identifying and prioritizing strategies for completing of sport construction projects in the country Mohamad Hesami Elham Moshkelgosha 10.30495/kmsj.2023.1983208.1095 Open Access Article Abstract Page Full-Text 12 - Identifying and evaluating the most compatible financing methods in projects (Infrastructure construction in Tehran municipalities) سید عظیم حسینی مهدی علی بخشی 10.30495/qrm.2023.705442 Open Access Article Abstract Page Full-Text 13 - A Neural Network Model Based on Support Vector Machine for Conceptual Cost Estimation in Construction Projects Behnam Vahdani Seyed Meysam Mousavi Morteza Mousakhani Mani Sharifi Hassan Hashemi Open Access Article Abstract Page Full-Text 14 - Time Prediction Using a Neuro-Fuzzy Model for Projects in the Construction Industry Behnam Vahdani Seyed Meysam Mousavi Morteza Mousakhani Hassan Hashemi 10.22094/joie.2016.231 Open Access Article Abstract Page Full-Text 15 - The Effect of Risk Dimensions on the Objectives of Construction Projects in Isfahan Municipality: An Integrated SEM and BBN Analysis Amir Hossein Nadali Jelokhani Mehdi Karbassian Sayyed Rasool Agha Davood Abdul Majid Abdul Baghi 10.30495/qjopm.2020.575033.2198 Open Access Article Abstract Page Full-Text 16 - Inspecting the Factors Affecting the Delay in Executing Civil Construction Projects in Zone One of Tabriz Municipality Houshang Taghizadeh Amir Laleh Open Access Article Abstract Page Full-Text 17 - Utilization of TOPSIS to Optimal Project Management for Maragheh City's Construction Projects Morteza Zohremotadel Seyed Hadi Eslamian Shiva Velayati 10.30495/geotech.2021.688775 Open Access Article Abstract Page Full-Text 18 - Identifying the challenges of implementing the integrated project delivery method (IPD) in large residential projects in Iran Seyed Azim Hosseini Mitra Rahkhoday Badrani 10.30495/jiei.2023.1955963.1216 Open Access Article Abstract Page Full-Text 19 - Design a Risk Allocation Model for Construction Projects (EPC) for investment asset in public sector. (Case study: Guilan water and sewage industry). bahman rasouli sina kheradyar bahman banimahd Open Access Article Abstract Page Full-Text 20 - Respecting the rights of citizens and preserving the property rights of citizens in the implementation of public and construction projects of the municipality from the point of view of judicial procedure Hamid Bazrpach Moin Sabahi Garaghani https://doi.org/10.30495/DPI.1403.1105748 Open Access Article Abstract Page Full-Text 21 - Application of Multi Criteria Decision Making models in Site selection of the Khersan-1 Dam and Hydropower plant Abbas Roozbahani Mahshid Shahbazi Sehrani Open Access Article Abstract Page Full-Text 22 - Identification and prioritization of claims management process problems in construction projects (Case study: Shiraz Municipality). afshin behboodi ardalan feili 10.30495/jupm.2022.28594.3953