Background and Objective: Selecting a suitable site for construction and demolition waste management facilities, is one of the critical decision-making issues, which requires a comprehensive evaluation. The high amount of construction and demolition waste produced
More
Background and Objective: Selecting a suitable site for construction and demolition waste management facilities, is one of the critical decision-making issues, which requires a comprehensive evaluation. The high amount of construction and demolition waste produced compared to the total production of waste makes it absolutely necessary to determine suitable sites for landfilling this type of waste. The objective of this study is to present the methodology to select a suitable site for this kind of waste.Material and Methodology: There are three steps in evaluating the sites in this research. In the first step, after determining the effective factors and determining their weight by the Eigenvector Method and hierarchically, the studied areas were evaluated with 28 criteria in a fuzzy method by geographic information system (GIS). In the second step, the suggested areas by GIS, by 7 other criteria were rated by the use of FVIKOR and the score of each area was found. In the third step Final rating of sites were done by two criteria (the achieved scores of GIS and the achieved scores of the FVIKOR method).Findings The final weight of evaluation criteria by GIS and FVIKOR methods was 0.86 and 0.14, respectively, and 21 places were ranked in three steps.Discussion and Conclusion: The approach used in this study is using (GIS) and fuzzy logic, considering the weight and relative importance of each criterion and use a suitable method for rating that increases accuracy and reliability of assessment.
Manuscript profile