Abolghasemi.Abbas
The Relationship between Entrepreneurship and Business Performance in Managers of Productive Units
[
Vol.6,
Issue
17
- AutumnYear
2011]
ahmadi.kumars
Corporate Social Responsiveness Evolutional Route and Deliver of Model for Its Conceptual Expansion in Iranian Organizations
[
Vol.6,
Issue
18
- WinterYear
2012]
B
Badiei.Hossein
Combining Green Marketing and Industrial Clusters with Special Offer for Green Industrial Cluster to Exit from Environmental Crisis in Iran
[
Vol.6,
Issue
18
- WinterYear
2012]
H
Hajiha.زهره
The Investigation of Relationship between Cash Conversion Cycle and Liquidity Ratios in Companies Listed on Tehran Stock Exchange
[
Vol.6,
Issue
18
- WinterYear
2012]
Hooshiar.Navid
Determining the Leanness Using Dimensional Analysis, AHP, and Fuzzy TOPSIS Methods (Case study: Rose Fireplace Co.)
[
Vol.6,
Issue
17
- AutumnYear
2011]
Hosayni.Rooholla
The Relationship between Human Factors of Entrepreneurship and Job Performance of Managers and Supervisors via Kuratku Model
[
Vol.6,
Issue
15
- SpringYear
2011]
J
Jafari Khanshir.Saeid
Survey and Classification of the Reasons for Iran's Industrial Property Right Reaction
[
Vol.6,
Issue
16
- SummerYear
2011]
K
Keshvari.Adnan
Assessing Project Time Management of the Morvarid Petrochemical Contractors in 5th Olefin Project via ANP
[
Vol.6,
Issue
16
- SummerYear
2011]
Khajeh.Mostafa
Application of Six Sigma Methodology for Reducing Repair Time (Case Study: Iran Khodro Agent)
[
Vol.6,
Issue
16
- SummerYear
2011]
Koohi Faigh.Azadeh
The Role of Information Technology in Designing and Implementing Knowledge Management in Telecommunication Based on Fuzzy AHP Technique
[
Vol.6,
Issue
18
- WinterYear
2012]
Kushki.Alireza
An Investigation on the Impact of the Financial Ratios and Growth Rates on Future Abnormal Stock Returns (Case Study: Iran Khodro Co.)
[
Vol.6,
Issue
18
- WinterYear
2012]
M
Medghalchi.Ali
Integration of Value Engineering and Total Quality Management for Construction
[
Vol.6,
Issue
17
- AutumnYear
2011]
Mirfakhr Aldini.Seyed Heidar
The Relationship between Employees knowledge Management and Construction Projects Performance in Iran
[
Vol.6,
Issue
18
- WinterYear
2012]
Moshdey.Ali
Analysis of the Effects of Social Networks on Entrepreneurial Opportunity Identification
[
Vol.6,
Issue
15
- SpringYear
2011]
N
namdari.Roohangiz
Developing Model of Bus Dwell Time at Regular Bus Stops (Case Study: Abadan City)
[
Vol.6,
Issue
17
- AutumnYear
2011]
Nasera-badai.Delir
An Investigation on the Impact of the Financial Ratios and Growth Rates on Future Abnormal Stock Returns (Case Study: Companies Listed in the Cement Industry)
[
Vol.6,
Issue
17
- AutumnYear
2011]
Nouri Koupaei.mehrdad
Providing a Model to Identify the Effects of Enterprise Resource Planning (ERP) Systems in Quality Management Systems
[
Vol.6,
Issue
16
- SummerYear
2011]
Nouri.Iraj
A Survey of the Effects of Working Conditions, Job Relations and Attitude Towards Safety on Job Accidents and Unsafe Work Behaviors
[
Vol.6,
Issue
15
- SpringYear
2011]
R
Rabbani.Arash
Using Fuzzy Approach in determining Multi-Level Lot-Sizing Decisions, Multiple Items with Limited Capacity in Systems Based on Material Requirements Planning (MRP)
[
Vol.6,
Issue
15
- SpringYear
2011]
Ravand.Mostafa
Investigating Causes of Delay in Performing Oil and Gas Industrial Projects in South Rich Areas National Company
[
Vol.6,
Issue
17
- AutumnYear
2011]
Salehzadeh.Reza
Proposing an Integrated Model of Clustring and QFD Approaches to Improve Quality of Services Based on Customer Type With a Case Study in Saman Bank of Qom
[
Vol.6,
Issue
16
- SummerYear
2011]
Shahvaysi.Farhad
Application of Wavelet Analysis in Estimating Systematic Risk According to Capital Asset Pricing Model
[
Vol.6,
Issue
15
- SpringYear
2011]
T
Taherifard.Morteza
Mechanism Design for Coordination of Two-Echelon Supply Chain under Stochastic Demand
[
Vol.6,
Issue
18
- WinterYear
2012]
Tavagho Hamedani.Mohammad Mehdi
Providing a Method to Buffer Sizing Determination in Critical Chain of Project Scheduling (Case study: Suliran Co.)
[
Vol.6,
Issue
17
- AutumnYear
2011]
V
Valmohamadi.Changiz
Assessment of the Effectiveness of Project Manager’s Communication with Members of Project Using DEMATEL Technique
[
Vol.6,
Issue
15
- SpringYear
2011]
Y
Yavari.Mehdi
Modeling a Manufacturing Cell Design Problem with Extended Fuzzy Multi-Objective Programming
[
Vol.6,
Issue
16
- SummerYear
2011]
Z
Zandhessami.Hessam
Assessment and Prioritization of Sazehgostar Saipa's Information Technology Processes' Gaps Based on COBIT Framework
[
Vol.6,
Issue
18
- WinterYear
2012]