M.M.Senthil Kumar
DESIGN OF AN INTEGRATED IN-LINE TRACEABILITY AND ERP SYSTEM – A CASE STUDY APPROACH
[
Vol.17,
Issue
4
- AutumnYear
2021]
Mahdavi.Zahra
A Multi-Period Berth Allocation-Scheduling Model with Different Terminals and Irregular Layouts Under Uncertainty
[
Vol.17,
Issue
4
- AutumnYear
2021]
Mauluddin.Yusuf
Economic Order Quantity Model for Agricultural Products with Harvest Period
[
Vol.17,
Issue
4
- AutumnYear
2021]
Mekky.Marwa
Risk Assessment of Bridge Construction Project through cost management phases
[
Vol.17,
Issue
1
- WinterYear
2021]
Mirhosseini.S.Mohammad
Providing a System Dynamic Model to Predict Construction Status in Iran Using Sustainable Development Indicators
[
Vol.17,
Issue
3
- SummerYear
2021]
Mohammad Cyrus.Kaveh
A Novel Hybrid Approach to Enhance Intelligence Integration in Small-Medium Enterprises
[
Vol.17,
Issue
2
- SpringYear
2021]
Moreira.Ludmylla
EPQ model with inspection of batches and disposal of defective items
[
Vol.17,
Issue
2
- SpringYear
2021]
Mousavi.Seyyed Farid
A Multi-Period Berth Allocation-Scheduling Model with Different Terminals and Irregular Layouts Under Uncertainty
[
Vol.17,
Issue
4
- AutumnYear
2021]
musavipour.Zahra
Design of Control Charts for Monitoring Logistic Regression Profiles with Estimated Parameters
[
Vol.17,
Issue
3
- SummerYear
2021]