List of Articles Javad Rezaeian Article 1 - Due Date Assignment and JIT Scheduling Problem in Blocking Hybrid Flow Shop Robotic Cells with Multiple Robots and Batch Delivery Cost جواد رضائیان نگار درخشان ایرج مهدوی رضا علیزاده فروتن International Journal of Industrial Mathematics , Issue 2 , Year , Spring 2021 Article 2 - Designing an Optimal Selection Model of Transportation Network in A Multi-level Supply Chain Using Game Theory 20.1001.1.23222301.2023.9.3.5.8 10.30495/jsm.2023.1975423.1734 mahmood darvish sefat Javad Rezaeian Mohammad Mahdi Pourpasha Journal of System Management , Issue 4 , Year , Summer 2023 Article 3 - کاربرد نظریه بازی در بهینهسازی مسئله حملونقل سبز چندسطحی با ذینفعان چندگانه 10.30495/imj.2022.1961617.1780 mahmood darvishsefat Javad Rezaeian Mohammad Mahdi Pourpasha Journal of Industrial Strategic Management , Issue 4 , Year , Winter 2022 Article 4 - مکانیابی و مسیریابی زنجیره تأمین پایدار در فروشگاههای آنلاین 10.30495/imj.2023.1960616.1777 Hossein Firouzi Javad Rezaeian Alireza Rashidi Komijan Mohammad Mehdi Movahedi Journal of Industrial Strategic Management , Issue 1 , Year , Summer 2023 Article 5 - Scheduling of a flexible flow shop with multiprocessor task by a hybrid approach based on genetic and imperialist competitive algorithms 20.1001.1.22519904.2013.6.13.1.0 Javad Rezaeian Hany Seidgar Morteza Kiani Journal of Optimization in Industrial Engineering , Issue 13 , Year , Autumn 2013 Article 6 - Designing an integrated production/distribution and inventory planning model of fixed-life perishable products 20.1001.1.22519904.2016.9.19.5.7 10.22094/joie.2016.229 Javad Rezaeian keyvan Shokoufi Sepide Haghayegh Iraj Mahdavi Journal of Optimization in Industrial Engineering , Issue 19 , Year , Spring 2016 Article 7 - An Efficient Bi-objective Genetic Algorithm for the Single Batch-Processing Machine Scheduling Problem with Sequence Dependent Family Setup Time and Non-identical Job Sizes 20.1001.1.22519904.2018.11.2.7.9 10.22094/joie.2018.792.1505 Javad Rezaeian Yaser Zarook Journal of Optimization in Industrial Engineering , Issue 24 , Year , Autumn 2018 Article 8 - The Preemptive Just-in-time Scheduling Problem in a Flow Shop Scheduling System 20.1001.1.22519904.2019.12.2.7.6 10.22094/joie.2017.499.11 Javad Rezaeian Sadegh Hosseini-Kia Iraj Mahdavi Journal of Optimization in Industrial Engineering , Issue 26 , Year , Autumn 2019 Article 9 - Meta heuristic for Minimizing Makespan in a Flow-line Manufacturing Cell with Sequence Dependent Family Setup Times 20.1001.1.22519904.2014.7.16.2.4 Behzad Nikjo Javad Rezaeian Journal of Optimization in Industrial Engineering , Issue 16 , Year , Winter 2014 Article 10 - Developing a Permutation Method Using Tabu Search Algorithm: A Case Study of Ranking Some Countries of West Asia and North Africa Based on Important Development Criteria 20.1001.1.22519904.2015.8.17.3.4 Javad Rezaeian Keyvan Shokoufi Shahab Poursafary Journal of Optimization in Industrial Engineering , Issue 17 , Year , Spring 2015