A multi-product, multi-period model to select supplier for deteriorating products while considering uncertainty as well as backorder
Subject Areas : Mathematical OptimizationMohsen Lashgari 1 , Seyed Jafar Sadjadi 2 , Misugh Sahihi 3
1 - School of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran
2 - School of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran
3 - School of Industrial Engineering, Iran University of Science and Technology, Tehran, Iran
Keywords:
Abstract :
Bakker M, Riezebos J, Teunter RH (2012) Review of inventory systems with deterioration since 2001. Eur J Oper Res 221(2):275–284
Bevilacqua M, Petroni A (2002) From traditional purchasing to supplier management: a fuzzy logic-based approach to supplier selection. Int J Logist 5(3):235–255
Diabat A, Taleizadeh AA, Lashgari M (2017) A lot sizing model with partial downstream delayed payment, partial upstream advance payment, and partial backordering for deteriorating items. J Manuf Syst 45(1):322–342
Ebrahim RM, Razmi J, Haleh H (2009) Scatter search algorithm for supplier selection and order lot sizing under multiple price discount environment. Adv Eng Softw 40(9):766–776
Hung K-C (2011) An inventory model with generalized type demand, deterioration and backorder rates. Eur J Oper Res
208(3):239–242
Khanlarzade N, Yegane B et al (2014) Inventory control with deteriorating items: a state-of-the-art literature review. Int J Ind Eng Comput 5(2):179–198
Kumar M, Vrat P, Shankar R (2004) A fuzzy goal programming approach for vendor selection problem in a supply chain.
Comput Ind Eng 46(1):69–85
Lashgari M, Taleizadeh AA, Sana SS (2016) An inventory control problem for deteriorating items with back-ordering and financial considerations under two levels of trade credit linked to order quantity. J Ind Manag Optim 12(3):1091–1119
Lee AHI, Kang H-Y, Lai C-M, Hong W-Y (2013) An integrated model for lot sizing with supplier selection and quantity
discounts. Appl Math Model 37(7):4733–4746
Li R, Lan H, Mawhinney JR (2010) A review on deteriorating inventory study. J Serv Sci Manag 3(01):117
Mulvey JM, Vanderbei RJ, Zenios SA (1995) Robust optimization of large-scale systems. Oper Res 43(2):264–281
Rabbani A (2011) Using fuzzy logic to multi-product lot sizing problem with constraint capacity in MRP system. J Ind Manag 5:15–27
Rezaei J, Davoodi M (2011) Multi-objective models for lot-sizing with supplier selection. Int J Prod Econ 130(1):77–86
Saaty TL (2004) Decision making—the analytic hierarchy and network processes (AHP/ANP). J Syst Sci Syst Eng 13(1):1–35
Sarkar T, Ghosh SK, Chaudhuri KS (2012) An optimal inventory replenishment policy for a deteriorating item with time-quadratic demand and time-dependent partial backlogging with shortages in all cycles. Appl Math Comput 218(18):9147–9155
Senyigit E, Soylemez I (2012) The analysis of heuristics for lot sizing with supplier selection problem. Proc Soc Behav Sci 62:672–676
Skouri K, Papachristos S (2002) A continuous review inventory model, with deteriorating items, time-varying demand, linear replenishment cost, partially time-varying backlogging. Appl Math Model 26(5):603–617
Taleizadeh AA (2014) An EOQ model with partial backordering and advance payments for an evaporating item. Int J Prod Econ 155:185–193
Taleizadeh AA, Nematollahi M (2014) An inventory control problem for deteriorating items with back-ordering and financial considerations. Appl Math Model 38(1):93–109
Taleizadeh AA, Niaki STA, Aryanezhad M-B (2009a) A hybrid method of Pareto, TOPSIS and genetic algorithm to optimize
multi-product multi-constraint inventory control systems with random fuzzy replenishments. Math Comput Model
49(5):1044–1057
Taleizadeh AA, Niaki STA, Hoseini V (2009b) Optimizing the multiproduct, multi-constraint, bi-objective newsboy problem with discount by a hybrid method of goal programming and genetic algorithm. Eng Optim 41(5):437–457
Taleizadeh AA, Wee H-M, Sadjadi SJ (2010a) Multi-product production quantity model with repair failure and partial
backordering. Comput Ind Eng 59(1):45–54
Taleizadeh AA, Niaki STA et al (2010b) Optimising multi-product multi-chance-constraint inventory control system with stochastic period lengths and total discount under fuzzy purchasing price and holding costs. Int J Syst Sci 41(10):1187–1200
Taleizadeh AA, Niaki STA, Barzinpour F (2011) Multiple-buyer multiple-vendor multi-product multi-constraint supply chain problem with stochastic demand and variable lead-time: a harmony search algorithm. Appl Math Comput
217(22):9234–9253
Taleizadeh AA, Jalali-Naini SG, Wee H-M, Kuo T-C (2013a) An imperfect multi-product production system with rework. Sci Iran 20(3):811–823
Taleizadeh AA, Wee H-M, Jolai F (2013b) Revisiting a fuzzy rough economic order quantity model for deteriorating items considering quantity discount and prepayment. Math Comput Model 57(5):1466–1479
Taleizadeh AA, Mohammadi B, Ca´rdenas-Barro´n LE, Samimi H (2013c) An EOQ model for perishable product with special sale and shortage. Int J Prod Econ 145(1):318–338
Taleizadeh AA, Noori-daryan M, Ca´rdenas-Barro´n LE (2015) Joint optimization of price, replenishment frequency, replenishment cycle and production rate in vendor managed inventory system
with deteriorating items. Int J Prod Econ 159:285–295
Valliathal M, Uthayakumar R (2009) An EOQ model for perishable items under stock and time-dependent selling rate with shortages. ARPN J Eng Appl Sci 4(8):8–14
Wagner HM (1975) Principles of operations research, 2nd edn. Prentice Hall, New Jersey
Xia W, Wu Z (2007) Supplier selection with multiple criteria in volume discount environments. Omega 35(5):494–504
Yu C-S, Li H-L (2000) A robust optimization model for stochastic logistic problems. Int J Prod Econ 64(1):385–397
Zhang J et al (2015) Optimal dynamic pricing and replenishment cycle for non-instantaneous deterioration items with inventorylevel-dependent demand. Int J Prod Econ 170:136–145