Identification and prioritization of agile project management strategies in the face of the most critical changes in construction projects with the combined method of fuzzy ahp-topsis
Subject Areas :sayedeh mahsa azadeh 1 , Somaieh Alavi 2
1 - Shahid Ashrafi Esfahani non profit university
2 - Assistant Professor of Industrial Engineering Shahid Ashrafi Esfahani UniversityIsfahan, Iran
Keywords: Keywords: project management, agile project management, change, agile strategy,
Abstract :
the current research has been carried out with the aim of introducing and prioritizing agile factors for the change management of construction projects. For this purpose, the most critical changes were identified through the literature in the field of construction. Using the fuzzy AHP-TOPSIS combined technique, the weights of the criteria and the ranking of the agile strategies were determined. Among the main criteria, the customer criterion with a weight of 0.631 has won the first rank. The criterion of the contractor with a weight of 0.168 has won the second place, the criterion of the consultant with a weight of 0.147 has won the third place, and the criterion of external factors with a weight of 0.054 has won the fourth place. Among the agile strategies, continuous improvement through daily meetings has been ranked the first. Project progress monitoring and evaluation consistently ranked second and flexible workflow ranked third.
Ahmed, S., & Arocho, I. (2021). Analysis of cost comparison and effects of change orders during construction: Study of a mass timber and a concrete building project. Journal of building engineering, 33, 101856.
Arefazar, Y., Nazari, A., Hafezi, M. R., & Maghool, S. A. H. (2022). Prioritizing agile project management strategies as a change management tool in construction projects. International Journal of Construction Management, 22(4), 678-689.
Aziz, Z. (2018). Causes of change orders in the Jordanian construction industry. Journal of building construction and planning research, 6(04), 234.
Bajjou, M. S., & Chafi, A. (2020). Empirical study of schedule delay in Moroccan construction projects. International Journal of Construction Management, 20(7), 783-800.
Bektashi, Elahe and Kazeroni, Mohammad Ali (2019), investigation of the causes of rework in construction projects, the 7th national conference of applied researches in civil engineering, architecture and urban management and the 6th specialized exhibition of mass housing and building builders in Tehran province, Tehran. https://civilica.com/doc/1037092
Conforto, E., Rebentisch, E., & Amaral, D. (2014). The building blocks of agility as a team's competence in project management.
Han, F. (2013). Defining and evaluating agile construction management for reducing time delays in construction.
Kazemi, A., Kazemi, M. H., & Katebi, A. (2021). Prioritizing of Factors Affecting Delays in Construction Projects in Iran. Journal of Civil and Environmental Engineering, 51.1(102), 85-98. doi: 10.22034/jcee.2019.9096
Lalmi, A., Fernandes, G., & Souad, S. B. (2021). A conceptual hybrid project management model for construction projects. Procedia Computer Science, 181, 921-930.
Lee, J. S. (2023). Quantifying costs of the productivity loss due to schedule changes in construction projects. Engineering, Construction and Architectural Management, 30(1), 56-73.
Ma, L., & Liu, C. (2018). Decomposition of temporal changes in construction labour productivity. International Journal of Construction Management, 18(1), 65-77.
Marnada, P., Raharjo, T., Hardian, B., & Prasetyo, A. (2022). Agile project management challenge in handling scope and change: A systematic literature review. Procedia Computer Science, 197, 290-300.
Marnewick, A. L., & Marnewick, C. (2019). The ability of project managers to implement industry 4.0-related projects. IEEE Access, 8, 314-324.
Moaveni, S., & Shariatmadar, H. (2021). Ranking the Rework Causes in Iran's Construction Projects and Investigating the Effect of Lean Construction Techniques. Amirkabir Journal of Civil Engineering, 53(1), 127-148. doi: 10.22060/ceej.2019.14975.5801
Nafe Assafi, M., Hoque, M. I., & Hossain, M. M. (2022). Investigating the causes of construction delay on the perspective of organization-sectors involved in the construction industry of Bangladesh. International Journal of Building Pathology and Adaptation.
Owen, R., Koskela, L., Henrich, G., & Codinhoto, R. (2006). Is agile project management applicable to construction?. IGLC.
Oyewobi, L. O., Jimoh, R., Ganiyu, B. O., & Shittu, A. A. (2016). Analysis of causes and impact of variation order on educational building projects. Journal of Facilities Management.
Project Management Institute (PMI). (2017). PMI’s pulse of the profession, 9th global project management survey.
Rachid, Z., Toufik, B., & Mohammed, B. (2019). Causes of schedule delays in construction projects in Algeria. International Journal of Construction Management, 19(5), 371-381.
Sanni-Anibire, M. O., Mohamad Zin, R., & Olatunji, S. O. (2022). Causes of delay in the global construction industry: a meta analytical review. International Journal of Construction Management, 22(8), 1395-1407.
Savolainen, J. M., Saari, A., Männistö, A., & Kähkonen, K. (2018). Indicators of collaborative design management in construction projects. Journal of Engineering, Design and Technology, 16(4), 674-691.
Senouci, A., Alsarraj, A., Gunduz, M., & Eldin, N. (2017). Analysis of change orders in Qatari construction projects. International Journal of Construction Management, 17(4), 280-292.
Sohi, A. J., Hertogh, M., Bosch-Rekveldt, M., & Blom, R. (2016). Does lean & agile project management help coping with project complexity?. Procedia-social and behavioral sciences, 226, 252-259.
Strȧusser, G. (2015). Agile project management concepts applied to construction and other non-IT fields. Project Management Institute.
VersionOne, T. R. (2017). 11th annual state of agile survey. CollabNet VersionOne, (s 3).
Yllén Johansson, M. (2012). Agile project management in the construction industry: An inquiry of the oppurtunities in construction projects.
Zhu, H., Hwang, B. G., Ngo, J., & Tan, J. P. S. (2022). Applications of smart technologies in construction project management. Journal of Construction Engineering and Management, 148(4), 04022010.