• Home
  • About Us
  • Contact Us
  • Register
  • Log in
  • Order
Advanced
  • Home
  • Scheduling
    • List of Articles Scheduling

      • Open Access Article
        • Abstract Page
        • Full-Text

        1 - Modelling and robust scheduling of two-stage assembly flow shop under uncertainty in assembling times
        Maryam seyedhamzeh hossein amoozad khalili Seyed Mohammad Hassan Hosseini mortaza honarmand azimi Kamaladdin Rahmani
        10.30495/jiei.2021.1937425.1150
        20.1001.1.17355702.2021.17.3.2.6
      • Open Access Article
        • Abstract Page
        • Full-Text

        2 - Aircraft routing problem considering various maintenance operation factors: A literature review
        Masoumeh Mirjafari Alireza Rashidi Komijan Ahmad Shoja
        10.30495/jiei.2023.1988013.1308
      • Open Access Article
        • Abstract Page
        • Full-Text

        3 - Improved TLBO and JAYA algorithms to solve new fuzzy flexible job-shop scheduling problems
        Raviteja Buddala Siba Sankar Mahapatra Manas Ranjan Singh Bhanu Chandar Balusa Purusotham Singamsetty Venkata Phanikrishna Balam
        10.30495/jiei.2023.1935150.1142
      • Open Access Article
        • Abstract Page
        • Full-Text

        4 - A multi-product, multi-period and multi-hub routing and scheduling model for offshore logistics
        Alireza Rashidi Komijan Mehdi  Razi Peyman  Afzal Vahidreza Ghezavati Kaveh Khalili Damghani
      • Open Access Article
        • Abstract Page
        • Full-Text

        5 - Robust Scheduling and Planning of Operating Rooms and Sterilization Unit with Emergency and Elective Patients: Two Metaheuristic Algorithms
        Fatemeh Arjmandi Parvaneh Samouei
      • Open Access Article
        • Abstract Page
        • Full-Text

        6 - An electromagnetism-like metaheuristic for open-shop problems with no buffer
        Bahman Naderi Esmaeil Najafi Mehdi Yazdani
      • Open Access Article
        • Abstract Page
        • Full-Text

        7 - A novel hybrid genetic algorithm to solve the make-to-order sequence-dependent flow-shop scheduling problem
        Mohammad Mirabi S. M. T. Fatemi Ghomi F . Jolai
      • Open Access Article
        • Abstract Page
        • Full-Text

        8 - Dynamic configuration and collaborative scheduling in supply chains based on scalable multi-agent architecture
        Fu-Shiung Hsieh
      • Open Access Article
        • Abstract Page
        • Full-Text

        9 - Cat swarm optimization for solving the open shop scheduling problem
        Abdelhamid Bouzidi Mohammed Essaid Riffi Mohammed Barkatou
      • Open Access Article
        • Abstract Page
        • Full-Text

        10 - Optimisation of assembly scheduling in VCIM systems using genetic algorithm
        Son Duy Dao Kazem Abhary Romeo Marian
      • Open Access Article
        • Abstract Page
        • Full-Text

        11 - Maximizing the nurses’ preferences in nurse scheduling problem: mathematical modeling and a meta-heuristic algorithm
        Hamed Jafari Nasser Salmasi
      • Open Access Article
        • Abstract Page
        • Full-Text

        12 - New scheduling rules for a dynamic flexible flow line problem with sequence-dependent setup times
        Hamidreza Kia Seyed Hassan Ghodsypour Hamid Davoudpour
      • Open Access Article
        • Abstract Page
        • Full-Text

        13 - A heuristic approach for multi-stage sequence-dependent group scheduling problems
        N Salmasi
      • Open Access Article
        • Abstract Page
        • Full-Text

        14 - Locomotive assignment problem with train precedence using genetic algorithm
        Siamak Noori Seyed Farid Ghannadpour
      • Open Access Article
        • Abstract Page
        • Full-Text

        15 - Integrated model for pricing, delivery time setting, and scheduling in make-to-order environments
        Hamid Sattari Garmdare M. M . Lotfi Mahboobeh Honarvar
      • Open Access Article
        • Abstract Page
        • Full-Text

        16 - Minimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times
        Samaneh Noori-Darvish Reza Tavakkoli-Moghaddam
      • Open Access Article
        • Abstract Page
        • Full-Text

        17 - A fuzzy mixed-integer goal programming model for a parallel machine scheduling problem with sequence-dependent setup times and release dates
        A.H Gharehgozli
      • Open Access Article
        • Abstract Page
        • Full-Text

        18 - JIT single machine scheduling problem with periodic preventive maintenance
        Mohammadreza Shahriari Naghi Shoja Amir Ebrahimi Zade Sasan Barak Mani Sharifi
      • Open Access Article
        • Abstract Page
        • Full-Text

        19 - An improved genetic algorithm for multidimensional optimization of precedence-constrained production planning and scheduling
        Son Duy Dao Kazem Abhary Romeo Marian
      • Open Access Article
        • Abstract Page
        • Full-Text

        20 - Solving the flexible job shop problem by hybrid metaheuristics-based multiagent model
        Houssem Eddine Nouri Olfa Belkahla Driss Khaled Ghe´dira
      • Open Access Article
        • Abstract Page
        • Full-Text

        21 - A three-stage assembly flow shop scheduling problem with blocking and sequence-dependent set up times
        Aref Maleki-Darounkolaei Mahmoud Modiri Reza Tavakkoli-Moghaddam Iman Seyyedi
      • Open Access Article
        • Abstract Page
        • Full-Text

        22 - Nurse rostering using fuzzy logic: A case study
        A Eskandari K Ziarati
      • Open Access Article
        • Abstract Page
        • Full-Text

        23 - Techniques for cash management in scheduling manufacturing operations
        Mehdy Morady Gohareh Naser Shams Gharneh Reza Ghasemy Yaghin
      • Open Access Article
        • Abstract Page
        • Full-Text

        24 - Scheduling of flexible manufacturing systems using genetic algorithm: A heuristic approach
        Vijay Kumar A. N. Narashima Murthy Krishnappa Chandrashekara
      • Open Access Article
        • Abstract Page
        • Full-Text

        25 - Lot sizing with rework and different inspection costs
        Rasoul Haji Alireza Haji
      • Open Access Article
        • Abstract Page
        • Full-Text

        26 - Splittable stochastic project scheduling with constrained renewable resource
        S.S Hashemin S.M.T Fatemi Ghomi
      • Open Access Article
        • Abstract Page
        • Full-Text

        27 - A genetic algorithm approach for problem
        E Mehdizadeh R Tavakkoli-Moghaddam
      • Open Access Article
        • Abstract Page
        • Full-Text

        28 - Yard crane scheduling in port container terminals using genetic algorithm
        H Javanshir S.R Seyedalizadeh Ganji
      • Open Access Article
        • Abstract Page
        • Full-Text

        29 - An algorithm for multi-objective job shop scheduling problem
        Parviz Fattahi Mohammad Saidi Mehrabad Mir B. Aryanezhad
      • Open Access Article
        • Abstract Page
        • Full-Text

        30 - Flexible job shop scheduling under availability constraints
        M.T Taghavi-Fard H.R Dehnar Saidy
      • Open Access Article
        • Abstract Page
        • Full-Text

        31 - Technical Note: An opportunity cost maintenance scheduling framework for a fleet of ships: A case study
        O.E Charles-Owaba A.E Oluleye F.A Oyawale S.K Oke
      • Open Access Article
        • Abstract Page
        • Full-Text

        32 - Flexible resource management and its effect on project cost and duration
        Desta A. Hailemariam Xiaojun Shan Sung H. Chung Mohammad T. Khasawneh William Lukesh Angela Park Adam Rose Denis C . Pinha Rashpal S. Ahluwalia
        20.1001.1.17355702.2020.16.1.8.1
      • Open Access Article
        • Abstract Page
        • Full-Text

        33 - Role of batch size in scheduling optimization of flexible manufacturing system using genetic algorithm
        Muhammad Umair Akhtar Muhammad Huzaifa Raza Muhammad Shafiq
        20.1001.1.17355702.2020.16.1.9.2
      • Open Access Article
        • Abstract Page
        • Full-Text

        34 - Modeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition
        Sama Ahmadpour Vahidreza Ghezavati
        20.1001.1.17355702.2020.16.3.7.4
      • Open Access Article
        • Abstract Page
        • Full-Text

        35 - An integrated approach for scheduling flexible job-shop using teaching–learning-based optimization method
        Raviteja Buddala Siba Sankar Mahapatra
        20.1001.1.17355702.2020.16.1.12.5
      • Open Access Article
        • Abstract Page
        • Full-Text

        36 - Scheduling of undergraduate thesis examination: a case study in Industrial Engineering Department of Universitas Sebelas Maret
        Cucuk Nur Rosyidi Endah Budiningsih Wakhid Ahmad Jauhari
        20.1001.1.17355702.2020.16.2.2.7
      • Open Access Article
        • Abstract Page
        • Full-Text

        37 - Workers Scheduling in Production Logistics in a Job Shop Production System
        Ameneh Farahani Mohammadhossein  Ladan-Moghadam
  • Home Page
  • Site Map
  • Contact Us
  • Home
  • Site Map
  • Islamic Azad University
  • Contact Us

The rights to this website are owned by the Raimag Press Management System.
Copyright © 2021-2025

Home| Login| About Us| Contact Us|
[فارسی] [العربية] [fa] [ar]
  • IAU
  • Login