• Home
  • About Us
  • Contact Us
  • Register
  • Log in
  • Order
Advanced
  • Home
  • makespan
    • List of Articles makespan

      • Open Access Article
        • Abstract Page
        • Full-Text

        1 - َA Multi-objective simulated annealing algorithm to solving flexible no-wait flowshop scheduling problems with transportation times
        Bahman Naderi Hassan Sadeghi
        20.1001.1.22519904.2012.5.11.4.2
      • Open Access Article
        • Abstract Page
        • Full-Text

        2 - Two-Machine Open Shop Scheduling with Proportionally Deteriorating Jobs and Makespan Objective
        Ching-Fang Liaw
        10.22094/joie.2022.1949101.1926
      • Open Access Article
        • Abstract Page
        • Full-Text

        3 - Meta heuristic for Minimizing Makespan in a Flow-line Manufacturing Cell with Sequence Dependent Family Setup Times
        Behzad Nikjo Javad Rezaeian
        20.1001.1.22519904.2014.7.16.2.4
      • Open Access Article
        • Abstract Page
        • Full-Text

        4 - A Mathematical Model for a Flow Shop Scheduling Problem withFuzzy Processing Times
        Jafar Razmi Reza Tavakoli moghaddam Mohammad Saffari
      • Open Access Article
        • Abstract Page
        • Full-Text

        5 - Exact Mixed Integer Programming for Integrated Scheduling and Process Planning in Flexible Environment
        Mohammad Saidi Mehrabad Saeed Zarghami
        20.1001.1.22519904.2014.7.15.5.5
      • Open Access Article
        • Abstract Page
        • Full-Text

        6 - A Cellular Learning Automata (CLA) Approach to Job Shop Scheduling Problem
  • Home Page
  • Site Map
  • Contact Us
  • Home
  • Site Map
  • Islamic Azad University
  • Contact Us

The rights to this website are owned by the Raimag Press Management System.
Copyright © 2021-2025

Home| Login| About Us| Contact Us|
[فارسی] [العربية] [fa] [ar]
  • IAU
  • Login