H

  • hafezalkootob.ashkan A Three-Echelon Multi-Objective Multi-Period Multi-Product Supply Chain Network Design Problem: A Goal Programming Approach [ Vol.10, Issue 21 - Spring Year 2017]
  • halle.hasan New Heuristic Algorithm for Flow Shop Scheduling with 3 Machines and 2 Robots Considering the Breakdown Interval of Machines and Robots Simultaneously [ Vol.10, Issue 21 - Spring Year 2017]
  • hasanpour.javad Optimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms [ Vol.10, Issue 21 - Spring Year 2017]
  • Heydari.Habib An integrated model of cellular manufacturing and supplier selection considering product quality [ Vol.10, Issue 22 - Autumn Year 2017]
  • hosseini.zahra sadat Optimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms [ Vol.10, Issue 21 - Spring Year 2017]