A

  • Abbasi.Babak A Simulated Annealing Algorithm for Multi Objective Flexible Job Shop Scheduling with Overlapping in Operations [ Vol.3, Issue 5 - Spring Year 2010]
  • Afshar nadjafi.Behrouz A Multi Objective Fibonacci Search Based Algorithm for Resource Allocation in PERT Networks [ Vol.3, Issue 6 - Autumn Year 2010]
  • Akhavan Niaki.S.T. Absorbing Markov Chain Models to Determine Optimum Process Target Levels in Production Systems with Rework and Scrapping [ Vol.3, Issue 6 - Autumn Year 2010]

C

  • chambari.amirhossain A New Model for Location-Allocation Problem within Queuing Framework [ Vol.3, Issue 6 - Autumn Year 2010]

F

  • fallah nezhad.mohammad saber Absorbing Markov Chain Models to Determine Optimum Process Target Levels in Production Systems with Rework and Scrapping [ Vol.3, Issue 6 - Autumn Year 2010]

H

  • Hajipour.Vahid Developing a Method for Increasing Accuracy and Precision in Measurement System Analysis: A Fuzzy Approach [ Vol.3, Issue 6 - Autumn Year 2010]
  • Haleh.Hassan Developing a Method for Increasing Accuracy and Precision in Measurement System Analysis: A Fuzzy Approach [ Vol.3, Issue 6 - Autumn Year 2010]

K

  • kamali dolatabadi.amir hossein Layout of Cellular Manufacturing System in Dynamic Condition [ Vol.3, Issue 5 - Spring Year 2010]
  • kazemi matin.reza Two-stage Production Systems under Variable Returns to Scale Technology: A DEA Approach [ Vol.3, Issue 5 - Spring Year 2010]
  • Khalili.Majid Using Electromagnetism Algorithm for Determining the Number of kanbans in a Multi-stage Supply Chain System [ Vol.3, Issue 6 - Autumn Year 2010]

M

  • Moheb Rabbani.Saeid Influence of fuzzy Goal Programming in Production Optimization Case study: Cement Industry [ Vol.3, Issue 6 - Autumn Year 2010]

N

  • nayebi.mohammad amin A Multi Objective Optimization Approach for Resources Procurement of Bank [ Vol.3, Issue 5 - Spring Year 2010]

P

  • pasandide.mohammadreza A New Model for Location-Allocation Problem within Queuing Framework [ Vol.3, Issue 6 - Autumn Year 2010]
  • pasandide.mohammadreza Layout of Cellular Manufacturing System in Dynamic Condition [ Vol.3, Issue 5 - Spring Year 2010]

S

  • Seifbarghy.Mehdi Maximal Benefit Location Problem for A Congested System [ Vol.3, Issue 5 - Spring Year 2010]

T

  • Tarokh.Jafar Using Electromagnetism Algorithm for Determining the Number of kanbans in a Multi-stage Supply Chain System [ Vol.3, Issue 6 - Autumn Year 2010]

V

  • varmaghani.mohammad Outsourcing or Insourcing of Transportation System Evaluation Using Intelligent Agents Approach [ Vol.3, Issue 5 - Spring Year 2010]