فهرست مقالات Esmaeil Mehdizadeh مقاله 1 - A New Bi-objective Mathematical Model to Optimize Reliability and Cost of Aggregate Production Planning System in a Paper and Wood Company 20.1001.1.22519904.2020.13.1.7.1 10.22094/joie.2018.558585.1539 Mohammad Ramyar Esmaeil Mehdizadeh Seyyed Mohammad Hadji Molana Journal of Optimization in Industrial Engineering , شماره 27 , سال 13 , بهار 2020 مقاله 2 - An Algorithm Based on Theory of Constraints and Branch and Bound for Solving Integrated Product-Mix-Outsourcing Problem 20.1001.1.22519904.2019.12.1.14.1 10.22094/joie.2018.664.1429 Esmaeil Mehdizadeh Saeed Jalili Journal of Optimization in Industrial Engineering , شماره 25 , سال 12 , بهار 2019 مقاله 3 - Solving a Multi-Item Supply Chain Network Problem by Three Meta-heuristic Algorithms 20.1001.1.22519904.2021.14.2.10.3 10.22094/joie.2020.1866273.1648 Amir Fatehi Kivi Esmaeil Mehdizadeh Reza Tavakkoli-Moghaddam Seyed Esmaeil Najafi Journal of Optimization in Industrial Engineering , شماره 31 , سال 14 , پاییز 2021 مقاله 4 - Fuzzy Particle Swarm Optimization Algorithm for a Supplier ClusteringProblem esmaeil Mehdizadeh reza Tavakkoli Moghaddam Journal of Optimization in Industrial Engineering , شماره 1 , سال 1 , پاییز 2008 مقاله 5 - Design of a Mathematical Model for Logistic Network in a Multi-Stage Multi-Product Supply Chain Network and Developing a Metaheuristic Algorithm 20.1001.1.22519904.2012.5.10.5.1 Esmaeil Mehdizadeh Fariborz Afrabandpei Journal of Optimization in Industrial Engineering , شماره 10 , سال 5 , بهار 2012 مقاله 6 - Three Metaheuristic Algorithms for Solving the Multi-item Capacitated Lot-sizing Problem with Product Returns and Remanufacturing 20.1001.1.22519904.2014.7.16.4.6 Esmaeil Mehdizadeh Amir Fatehi Kivi Journal of Optimization in Industrial Engineering , شماره 16 , سال 7 , زمستان 2014 مقاله 7 - Using Hybrid Fuzzy PROMETHEE II and Fuzzy Binary Goal Programming for Risk Ranking: A Case Study of Highway Construction Projects Samareh Moradpour Sadoullah Ebrahimnejad Esmaeil Mehdizadeh Arash Mohamadi Journal of Optimization in Industrial Engineering , شماره 9 , سال 4 , پاییز 2011 مقاله 8 - A Multi-level Capacitated Lot-sizing Problem with Safety Stock Deficit and Production Manners: A Revised Simulated Annealing 20.1001.1.22519904.2013.6.13.6.5 Esameil Mehdizadeh Mohammad Reza Mohammadizadeh Journal of Optimization in Industrial Engineering , شماره 13 , سال 6 , پاییز 2013 مقاله 9 - A New Hybrid Algorithm to Optimize Stochastic-fuzzy Capacitated Multi-Facility Location-allocation Problem Esmaeil Mehdizadeh Mohammad Reza Tavarroth Vahid Hajipour Journal of Optimization in Industrial Engineering , شماره 7 , سال 4 , بهار 2011