An economic production model for deteriorating items and time dependent demand with rework and multiple production setups
محورهای موضوعی : Mathematical OptimizationR. Uthayakumar 1 , S. Tharani 2
1 - Department of Mathematics, The Gandhigram Rural Institute-Deemed University, Gandhigram, Tamilnadu, India
2 - Department of Mathematics, The Gandhigram Rural Institute-Deemed University, Gandhigram, Tamilnadu, India
کلید واژه: Inventory . Rework . Production . Time dependent demand,
چکیده مقاله :
Recently, much emphasis has given to study the control and maintenance of production inventories of the deteriorating items. Rework is one of the main issues in reverse logistic and green supply chain, since it can reduce production cost and the environmental problem. Many researchers have focused on developing rework model, but few of them have developed model for deteriorating items. Due to this fact, we take up productivity and rework with deterioration as the major concern in this paper. In this paper, a production-inventory model with deteriorative items in which one cycle has n production setups and one rework setup (n, 1) policy is considered for deteriorating items with stock-dependent demand in case 1 and exponential demand in case 2. An effective iterative solution procedure is developed to achieve optimal time, so that the total cost of the system is minimized. Numerical and sensitivity analyses are discussed to examine the outcome of the proposed solution procedure presented in this research.