M

  • MAHMODY.hosien Using the Multi Moora Method to Identifiy and Rank Transport Companies based on Performance Evaluation Indicators [ Vol.13, Issue 46 - Winter Year 2019]
  • manteghi.manouchehr Test and Validating the Group Model Building with the Reference Model [ Vol.13, Issue 44 - Summer Year 2018]
  • Mirfakhraddini.Seyed Heydar Evaluating suppliers in supply chain using a combination technique Fuzzy MOLP-AHP (Case of the study: Azaran Industrial Group) [ Vol.13, Issue 45 - Autumn Year 2018]
  • Mirzaie.Hamid anking Contract Types in Construction Projects with Scenario Planning Approach and Max-Min Method (case study: ghaem specialist group) [ Vol.13, Issue 44 - Summer Year 2018]
  • modaresi.snoor Presentation a model for crediblistic multi-period portfolio optimization model whit bankruptcy control [ Vol.13, Issue 44 - Summer Year 2018]
  • Mohammadi.Ali Increasing the level of invincibility and reducing the cost of supply chain based on radio frequency identification technology [ Vol.13, Issue 46 - Winter Year 2019]
  • Mohebban.Bahareh Classify the Iranian’s Construction Projects Key Risks by Structural Equation Modeling [ Vol.13, Issue 46 - Winter Year 2019]
  • Moradi.Alireza Financial crisis and profit smoothing technique [ Vol.13, Issue 45 - Autumn Year 2018]