The evaluation of effective risk management criteria in the of natural gas distribution network projects implementation with fuzzy SWARA and fuzzy best- the worst method approach
Subject Areas :
Ammar Rostami Najafabadi
1
,
Mehrdad Nikbakht
2
,
Atefeh Amindoust
3
,
Mehdi Karbasian
4
1 - Department of Industrial Engineering, Najafabad Branch, Islamic Azad University, Najafabad, Iran.
2 - Modern Manufacturing Technologies Research Center, Department of Industrial Engineering, Najafabad Branch, Islamic Azad University, Najafabad, Iran
3 - Modern Manufacturing Technologies Research Center, Department of Industrial Engineering, Najafabad Branch, Islamic Azad University, Najafabad, Iran
4 - Department of Industrial Engineering, Najafabad Branch, Islamic Azad University, Najafabad, Iran.
Keywords: project, natural gas distribution networks, risk management, fuzzy SWARA technique and fuzzy best- the worst method.,
Abstract :
Gas distribution networks are considered essential. Therefore, considering the importance of the implementation of such projects and the challenges raised in this field, the present study tries to evaluate the key criteria of risk management in the implementation of network projects by comparing two fuzzy multi-indicator decision-making techniques. Pay for the distribution of natural gas. For this purpose, by selecting a number of 36 experts and experts in the field of natural gas industry, using a researcher-made questionnaire, Lawshe method and multi-indicator decision- making techniques based on fuzzy SWARA and fuzzy best- the worst method were used. The obtained results indicate that, out of 32 risk management criteria, 17 criteria were identified as key risk management criteria. Also, based on the results, it is concluded is consistent that the final and definitive weight of the criterion of inadequacy or lack of technical information for design in carrying out the fuzzy best- the worst method multi-indicator decision-making technique with the second rank of the final and definitive weight obtained in the fuzzy SWARA multi-indicator decision-making technique and has been evaluated with the highest importance and the final and definitive weight of the criterion of the inappropriate evaluation process and the selection of suppliers and contractors in two multi-indicator decision- making techniques has been evaluated with the least importance. They share meaning with each other.
Asgari, Mohammad Mehdi; Sadeghi Shahdani, Mehdi and Seifloo, Sajjad. (2015). Identifying and prioritizing the risks of Iran's upstream oil and gas projects using the risk structure format (RBS) and TOPSIS technique. Economic Policy and Research Quarterly, 24(78).
Bahrami, S and Rastegar, M. (2022). Security - based critical power distribution feeder identification: application of fuzzy BWM-VIKOR and SECA. International journal of electrical power and energy systems.
Balali, A; Valipour, A; Edwards, R and Moehler, R. (2021). Ranking effective risks on human resources threats in natural gas supply projects using ANP-COPRAS method: Case study of Shiraz. Reliability engineering and system safety.
Barkhordari Ahmadi, M; Jamali, E.(2017). Identifying Risks of Oil Industry Projects Based on PMBOK’s Standard, and Ranking Them by Using FAHP & Fuzzy TOPSIS Case study: Tehran Jonoob Technical and Construction Company, in the Site of Persian Gulf Star Oil Company. Roshd-e-Fanavari.13(50).
Celik, E and Gul, M. (2021). "Hazard identification, risk assessment and control for dam construction safety using an integrated BWM and MARCOS approach under interval type-2 fuzzy sets environment. Automation in construction.
Dos Santos, Sidney Pereira; Eugenio Leal, Jose and Oliveira, Fabri. (2011). Th development of a natural gas transportation logistics management system. Energy Policy 39.
Flanagan, R., Norman, G. (2000). Risk Management and Construction. Blackwell Publishing Ltd, Oxford.
Guo, S., Zhao, H., 2017. Fuzzy best-worst multi-criteria decision-making method and its applications. Knowledge-based systems.
Kraidi, L; Shah, R; Matipa, W and Borthwick, F. (2021). An investigation of mitigating the safety and security risks allied with oil and gas pipeline projects. Journal of pipeline science and engineering.
Lawshe, C.H. (1975). A quantitative approach to content validity. Phrsonnhl psychoi.ogy.
Masoomi, B; Ghasemian Sahebi, I; Fathi, M; Yildirim, F and Ghorbani, S. (2022). Strategic supplier selection for renewable energy supply chain under green capabilities (fuzzy BWM-WASPAS-COPRAS approach). Energy strategy reviews.
Masoumbeigi H, Sadat Rasoul M, Qanizadeh G. Risk Identification and Assessment in Hashtgerd Drinking Water Facilities by FMEA Method. J Mar Med 2022; 3 (4):218-228
Matbou, F and Maleki, A. (2022). Prioritizing strategic innovative energy technologies for development by a novel fuzzy approach based on distances from ideals (case study: Upstream technologies of Iran’s oil industry fields). Energy Rep.
Mirmohammadsadeghi, S., & Nabavianpour, M. (2019). Investigating the Risk of Garmsar Water Distribution Network through Binary and TOPSIS Methods Using GIS. Journal of Water and Sustainable Development, 6(1), 15-22. doi: 10.22067/jwsd.v6i1.73620.
Mohtashami, A. (2021). "A novel modified fuzzy best-worst multi-criteria decision-making method". Expert systems with applications.
Moradi, Afshar; Najafi Kani, Ibrahim and Parvini, Mehdi. (2016). Risk assessment of urban gas distribution network using hierarchical analysis in Sanandaj city. Bimonthly journal of work health of Iran, 14(4).
Mouli-Castillo, J; Haszeldine, S. R; Kinsella, K; Wheeldon, M and McIntosh, A. (2021). A quantitative risk assessment of a domestic property connected to a hydrogen distribution network. International journal of hydrogen energy.
Nasrollahi, M., & Asgharizadeh, E. (2019). Identification and Prioritization of Criteria affecting the Productivity of Production Factors in Broiler Industry Using Fuzzy Best-Worst Method: A Case Study of West Azerbaijan Province of Iran. Agricultural Economics and Development, 27(2), 237-261. doi: 10.30490/aead.2019.95476
Nasrollahi, M; Ramezani, J and Sadraei, M. (2020). "A FBWM-PROMETHEE approach for industrial robot selection". Heliyon.
Rezaei, J. (2015). Best-worst multi-criteria decision-making method. Omega.
Rezaei, J. (2016). Best-worst multi-criteria decision-making method: Some properties and a linear model. Omega.
Tehrani, R., Ebrahimi, S. N., & Misaghi Farouji, J. (2020). RISK MANAGEMENT OF IRAN UPSTREAM OIL AND GAS INVESTMENT CONTRACTS, GROUNDED THEORY METHOD (GTM) & TEFCEL APPROACH. Journal Of Researches Energy Law Studies, 6(2), 265-284. doi: 10.22059/jrels.2021.282338.285
Zhang, Y and Fan, Z.P. (2014). An optimization method for selecting project risk response strategies. Int. J. Proj. Manage. 32 (3), 412–422.