On Bottleneck Product Rate Variation Problem with Batching
Subject Areas : Operation ResearchShree Khadka 1 , Tanka Dhamala 2
1 - Central Department of Mathematics, Tribhuvan University, Kathmandu, Nepal
2 - Central Department of Mathematics, Tribhuvan University, Kathmandu, Nepal
Keywords:
Abstract :
[1] Brauner N., and Crama Y., The maximum deviation just-in-time scheduling problem, Discrete Applied Mathematics, 134, 25-50, 2004.
[2] Brauner N., Jost V., and Kubiak W., On symmetric Fraenkel’s and small deviations conjecture, Les Cahiers du Laboratoire Leibniz-IMAG, 54, Grenoble, France, 2004.
[3] Dhamala T. N., and Khadka S. R., A review on sequencing approaches for mixed-model just-in-time production system, Iranian Journal of Optimization, 1, 3, 266-290, 2009.
[4] Dhamala T. N., Khadka S. R., and Lee M. H., A note on bottleneck product rate variation problem with square-deviation objective, International Journal of Operations Research, 7(1), 1-10, 2010.
[5] Khadka S. R., and Dhamala T. N., Optimality of the bottleneck product rate variation problem with a general objective, Submitted, 2010.
[6] Kubiak W., Minimizing variation of production rates in just-in-time systems: A survey, European Journal of Operational Research, 66, 259-271, 1993.
[7] Kubiak W., On small deviation conjecture, Bulletin of the Polish Academy of Sciences, 51, 189-203, 2003.
[8] Kubiak W., Proportional optimization and fairness, International Series in Operations Research and management Science, Springer, 2009.
[9] Kubiak W., and Sethi S., A note on level schedules for mixed-model assembly lines in just-in-time production systems, Management Science, 37, 1, 121-122, 1991.
[10] Kubiak W., and Sethi S., Optimal just-in-time schedules for flexible transfer lines, The International Journal of Flexible Manufacturing Systems, 6, 137-154, 1994.
[11] Kubiak W., and Yavuz M., Just-in-time smoothing through batching, Manufacturing and Service Operations Management, 10(3), 506-518, 2008.
[12] Miltenburg J., Level schedules for mixed-model assembly lines in just-in-time production systems, Management Science, 35(2), 192-207, 1989.
[13] Miltenburg J., and Sinnamon G., Scheduling mixed-model multi-level just-in-time production systems, International Journal of Production Research, 27(9), 1487-1509, 1989.
[14] Moreno N., and Corominas A., Solving the minmax product rate variation problem (PRVP) as a bottleneck assignment problem, Computers and Operations Research, 33, 928-939, 2006.
[15] Steiner G., and Yeomans J. S., Level schedules for mixed-model, just-in-time processes, Management Science, 39(6), 728-735, 1993.
[16] Yavuz M., Akcali E., and Tufekci S., Optimizing production smoothing decisions via batch selection for mixed-model just-in-time manufacturing systems with arbitrary setup and processing times, International Journal of Production Research, 44(15), 3061-3081, 2006.
[17] Yavuz M., and Tufekci S., An analysis and solution to the single-level batch production smoothing problem, International Journal of Production Research, 45(17), 3893-3916, 2007.