• فهرس المقالات Critical path

      • حرية الوصول المقاله

        1 - Workflow Scheduling on Hybrid Fog-Cloud Environment Based on a Novel Critical Path Extraction Algorithm
        Fatemeh Davami Sahar Adabi Ali Rezaee Amir Masoud Rahamni
        In the last ten years, the Cloud data centers have been manifested as the crucial computing architectures to enable extreme data workflows. Due to the complicatedness and diverse kinds of computational resources like Fog nodes and Cloud servers, workflow scheduling has أکثر
        In the last ten years, the Cloud data centers have been manifested as the crucial computing architectures to enable extreme data workflows. Due to the complicatedness and diverse kinds of computational resources like Fog nodes and Cloud servers, workflow scheduling has been proposed to be the main challenge in Cloud and or Fog computing environments. For resolving this issue, the present study offers a scheduling algorithm according to the critical path extraction, referred to as the Critical Path Extraction Algorithm (CPEA). In fact, it is one of the new multi-criteria decision-making algorithms to extract the critical paths of multiple workflows because it is of high importance to find the critical path in the creation and control of the scheduling. Moreover, an extensive software simulation investigation has been performed to compare this new algorithm in the real work-loads and recent algorithm. We compare our algorithm with the GRP-HEFT algorithm. The experimental results confirm the proposed algorithm's superiority in fulfilling make-span and waiting time and that workflow scheduling based on CPEA further improves the workflow make-span and waiting time. تفاصيل المقالة
      • حرية الوصول المقاله

        2 - مدیریت ریسک پروژه های خطوط انتقال آب )مطالعه موردی شرکت آب منطقه ای استان کردستان(
        Azad Enayati Heirsh Soltanpanah Alireza Qari Quran
        تأخیر در واقع اختلاف بین زمان پیش بینی شده برای تکمیل پروژه و زمان واقعی تکمیل آن است. هدف از این تحقیق شناسایی عوامل مؤثر بر تأخیر در پروژه های خطوط انتقال آب و ارائه راهکار جهت مدیریت آن می باشد. برای این منظور در یک مطالعه موردی عوامل تأخیر پروژه های خطوط انتقال آب ا أکثر
        تأخیر در واقع اختلاف بین زمان پیش بینی شده برای تکمیل پروژه و زمان واقعی تکمیل آن است. هدف از این تحقیق شناسایی عوامل مؤثر بر تأخیر در پروژه های خطوط انتقال آب و ارائه راهکار جهت مدیریت آن می باشد. برای این منظور در یک مطالعه موردی عوامل تأخیر پروژه های خطوط انتقال آب استان کردستان شناسایی و اولویت بندی شده و مهمترین آنها استخراج گردید. در این راستا با بررسی دیدگاه افرادی دخیل در پروژه علاوه بر دسته بندی و اولویت بندی عوامل، تحلیل روابط بین عوامل اصلی بوجود آورنده تأخیر و ارئه راهکارهایی جهت مدیریت و کاهش تأخیر انجام گردید. عوامل تأخیرات بر اساس متدولوژی شش مرحله ای شامل برنامه ریزی مدیریت ریسک، شناسایی ریسک، ارزیابی کیفی ریسک، تحلیل کمی ریسک، کنترل و نظارت ریسک، برنامه ریزی واکنش به ریسک و فرآیند تحلیلی سلسله مراتبی در پنج نهاده کارفرما، مشاور، پیمانکار، عوامل مستقل لوله گذاری و سایر عوامل خارجی اولویت بندی گردید. با توجه به نتایج حاصل از تجزیه و تحلیل داده ها، میزان تأثیر هر یک از ریسک های شناسایی شده بر اهداف پروژه (زمان، هزینه، کیفیت) محاسبه گردید. نتایج تحقیق نشان داد مهمترین ریسک های کلیدی تأثیر گذار بر اهداف اصلی پروژه شامل: ریسک های زمانی از جمله برنامه ریزی ضعیف پیمانکار جهت اجرای پروژه و ریسک های مالی از جمله افزایش تورم و ریسک های کیفیت ازجمله ریزش کانال حفاری شده و ریزش برداری مجدد آن می باشد. سپس با برگزاری جلساتی با حضور صاحب نظران و بررسی مطالعات انجام شده راهکارهای مدیریتی جهت پیشبرد اهداف و کاهش ریسک های منفی که بر تأخیر در پروژه های خطوط انتقال آب تأثیر دارند ارائه گردید. تفاصيل المقالة
      • حرية الوصول المقاله

        3 - A New Analysis of Critical Paths in Mega Projects with Interval Type-2 Fuzzy Activities by Considering Time, Cost, Risk, Quality, and Safety Factors
        Yahya Dorfeshan Seyed Meysam Mousavi Behnam Vahdani
        Critical path method (CPM) is categorized as a popular tool for scheduling mega projects. In this paper, to enjoy the advantages of interval type-2 fuzzy sets (IT2FSs) and better address uncertainty for the activities’ attributes, a new analysis model is presented أکثر
        Critical path method (CPM) is categorized as a popular tool for scheduling mega projects. In this paper, to enjoy the advantages of interval type-2 fuzzy sets (IT2FSs) and better address uncertainty for the activities’ attributes, a new analysis model is presented to determine the critical path under an IT2F-environment. Also, new efficient factors on specifying critical paths, such as time, cost, risk, safety, and quality (TCRSQ), are presented to achieve a more robust plan assisting in megaproject success. Moreover, an IT2F weighting approach is suggested for specifying the weights of TCRSQ factors. Furthermore, a new IT2F-approach employing the relative preference relation is expressed for identifying the importance of each expert. Consequently, a new model for critical path determination procedure by considering efficient factors is developed under the IT2FSs environment. Finally, to demonstrate the suggested model's capability and the calculation process, an application from the previous research is solved. تفاصيل المقالة
      • حرية الوصول المقاله

        4 - A Full Adder Cell Based on MOSFET Technology to apply in Arithmetic circuits
        Mokhtar Mohammadi Ghanatghestani Fatemeh Mohammadi Ghanatghestani
        In this paper, a full adder cell based on a parallel design using MOSFET ‎technology is presented. The main goal of designing this full adder cell is to reduce ‎critical path delay in adder circuits. The proposed design by reduces length of data ‎path and po أکثر
        In this paper, a full adder cell based on a parallel design using MOSFET ‎technology is presented. The main goal of designing this full adder cell is to reduce ‎critical path delay in adder circuits. The proposed design by reduces length of data ‎path and positively, affects speed and power consumption parameters. In order to ‎evaluate the proposed full adder cell, several simulations are performed in ‎different load capacitors, frequencies and temperatures using HSPICE in 32nm ‎CMOS technologies. The proposed full adder cells were compared with eight other ‎full adder cells using 4-bit Ripple Carry Adder (RCA) and 8-bit RCA circuits in ‎power consumption, speed, and Power Delay Product (PDP) parameters. The ‎obtained results indicate that the proposed design is faster than other designs due ‎to a shortened data path. The results of the simulations confirm the higher efficiency ‎of the proposed full adder cell with respect to other designs. ‎ تفاصيل المقالة
      • حرية الوصول المقاله

        5 - A new heuristic method based on CPM in SALBP
        M Fathi A Jahan M.K Ariffin N Ismail
        The task of balancing of assembly lines is well-known in mass production system but this problem is NP-hard even for the simple straight line. Therefore, utilizing heuristic methods for these problems is totally unquestionable. Furthermore, in line with balancing proble أکثر
        The task of balancing of assembly lines is well-known in mass production system but this problem is NP-hard even for the simple straight line. Therefore, utilizing heuristic methods for these problems is totally unquestionable. Furthermore, in line with balancing problems, heuristic methods are the foundation of the metaheuristic methods, thus it seems to be necessary to use more efficient heuristic methods. This paper presents a new heuristic method based on the famous critical path method (CPM) for the simple assembly line balancing problem (SALBP) that the only precedence constraints between tasks and cycle time have been considered. In this research regarding the objectives of minimizing the number of workstation, maximizing smoothness index and maximizing line performance, the efficiency of the suggested method and 11 popular methods are compared at SALBP-1. For comparative evaluation, 11 networks are collected from open literature, and are used with different cycle times. On the whole, 40 problems have been solved and it is found that the heuristic method based on critical path is more efficient than the others. تفاصيل المقالة
      • حرية الوصول المقاله

        6 - مدیریت پرتفوی هزینه پروژه ها در مساله موازنه زمان-هزینه-کیفیت و تعیین اقتصادی ترین ترکیب کاهش زمان فعالیت ها در شبکه های مبتنی بر مسیر بحرانی (CPM)
        احسانه نظری نصرت الله شادنوش طهمورث سهرابی
        امروزه یکی از مهم ترین مواردی که در شرکت های پروژه محور، جهت مدیریت بهتر سبد پروژه‌ها و برنامه‌ریزی مالی مورد نیاز است،مدیریت هزینه پروژه‌هااست. در مدیریت هزینه پروژه با استفاده از مجموعه تکنیک ها و اصول کنترل پروژه و مالی می‌توان عملکرد مالی هر پروژه را از جنبه نحوه ع أکثر
        امروزه یکی از مهم ترین مواردی که در شرکت های پروژه محور، جهت مدیریت بهتر سبد پروژه‌ها و برنامه‌ریزی مالی مورد نیاز است،مدیریت هزینه پروژه‌هااست. در مدیریت هزینه پروژه با استفاده از مجموعه تکنیک ها و اصول کنترل پروژه و مالی می‌توان عملکرد مالی هر پروژه را از جنبه نحوه عملکرد ( هزینه کرد) واقعی در مقایسه با هزینه پیش‌بینی ‌شده برای کار انجام شده را بررسی نموده و راهکارهای اصلاحی در راستای کاهش هزینه‌ها و تحت کنترل قراردادن آن‌ را ارائه نمود.از آنجا که کاهش مدت زمان اجرای فعالیت ها با تخصیص منابع بیشتر به هر فعالیت، امکان پذیر بوده اما نیازمند صرف هزینه های بالاتر برای اجرای آن فعالیت هاست، باید توجه نمود که تعجیل در انجام فعال یت ها، می تواند منجر به کاهش سطح کیفی آن ها گردد، بنابراین، می بایست در فرآیند فشرده سازی زمان فعالیت ها، در کنار شاخص هزینه، شاخص کیفیت فعالیت ها را نیز لحاظ نمود. در این مقاله، یک مدل ریاضی جهت مدیریت هزینه های پروژه مبتنی بر روش مسیر بحرانی ارائه شده که با لحاظ نمودن یک رقم مشخص تحت عنوان سقف بودجه پروژه، دو هدف حداقل سازی مجموع هزینه های پروژه (مدل کلاسیک) و هدف حداکثرسازی کیفیت فعالیت ها، به طور هم زمان، تامین می نماید. تفاصيل المقالة