Abbasi.Babak
Using neural network to estimate weibull parameters
[
Vol.1,
Issue
1
- AutumnYear
2008]
Afshar nadjafi.behrouz
Using neural network to estimate weibull parameters
[
Vol.1,
Issue
1
- AutumnYear
2008]
Afshar nadjafi.Behrouz
The preemptive resource-constrained project scheduling problem subject
to due dates and preemption penalties: An integer programming approach
[
Vol.1,
Issue
1
- AutumnYear
2008]
Akhavan Niaki.S.T.
A Review and Evaluation of Statistical Process Control Methods in
Monitoring Process Mean and Variance Simultaneously
[
Vol.1,
Issue
1
- AutumnYear
2008]
Amiri.Maghsoud
Estimation of the cost function of a two-echelon inventory system with
lost sales using regression
[
Vol.1,
Issue
1
- AutumnYear
2008]
F
Fazel Zarandi.Mohammad Hossein
Application of Rough Set Theory in Data Mining for Decision Support
Systems (DSSs)
[
Vol.1,
Issue
1
- AutumnYear
2008]
H
Heidari.mostafa
Estimation of the cost function of a two-echelon inventory system with
lost sales using regression
[
Vol.1,
Issue
1
- AutumnYear
2008]
M
Mehdizadeh.Esmaeil
Fuzzy Particle Swarm Optimization Algorithm for a Supplier Clustering
Problem
[
Vol.1,
Issue
1
- AutumnYear
2008]
O
Ostadsharifmemar.Ahmad
A Review and Evaluation of Statistical Process Control Methods in
Monitoring Process Mean and Variance Simultaneously
[
Vol.1,
Issue
1
- AutumnYear
2008]
R
rashidi.Hasan
Scheduling in Container Terminals using Network
Simplex Algorithm
[
Vol.1,
Issue
1
- AutumnYear
2008]
S
Seifbarghy.Mehdi
Estimation of the cost function of a two-echelon inventory system with
lost sales using regression
[
Vol.1,
Issue
1
- AutumnYear
2008]
Shadrokh.Shahram
The preemptive resource-constrained project scheduling problem subject
to due dates and preemption penalties: An integer programming approach
[
Vol.1,
Issue
1
- AutumnYear
2008]
T
Tavakkoli-Moghaddam.Reza
Fuzzy Particle Swarm Optimization Algorithm for a Supplier Clustering
Problem
[
Vol.1,
Issue
1
- AutumnYear
2008]