Proposing a suitable scheduling to use electrical vehicle in micro-grid to decrease cost by using HBB-BC algorithm
Subject Areas : Electrical Engineering
1 - Iranian
Keywords: Electrical vehicle (EVs), Charge/discharge management, reduce cost, Hybrid Big Bang- Big Crunch algorithm,
Abstract :
Provide a comprehensive plan for the electric vehicles in a micro-grid with regard to network limitations and vehicles as well as economic goals of the utmost importance. In this paper, the Hybrid Big Bang to Big Crunch algorithm has been used to provide scheduling for electric vehicle presence in the network to reduce costs. In order to verify the proposed method, studies in a 24 hour period on a distribution system and in the presence of electric vehicles have been done with real movement patterns. Effectiveness and usefulness of the proposed technique scheduling resources in a 24 hour period on a micro-grid sample tested. The results show that the proposed method of charging / discharging EV can reduce operating costs.
|
[1] Hay ,C. Togeby, M. Bang, N, C. Sondergren ,C. Hansen, L,H. “Introducing Electric Vehicles into the Current Electricity Markets” ,Edison consortium, 2010.
[2] Tomic, J.; Kempton ,W. “Using fleets of electric-drive vehicles for grid support”. Journal of Power Sources ;Vol168, p.p.459–68, 2007.
[3] Katrašnik ,T.“Energy conversion phenomena in plug-in hybrid-electric vehicles”. Energy Convers Manage, vol :52 p.p.2637-2650 ,2011.
[4] Mark Leo, KripalKavi, Hanns Anders, Brian Moss, “Ancillary Service Revenue Opportunities from Electric Vehicles via Demand Response”, April 2011.
[5] Moura , F.; Schrattenholzer, L. “Driving energy system transformation with vehicle-to-grid power”, International Institute for Applied Systems Analysis, Tech. Rep, 2006
[6] C.Hutson, et al., "Intelligent scheduling of hybrid and electric vehicle storage capacity in a parking lot for profit maximization in power transactions, ", Vol.64, pp 1-8, 2008
[7] Abolfazli, M.; Bahmani, M.H. ;Afsharnia, S. ; Ghazizadeh, M.S.., “A probabilistic method to model PHEV for participation in electricity market”, Electrical Engineering (ICEE) conference, pp. 1-5, 2011.
[8] Moghaddam.A ,Seifi .A, Niknam .T, “Multi-objective operation management of a renewable MG (micro-grid) with back-up micro-turbine/fuel cell/battery hybrid power source”Contents lists available at SciVerseScienceDirect. Energy vol .36 p..p. 6490-6507, 2011.
[9] Erol, O. and Eksin, I., 'New optimization method: Big Bang-Big Crunch', Elsevier, Advances in Engineering Software, vol. 37, pp. 106–111, 2006.
[10] Camp, C.V., 'Design of space trusses using Big Bang – Big Crunch optimization', Journal of Structural Engineering, vol.133, no. 7, pp. 999-1008, 2007.
[11] Kaveh, A. and Talatahari, S., 'Size optimization of space trusses using Big Bang – Big Crunch algorithm', Computers and Structures, vol.87, pp. 1129-1140, 2009.
[12] Sedighizadeh, M., Ahmadi, S., Sarvi, M., 'An Efficient Hybrid Big Bang-Big Crunch Algorithm for Multi-objective Distribution System Reconfiguration in Fuzzy Framework' Electric power components and system. Vol. 41, pp. 75-99, 2013.
[13] Zakariazadeh,A ; Jadid, Sh ; Siano ,P. “ Multi-objective scheduling of electric vehicles in smart distributionsystem”Energy Conversion and Management vol 79 ,p.p.43–53, 2013.