فهرس المقالات mohammad alaghebandha


  • المقاله

    1 - A Continuous Review inventory Control Model within Batch Arrival Queuing Framework: A Parameter-Tuned Imperialist Competitive Algorithm
    Journal of Optimization in Industrial Engineering , العدد 1 , السنة 5 , پاییز 2012
    In this paper, a multi-product continues review inventory control problem within batch arrival queuing approach (MQr/M/1) is modeled to find the optimal quantities of maximum inventory. The objective function is to minimize summation of ordering, holding and shortage co أکثر
    In this paper, a multi-product continues review inventory control problem within batch arrival queuing approach (MQr/M/1) is modeled to find the optimal quantities of maximum inventory. The objective function is to minimize summation of ordering, holding and shortage costs under warehouse space, service level, and expected lost-sales shortage cost constraints from retailer and warehouse viewpoints. Since the proposed model is Np-Hard, an efficient imperialist competitive algorithm (ICA) is proposed to solve the model. To justify proposed ICA, a simulated annealing algorithm has been utilized. In order to determine the best value of algorithms parameters that result in a better solution, a fine-tuning procedure is executed. Finally, the performance of the proposed ICA is analyzed using some numerical illustrations. تفاصيل المقالة

  • المقاله

    2 - Economic Lot Sizing and Scheduling in Distributed Permutation Flow Shops
    Journal of Optimization in Industrial Engineering , العدد 1 , السنة 12 , زمستان 2019
    This paper addresses a new mixed integer nonlinear and linear mathematical programming economic lot sizing and scheduling problem in distributed permutation flow shop problem with number of identical factories and machines. Different products must be distributed between أکثر
    This paper addresses a new mixed integer nonlinear and linear mathematical programming economic lot sizing and scheduling problem in distributed permutation flow shop problem with number of identical factories and machines. Different products must be distributed between the factories and then assignment of products to factories and sequencing of the products assigned to each factory has to be derived. The objective is to minimize the sum of setup costs, work-in-process inventory costs and finished products inventory costs per unit of time. Since the proposed model is NP-hard, an efficient Water Cycle Algorithm is proposed to solve the model. To justify proposed WCA, Monarch Butterfly Optimization (MBO), Genetic Algorithm (GA) and combination of GA and simplex are utilized. In order to determine the best value of algorithms parameters that result in a better solution, a fine-tuning procedure according to Response Surface Methodology is executed. تفاصيل المقالة