Feasibility Study of 23 kW Photovoltaic Power Plant Connected to the Grid in Haftkol City
الموضوعات :
1 - Department of Electrical Engineering, Izeh Branch, Islamic Azad University, Izeh, Iran
الکلمات المفتاحية: Solar Energy, Photovoltaic system, Pv syst,
ملخص المقالة :
Renewable energies, in addition to being inexhaustible, are among the clean energies and do not pollute the environment. Among renewable energies, solar energy is of special importance due to its extent and scope of application. In this article, the feasibility of building a photovoltaic power plant connected to the grid has been studied at the desired location, which selects the appropriate capacity and angle for the optimal use of solar power by the plant and reduces costs. Networking is very useful. In this paper, the feasibility study of a photovoltaic power plant with a capacity of 23.76 kW in Haftkol city, considering equipment, modules, power, voltage, inverter, optimal use of area and high reliability, has been designed using software. Land with an area of 144 square meters with an efficiency of 84.65% and 88 photovoltaic panels is considered and also the annual injection capacity to the network is 42350 MW.
[1] M. Bouzguenda, A. Al Omair, A. Al Naeem, M. Al-Muthaffar and O. BaWazir. Design of an off-grid 2 kW solar PV system. In Proceedings of Ninth International Conference on Ecological Vehicles and Renewable Energies(EVER), Monte-Carlo; p. 1-6.
[2] P. Karki, B. Adhikary and K. Sherpa. Comparative study of grid-tied photovoltaic (PV) system in Kathmandu and Berlin using PVsyst. Proceedings of IEEE Third International Conference on Sustainable Energy Technologies (ICSET), Kathmandu; p. 106-100.
[3] Central Electricity Regulatory Commission. (2011). Performance of solar power plants in India. [Online]. Available: http://www.cercind.gov.in/
[4] Govt. of India. (2009). Jawaharlal Nehru National Solar Mission: Towards building solar India. [Online]. Available: http://www.mnre.gov.in/file- manager/UserFiles/mission_document_JNNSM.pdf
[5] Ministry of New and Renewable Energy. (2014). [Online]. Available: http://www.mnre.gov.in/mission-and-vision- 2/achievements/
[6] Renewable power generation in India: Establishing feasible targets. Presentation at IIASA Seminar, 2008. [Online].Available: www.me.iitb.ac.in/~rangan/professional_activity/Renpowe .pdf
[7] International Energy Agency. (2013). PVPS Report: A snapshot of global PV 1992-2012. [Online]. Available: http://www.iea- pvps.org.