A

  • Adressi.A Solving Group Scheduling Problem in No-wait Flow Shop with Sequence Dependent Setup Times [ Vol.3, Issue 1 - Winter Year 2014]
  • Adressi.A Solving the Problem of Scheduling Unrelated Parallel Machines with Limited Access to Jobs [ Vol.3, Issue 2 - Spring Year 2014]
  • Ahmadi.Farshid Comparison of Hardness Values of Various specimens with different geometries and material properties after ECAP [ Vol.3, Issue 3 - Summer Year 2014]
  • Amini.Amir A Two-phase Model for Product Design Development and Evaluation and Supplier Selection in Product Configuration Change Process (Case study: SUPCO) [ Vol.3, Issue 3 - Summer Year 2014]