Rabani.Masoud
A Facility Location Problem in a Green Closed-Loop Supply Chain Network Design by Considering Defective Products
[
Vol.18,
Issue
1
- WinterYear
2022]
Raghav.Dhruv
Performance assessment of a complex repairable system with k-out-of-n: G operational scheme and copula repair approach
[
Vol.18,
Issue
3
- SummerYear
2022]
Rahkhoday Badrani.Mitra
Identifying the challenges of implementing the integrated project delivery method (IPD) in large residential projects in Iran
[
Vol.18,
Issue
3
- SummerYear
2022]
Raissi.Sadigh
Assessing the reliability of dynamic systems for safety units recovering flare gas, considering covariates
[
Vol.18,
Issue
4
- AutumnYear
2022]
Raissi.Sadigh
The effects of designing quality management technical standards on product maturity and excellence
[
Vol.18,
Issue
1
- WinterYear
2022]
Roghanian.Emad
Location of facilities in the design of the global logistics hub network taking into account the time discount coefficient
[
Vol.18,
Issue
4
- AutumnYear
2022]