• فهرست مقالات پاییندست رودخانه

      • دسترسی آزاد مقاله

        1 - Study of Duckbill Weir with Triangular and Curved Plan Form
        الهه حسینیان سید محمود کاشفی پور داریوش کرمی چمه علی حسینیان
        Constructing ofcontrolstructures, like dams, change temporal and spatial unequal distribution of water,and also play an effective role in reduce or eliminate of damage that caused byfloods. So reservoir dam’s effect on floodsdischarges reduction must be determined چکیده کامل
        Constructing ofcontrolstructures, like dams, change temporal and spatial unequal distribution of water,and also play an effective role in reduce or eliminate of damage that caused byfloods. So reservoir dam’s effect on floodsdischarges reduction must be determined. Inthisstudy the rain Information and flood hydrographs were used to check the flood routing for previous period of Maroon dam constructing, with using ANNs. The effect of Maroon dam Constructing, on peak of flood reduction were specified. ANNs has Indicated that it canpredict flood hydrographs at testing phase as well. Comparison of the predicted and observed hydrographs in Behbehan hydrometric station showed that, for the most severe floods during the considered period, the dam was able to control the flood and to reserve about 121.74 MCM. Also the peak flow was decreased from 1975 m3/s to 500 m3/s. پرونده مقاله