Designing a People Capability Maturity Model Among Faculty Members (Case study: Islamic Azad University of Fars Province
محورهای موضوعی : Business Strategymaryam mahdavi 1 , nader sheikh al-Islami 2 , narges hasanmoradi 3 , Narjes Shokri 4
1 - Department of Educational Administration, North Tehran Branch, Islamic Azad University,Tehran, Iran
2 - Department of management, North Tehran Branch, Islamic Azad University, Tehran, Iran
3 - Department of management, North Tehran Branch, Islamic Azad University, Tehran, Iran
4 - Department of Public Managment, Cantral Tehran Branch, Islamic Azad University, Tehran, Iran
کلید واژه: indigenous model, People Capability Maturity Model (PCMM), management of faculty members, Islamic Azad University,
چکیده مقاله :
People capability maturity model (PCMM) is a framework to help develop the level of maturity and improve the field of human resources of organizations. The present study is conducted with the aim of designing and validating an indigenous PCMM for managers among faculty members of the Islamic Azad University of Fars Province. First, the initial indicators are extracted through literature review, then the interview questions are designed and approved by 3 experts. After that, semi-structured interviews are conducted with 17 faculty members who, in addition to having executive records over 5 years, also are assistant professors and above. The sampling method is purposeful snowball. Data analysis is done based on Strauss and Corbin grounded theory model in 6 paradigms of causal conditions, main phenomenon, intervening conditions, context, strategies and consequences. The results of data analysis obtained during 3 open, axial and selective coding processes lead to the extraction of 29 indicators and 98 components. Then, using the obtained variables, a questionnaire is designed and distributed among faculty members, and data are collected and indicators are ranked using confirmatory factor analysis, based on which an indigenous model is presented. Validity and fitting of the model is measured through structural equations using PLS software. The results of validation show that the model has a high validity. According to the discussions and conclusions, one of the research suggestions in increasing the maturity and capability of faculty members can be holding perpetual training courses for managers, which should be implemented by teachers who have a brilliant record in human resource management.
Abbospour, A. (2019). Advanced human Resources Management, Samt pub.
Amirkhani, A.H., & Najafi shahreza, M.M. , & Hassani, S. (2016). Prioritization of Components of the System of Communications and Coordination Using the People Capability Maturity Model, MCSER Publishing.7(3).
Baradaran, B. & Habibi, M. (2021). Pathology of Human Resources Processes Using the People Capability Maturity Model (PCMM) in Khazar Oil Company, HRM in oil industry Journal , 42(11), 263-288
Corbin J., & strass A., Grauded theory reseaech:procedares, canons, and eraluative critevla Qualitafive sociahoyy, PP. 1-2019.
Curtis, B. & hefely,M. (2010). People capability maturity model.2nd ed. Carnegie Mellon University Education. 49, 151-162.
Davari,A and rezazadeh,A(2017).Structural equation modeling with PLS,University jihad publications,Tehran,pp.97
Ferasatkhah, M. (2019). Ninth Meeting on Population and Scientific Development of Iran, 17 Feb
Jing lee, A. (2016). Exploring the Role of People Capability Maturity Model and Identifying People-Related Critical Success Factors in Large-Scale Organization with Agile Practice. [ PhD Dissertation of the St. Gallen, School of Management, Economics.
Kamalanabhan,T.J. & Kothandaraman, K. (2017). A Scale to Measure Perceptions of Organizational Maturity, Psychology Studies, 62(1), 47–59.
Mosakhani,M and nayebi,M and bakhshi.j (2020). Evaluate human resource management through the Capacity Maturity Model (P-CMM) in small and medium-sized organizations, management resources,89,pp. 75-80
Mohsenzade,H and imamverdi,M (2013). Prioritize factors affecting employee maturity, The First International Conference on Political Epic (with an Approach to Middle East Developments) and Economic Epic (with an Approach to Management and Accounting,roodhen, https://civilica.com/doc/494972
Mohagheghzadeh, M. (2019). Determining the level of maturity of human resource capabilities with PCMM model and examining the relationship between empowerment factors and the results of EFQM excellence model with human resource capability levels [Ms.c Desseration, University of Fars payam e noor].
Raei Dehaghi, M. (2019). Enhancing Employee’s Capability Maturity Level in Iran’s Oil Company, EJBMR, 4(6)
Samimi, S. Imani,M. & ؛ Delkhosh kasmaie, A. (2018). A Model for Risk Management based on People-Capability maturity model (P-CMM) Levels and Education Quality (Case Study: South Pars Gas Complex), Journal of New Approaches In Educational Administration, 3(35), 221-245
Shekari, G. A. Sheibanifar, M. S. (2013). Evaluation of the Performance Management System of Gas Company Employees in Khorasan Razavi Using the Personnel Capability Maturity Model (PCMM). Management: Future Research Management, 92, 1-24
Shamszare,m and tahmasebi,r and yazdani,h.r. (2017). Assess the maturity of human resource processes based on the Philips model. Human resourse management projects,10 (1) pp.1-24
Surega, N. (2019). Application OF People Capability Maturity Model In Business Process Outsourcing Enterprises Study With Reference To TAMIL NADU , IJHRMR, 9(1), 77-86
Titove, S. & Bubnov, G. & Guseva, M. (2016). Capability maturity models in engineering companies: case study analysis, EDP Sciences.
Vakaslahti, p. (2018). Process Improvement Frameworks – a Small Case Study with People Capability Maturity Model, SOFTWARE PROCESS, 3, 225–234.