Abstract :
Introduction: The present study aims to identify and develop the key components and constraints affecting women's labor productivity, as well as determine the significance of each constraint in project based organizations. Employing women's talent and working capabilities can improve the competitive ability and achievements of the organization.
Methods: This research is applied in nature, cross-sectional, and descriptive. It was conducted in the Shiraz Municipality. After a literature review and consultation with experts, 41 productivity-limiting attributes were categorized into six main dimensions. Using the Best-Worst Decision-Making Technique, data were collected via a questionnaire distributed among 16 women from the Human Resources department of Shiraz Municipality, and the attributes were tested.
Findings: The results of the study indicate that among the main dimensions, the “Management/Planning/Supervision” dimension, followed by the “Materials/Tools/Equipment/Machinery” and “Construction Methods/Technology” dimensions, ranked first, second, and third, respectively. Among the identified attributes, the “Lack or shortage of materials/tools/equipment/machinery,” “Lack of modern technology and planning,” and “Low quality of materials/tools/equipment/machinery” ranked first, second, and third, respectively, having the most significant impact on reducing Women's labor productivity.
Conclusion: This research can increase our information regarding the promotion of effective indicators for women's productivity and the removal of existing possible obstacles. Project-oriented organizations, in order to improve their competitive performance and improve their economic incentives, should use their innovation capacities in order to use women's productivity more effectively. Paying attention to and removing these limitations can direct the project according to the previously developed schedule, in such a way that it faces the least delay and minimum reduction in quality.
1- Akomah B B, Lawson R W, Jackson, E N. Improving Labour Productivity in Ghanaian Building Construction Projects. Baltic Journal of Real Estate Economics and Construction Management. 2020; 8(1), 152-169. https://doi.org/10.2478/bjreecm-2020-0011
2- Al-Abbadi G M D, Agyekum-Mensah G. The effects of motivational factors on construction professionals productivity in Jordan. International Journal of Construction Management. 2019; 22(5), 820-831. https://doi.org/10.1080/15623599.2019.1652951
3- Ali M, Kulik CT, Metz I. The gender diversity-performance relationship in services and manufacturing organizations. Int. J. Human Res. Manage. 2011; 22(7), 1464–1485. https://doi.org/10.1080/09585192.2011.561961
4- Assaad R H, El-adaway I H, Hastak M, LaScola Needy K. Key Factors Affecting Labor Productivity in Offsite Construction Projects. Journal of Construction Engineering and Management. 2022; 149(1), 04022158. https://doi.org/10.1061/JCEMD4.COENG-12654
5- Baharin R, Syah Aji R H, Yussof I, Mohd Saukani N. Impact of human resource investment on labor productivity in Indonesia. Iranian Journal of Management Studies. 2020; 13(1), 139-164. https://doi.org/10.22059/ijms.2019.280284.673616
6- Bahr M, Laszig L. Productivity development in the construction industry and human capital: a literature review. arXiv preprint arXiv .2104. 00129. 2021; 8(3). https://doi.org/10.48550/arXiv.2104.00129
7- Baker M, Ali M, French E. The impact of women’s representation on performance in project-based and non-project-based organizations. International Journal of Project Management. 2019; 37(7), 872-883. https://doi.org/10.1016/j.ijproman.2019.06.001
8- Barney JB. Firm resources and sustained competitive advantage. Aust.J. Manag. 1991; 17(1), 99–120. https://doi.org/10.1177/014920639101700108
9- Bennett JF, Davidson MJ, Gale AW. Women in construction: acomparative investigation into expectations and experiences of female andmale construction undergraduates and employees. Women Manag. Rev. 1999; 14(7), 273–292. https://doi.org/10.1108/09649429910291122
10- Dezsö CL, Ross DG. Does female representation in top management improve firm performance? a panel data investigation. Strateg. Manag. J. 2012; 33 (9), 1072–1089. https://doi.org/10.1002/smj.1955
11- Díaz-García C, González-Moreno A, Sáez-Martínez FJ. Gender diversity within R&D teams: its impact on radicalness of innovation. Innov. Org. Manage. 2013; 15 (2), 149–160. https://doi.org/10.5172/impp.2013.15.2.149
12- Gale A, Cartwright S. Women in project management: entry into a male domain? A discussion on gender and organizational culture–part 1. Leadership & Organization Development Journal. 1995;16 (2), 3–8. https://doi.org/10.1108/01437739510082262
13- Gunduz M, Abu-Hijleh A. Assessment of human productivity drivers for construction labor through importance rating and risk mapping. Sustainability. 2020; 12(20), 8614. https://doi.org/10.3390/su12208614
14- Gurmu A T, Ongkowijoyo C S. Predicting construction labor productivity based on implementation levels of human resource management practices. Journal of Construction Engineering and Management. 2019;146(3), 04019115. https://doi.org/10.1061/(ASCE)CO.19437862.00017
15- Irfan M, Zahoor H, Abbas M, Ali Y. Determinants of labor productivity for building projects in Pakistan. Journal of Construction Engineering, Management & Innovation. 2020; 3(2), 85-100. https://doi.org/10.31462/jcemi.2020.02085100
16- Jackson SE, Joshi A, Erhardt NL. Recent research on team and organizational diversity: SWOT analysis and implications. Aust. J. Manag. 2003; 29(6),801–830. https://doi.org/10.1016/S01492063(03)00080-1
17- Joecks J, Pull K, Vetter K. Gender diversity in the boardroom and firm performance: what exactly constitutes a ‘critical mass’? J. Bus. Ethics. 2013; 118 (1), 61–72. https://doi.org/ 10.1007/s10551-012-1553-6
18- Johari S, Jha K N. Impact of work motivation on construction labor productivity. Journal of management in engineering. 2020; 36(5), 04020052. https://doi.org/10.1061/(ASCE)ME.19435479.000082
19- Kumar K, Rana R. Analysis of Critical Factors Affecting Labor Productivity of Construction Projects in Himachal Pradesh. In Advances in Construction Materials and Sustainable Environment: Springer Singapore. 2022; vol 196, pp. 1047-1058. https://doi.org/10.1007/978-981-16-6557-8_84
20- Loosemore M, Galea N. Genderlect and conflict in the Australian construction industry. Constr. Manag. Econ. 2008; 26 (2),125–135. https://doi.org/10.1080/01446190701798810
21- Manoharan K, Dissanayake P, Pathirana C, Deegahawature D, Silva R. Assessing the performance and productivity of labour in building construction projects through the application of work-based training practices. Construction Innovation. 2024; 24(2), 558-583. https://doi.org/10.1108/CI-05-2022-0126
22- Manoharan K, Dissanayake P, Pathirana C, Deegahawature D, Silva R. Assessment of critical factors influencing the performance of labour in Sri Lankan construction industry. International Journal of Construction Management. 2020; 23(1), 144-155. https://doi.org/10.1080/15623599.2020.1854042
23- Maqsoom A, Khan K, Musarat M A, Mubasit H, Umer M. Influence of internal workforce diversity factors on labor productivity in construction projects: empirical evidence from Pakistan. Second International Sustainability and Resilience Conference: Technology and Innovation in Building Designs.2020; 51154, 1-7. https://doi.org/10.1109/IEEECONF51154.2020.9319935
24- Marinova J, Plantegna J, Remery C. Gender diversity and firm performance: evidence from Dutch and Danish boardrooms. Int. J. Human Res. Manage. 2015; 27 (15), 1777–1790. https://doi.org/10.1080/09585192.2015.1079229
25- McMillan M, Zeufack A. Labor productivity growth and industrialization in Africa. Journal of Economic Perspectives. 2022; 36(1), 3-32. https://doi.org/ 10.1257/jep.36.1.3
26- Momade M H, Shahid S, Falah G, Syamsunur D, Estrella D. Review of construction labor productivity factors from a geographical standpoint. International Journal of Construction Management. 2021; 23(4), 697-707. https://doi.org/10.1080/15623599.2021.1917285
27- Ostergarrd C, Timmermansa B, Kristinsson K. Does a different view create something new? the effect of employee diversity on innovation. Res. Policy. 2011; 40(3), 500–509. https://doi.org/10.1016/j.respol.2010.11.004
28- Peretz H, Levi A, Fried Y. Organizational diversity programs across cultures: effects on absenteeism, turnover, performance and innovation. Int. J. Human Res. Manage. 2015; 26 (6), 875–903. https://doi.org/10.1080/09585192.2014.991344
29- Rezaei J. Best-worst multi-criteria decision-making method: Some properties and a linear model. Omega. 2016; 64, 126-130. https://doi.org/10.1016/j.omega.2015.12.001
30- Salimova G, Ableeva A, Galimova A, Bakirova R, Lubova T, Sharafutdinov A, et al. Recent trends in labor productivity. Employee Relations: The International Journal. 2022; 44(4), 785-802. https://doi.org/10.1108/ER-03-2021-0111
31- Torabi N, Jamshidvand A. Investigating Factors Affecting Human Resource Productivity in government organizations. International Journal of Current Science Research and Review. 2022; 5(1), 44-49. https://doi.org/10.47191/ijcsrr/V5-i1-06
32- Trinidad C, Normore AH. Leadership and gender: a dangerous liaison? Leadersh. Org. Dev. J. 2005; 26 (7), 574–590. https://doi.org/10.1108/01437730510624601
33- Whitley R. Project-based firms: new organizational form or variations on a theme? Ind. Corp. Change. 2006; 15 (1), 77–99. https://doi.org/10.1093/icc/dtj003
34- Woolley AW, Aggarwal I, Malone TW. Collective intelligence and group performance. Current Directions in Psychological Science. 2015; 24 (6), 420–424. https://doi.org/10.1177/0963721415599543
35- Wright PM, McMahan GC, McWilliams A. Human resources and sustained competitive advantage: a resource-based perspective. Int. J. Human Res. Manage. 1994; 5(2), 301–326. https://doi.org/10.1080/09585199400000020
36- Yarahmadi M, Mirhoseini M, Komasi M, Ehsanifar M. The Factors Affecting Human Resources Productivity in Urban Construction Projects: A Comparison of Relative Importance Index and Fuzzy Logic Methods. Fuzzy Optimization and Modeling Journal. 2023; 4(3), 54-71. https://doi.org/10.30495/fomj.2023.1992756.1106 37- Zhan W, Pan W, Chen L. Construction project productivity evaluation framework with expanded system boundaries. Engineering, Construction and Architectural Management. 2021; 28(4), 863-885. https://doi.org/10.1108/ECAM-12-2019-0691
38- Zhilyakov D I, Kharchenko E V, Kandiba A A.. Labor productivity modeling in the agricultural sector. In IOP Conference Series: Earth and Environmental Science. 2021; 677(2), 022073. https://doi.org/10.1088/17551315/677/2/022073