• Home
  • Productivity Improvement of BOB T-shirt through Line Balancing Using Control Limit analysis and discrete event simulation (Case study: - MAA Garment and Textile Factory)

Share To

Article Url


Manuscript ID : JOIE-1802-1545 (R5) Visit : 261 Page: 19 - 32

10.22094/joie.2020.561766.1545

20.1001.1.22519904.2021.14.1.3.4

Article Type: Original Research

Related articles