A

  • Abedi.sadegh Using Markov Chain to Analyze Production Lines Systems with Layout Constraints [ Vol.2, Issue 3 - Summer Year 2009]
  • Akhavan Niaki.S.T. A Hybrid Meta-Heuristic Method to Optimize Bi-Objective Single Period Newsboy Problem with Fuzzy Cost and Incremental Discount [ Vol.2, Issue 3 - Summer Year 2009]

B

E

  • Eftekhari Moghadam.Amir Masoud Estimation of Products Final Price Using Bayesian Analysis Generalized Poisson Model and Artificial Neural Networks [ Vol.2, Issue 2 - Spring Year 2009]

F

  • Fattahi.parviz A New Approach in Job Shop Scheduling: Overlapping Operation [ Vol.2, Issue 3 - Summer Year 2009]

K

  • Karimi nasab.Mehdi Multiple Batch Sizing through Batch Size Smoothing [ Vol.2, Issue 2 - Spring Year 2009]

M

  • Masehian.Ellips Designing Solvable Graphs for Multiple Moving Agents [ Vol.2, Issue 2 - Spring Year 2009]
  • Modares.Mohammad Traffic Flow Analysis Based on Queuing Models [ Vol.2, Issue 2 - Spring Year 2009]

N

  • Niyati.Marjan Estimation of Products Final Price Using Bayesian Analysis Generalized Poisson Model and Artificial Neural Networks [ Vol.2, Issue 2 - Spring Year 2009]
  • Noorossana.Rassoul Change Point Estimation of a Process Variance with a Linear Trend Disturbance [ Vol.2, Issue 2 - Spring Year 2009]

R

  • Rashidi.Hassan An Efficient Extension of Network Simplex Algorithm [ Vol.2, Issue 2 - Spring Year 2009]

S

  • Shavandi.Hassan The Capacitated Location-Allocation Problem with Interval Parameters [ Vol.2, Issue 2 - Spring Year 2009]

T

  • Tsang.Edward P.K An Efficient Extension of Network Simplex Algorithm [ Vol.2, Issue 2 - Spring Year 2009]

Z

  • Zandieh.Mostafa Vendor Selection: An Enhanced Hybrid Fuzzy MCDM Model [ Vol.2, Issue 2 - Spring Year 2009]