Designing an Improved Stochastic Planning Model for Supply Chain Considering Maintenance and Operations (MRO) in Rahiab Sanat Sepahan Engineering Technical Company
Subject Areas :Sayyed Mohammad Reza Davoodi 1 , Amir Hortamani 2 , Nafiseh Bakhtiary Dastgerdi 3
1 - Assistant professor, Department of Management, Dehaghan Branch,Islamic Azad University
2 - Assistant Professor, Department of Economic, Dehaghan Branch, Islamic Azad University , Dehaghan, Iran
3 - Master of Industrial Management, Production and Operational Orientation, Amin Institute of Higher Education, Foolad Shahr, Isfahan
Keywords:
Abstract :
[1] Talebi, D. and Iron, F. 2015. Identifying supply chain risks and supplier selection using network analysis process (Case study: Automotive industry). Industrial Management Perspectives. 5 (1): 31-43.
[2] Jafarnejad, A., Morvati Sharifabadi, A. and Ataiee, A. 2012. Management of logistics supply chain, Tehran: Gostaresh-e-Ulum Publications.
[3] Ghazanfari, M and Fathullah, M. 2006. A comprehensive approach to supply chain management, Tehran: Iran University of Science and Technology. Technical report.
[4] Hamidiyeh, A. Arshadi Khamseh, A and Naderi, b. 2016. Combining new robust planning with credit constraints for a responsive-dependent closed-loop supply chain network under uncertainty and disruption. Journal of Engineering and Quality Management. 6 (4): 213-227.
[5] Rahmani, M., Ebrahimi, B., Khakzar Befrouei and M. 1396. Development of a comprehensive model of data envelopment analysis to determine the best supplier of inaccurate waste and weight constraints. Production and Operations Management. 8 (1): 101-118.
[6] Hosseini, M. and Shekhi, N. 2012. Explaining the strategic role of supply chain management operations in improving company performance: A study of the Iranian food industry, Strategic Management Studies. 3(10):35-60.
[7] Langenberg, K., Seifert, R., and Tancrez, J. 2012.Aligning supply chain portfolios with product portfolios. International Journal of Production Economics. 135(1): 500-513.
[8] Tavana.M., Zarook.Y. and Santos-Arteaga. F.j. 2015. An integrated three-stage maintenance scheduling model for unrelated parallel machines with aging effect and multi-maintenance activities. Computers & Industrial Engineering. 83: 226-236.
[9] Wibowo, A., Tjahjono, B. and Tomiyama, T. 2017. Designing Contracts for Aero-Engine MRO Service Providers:Models and Simulation. Procedia CIRP. 59:246-251.
[10] Rajesh,R. and Ravi,V. 2014. Supplier selection in resilient supply chains: a grey relational analysis approach. Journal of Cleaner Production. 86:343-359.
[11] Yoav, B. and Gur, M. 2016. A single machine scheduling problem to minimize total early work. Computers & Operations Research. 73: 115-118.
[12] Zhu.H., Li.M. and Zhou.Z. 2015. Machine scheduling with deteriorating and resource-dependent maintenance activity. Computers & Industrial Engineering. 88: 479-486.
[13] Busstra, M. and Van dongen.L. 2015.Creating value by integrating logistac trains services and maintenance activities. Procedia cirp. 38:250-254.
[14] Giri, B.C. and Sharma, S. 2017.Optimizing a closed-loop supply chain with manufacturing defects and quality dependent return rate. Journal of Manufacturing Systems. 35:92-111.
[15] Taherkhani, M. and Tavakoli Moghaddam, R. 2017. Development of a two-objective quadrilateral supply chain model using STEM method. Production and Operations Management. 8 (1): 65-78.
[16] Azimian, M., Javadi, H., Farshchiha, A. and Nasoohi, A. 1396. Selecting the best supplier combination by providing a combined approach to decision making with multiple criteria and analysis tree and error analysis. Production and Operations Management, 8 (1): 45-64.
[17] Yousefinejad, M. and Neyshabouri, A. 2009. Critical path analysis of finite resources based on discrete event simulation and group optimization of components, 5th International Conference on Project Management, Tehran, Ariana Research Group.
[18] Karami, A., Arab, A. and Fallah Lajimi, H. 2016. Assessing the effect of key success factors of supply chain agility on the strategic performance of electronics companies in Iran, Tehran: Institute of Humanities and Cultural Studies, a comprehensive protocol of humanities. 19(4): 185-206. |
[19] Aghajani, H., Samadi Miarkalaei, H. and Farmanzadeh, M. 2014. Investigation and measurement of supply chain elasticity with fuzzy logic approach (Experimental control: auto parts manufacturing industry in Mazandaran province). Industrial Management Quarterly. 9 (27):83-94.
[20] Agha Ahmadi, F. and Mahoutchi, M. 2013. Two-stage random planning for supply chain design of perishable materials, 10th International Conference on Industrial Engineering, Tehran, Iran Industrial Engineering Association, Amir Kabir University of Technology.
[21] Arab, L and Davoodi, S. M. R. 2019. Designing a closed-loop supply chain model in conditions of uncertainty, taking into account intermediate warehouses (Case study: Khodrang Company). Industrial Management Quarterly. 14 (49):73-94.