A Mixed Integer Nonlinear Programming for Facility Layout Problem with Maintenance Constraints
Subject Areas :
Mehdy Morady Gohareh
1
,
Ehsan Mansouri
2
1 - Assistant Professor, Department of Industrial Engineering, Arak University, Arak, Iran
2 - Assistant Professor, Department of Industrial Engineering, Arak University, Arak, Iran
Received: 2020-11-02
Accepted : 2020-12-02
Published : 2020-11-01
Keywords:
References:
[1] Pillai, V. , Hunagund, I. B. and Krishnan, K. K. 2011. Design of robust layout for dynamic plant layout problems. Computers & Industrial Engineering. 61(3): 813-823.
[2] Ahmadi, A., Pishvaee, M. and Jokar, M. R. A. 2017. A survey on multi-floor facility layout problems. Computers & Industrial Engineering. 107: 158-170.
[3] Huang, H. , May, M. D., Huang, H. M. and Huang, Y. W. 2010. July. Multiple-floor facilities layout design. In Proceedings of 2010 IEEE International Conference on Service Operations and Logistics, and Informatics. SOLI: 165-170.
[4] Francis, R. , McGinnis, L. F. and White, J. A. 1992. Facility layout and location: an analytical approach. Pearson College Division.
[5] See, P. and Wong, K. Y. 2008. Application of ant colony optimisation algorithms in solving facility layout problems formulated as quadratic assignment problems: a review. International Journal of Industrial and Systems Engineering. 3(6): 644-672.
[6] Luo, X., Yang, Y. , Ge, Z. X., Wen, X. S. and Guan, F. J. 2014. Layout problem of multi-component systems arising for improving maintainability. Journal of Central South University. 21(5): 1833-1841.
[7] Military Handbook, DOD-HDBK-791 (AM). 2005. Maintainability Design Techniques. Department of Defense: USA.
[8] Song, S., Li, Q., Felder, F. , Wang, H. and Coit, D. W. 2018. Integrated optimization of offshore wind farm layout design and turbine opportunistic condition-based maintenance. Computers & Industrial Engineering. 120: 288-297.
[9] Vitayasak, S., Pongcharoen, P. and Hicks, C. 2019. Robust machine layout design under dynamic environment: dynamic customer demand and machine maintenance. Expert Systems with Applications: X. 3:100015.
[10] Németh, I., Püspöki, J., Viharos, A.B., Zsóka, L. and Pirka, B. 2019. Layout configuration, maintenance planning and simulation of AGV based robotic assembly systems. IFAC-PapersOnLine, 52(13): 1626-1631.
[11] Astariz, S., Abanades, J., Perez-Collazo, C. and Iglesias, G. 2015. Improving wind farm accessibility for operation & maintenance through a co-located wave farm: Influence of layout and wave climate. Energy Conversion and Management, 95: 229-241.
[12] Daskin, M. 2011. Network and discrete location: models, algorithms, and applications. John Wiley & Sons.
[13] Yaghin, R. , Sarlak, P. and Ghareaghaji, A. A. 2020. Robust master planning of a socially responsible supply chain under fuzzy-stochastic uncertainty (A case study of clothing industry). Engineering Applications of Artificial Intelligence. 94:103715.