Prioritization of Lean-production Components with Fuzzy Network Analysis: A Case Study (Sam Electric Co.)
Subject Areas :Sayyed Mohammad Reza Davoodi 1 , Fatemeh Pasamehr 2
1 - Assistant Professor, Faculty of Management, Dehaghan Branch, Islamic Azad University, Dehaghan, Iran
2 - Ph.D. Student in Industrial Management (Subdiscipline of Financial), Dehaghan Branch, Islamic Azad University,
Dehaghan, Iran
Keywords:
Abstract :
[1] JafarNejad, A., Ahmadi, A. andMaleki, M. H. 2011. Lean Production Evaluation using a Combination of Techniques ANP and DEMATEL in Fuzzy Conditions. Studies Industrial Management. 8(20): 1-25.
[2] Mirzai, M. andAkhundani,A.2015.A Review of Lean Production in Different Industries. Second National Conference on Industrial Engineering Research, Tehran, Bouali Research Group. 1: 15-22.
[3] Davari, D.2007. Different Attitudes to Production Management Systems in the Recent Decade. Tadbir, 106: 53-64.
[4] IzadMehr, J. andRahmani, F.2015.Estimation of the Implementation of a Lean Manufacturing System in Pars Co. Using SAE J4000 Standard. Third International Accounting and Management Conference, Tehran, MehrIshraq Contemporary Institute.
[5] Asadi, S., Qaraee, A. andPanahi, H.2011.The Factors of Lean Production in the Production Process of Dairy Milk Production. Journal Food Industry Research. 21(4): 495-511.
[6] Majava, J. andOjanper, A. T.2017.Lean Production Development in SMEs: ACase Study. Management and Production Engineering Review. 8(2): 41-48.
[7] AlManei, M., Salonitis, K. and Xu, Y.2017. Lean Implementation Frameworks: The Challenges for SMEs. Science Direct. 63: 750-755.
[8] Mrugalska, B. andAhram, T.2017. Managing Variations in Process Control: An Overview of Sources and Degradation Methods. Ergonomics Modeling, Usability and Special Populations. Advances in Intelligent Systems and Computing. 486: 377-387.
[9] Prajapati, M. R. and Deshpande, V.2015.Cycle Time Reduction using Lean Principles and Techniques: A Review. International Engineering, Industrial., 3(4): 208-213.
[10] Sepahvand, R., Arefnezhad, M. andToghraieSamiromi, M.2013.Attaining World Glass Production: Analyzing Factors Affecting Successful Implementation of Lean Six Sigma(Case Study: Household ApliancesIndustry). Journal of industrial management. 7(22): 71-82.
[11] Gupta, S. H. and Kumar Jain, S.2013.A Literature Review of Lean Manufacturing.International Journal of Management Science and Engineering Management. 8(4): 241-249.
[12] Rahman, N. A. A., Sharif, S. M. and Esa, M. M.2013. Lean Manufacturing Case Study with Kanban System Implementation. Procedia Economics and Finance. 7(1): 174-180.
[13] Gamage, K., Piyanka W., Jayathilake, L., Perera, H., Gamage J. R.2012.Challenges and Potential Impact of Applying Lean Manufacturing Techniques to Textile Knitting Industry: A Case Study of a Knitting Factory in Sri Lanka. Proceedings of 3rd International Conference: Engineering, Project and Production Management (EPPM2012), Brighton, UK.
[14] Dombrowski, U., Mielke, C. and Engel, C.2012.Knowledge Management in Lean Production Systems. 45th CIRP Conference on Manufacturing Systems. 3: 436- 441.
[15] SolimaniNasab, A. andTalebi, K.2010. Examined Analysis of Failure or Success Factors Accessibility Lean Production System in Iran Tire co. Journal Geography. 4(3):229-243.
[16] Simons, D. and Taylor, D.2007.Lean Thinking in the UK Red Meat Industry: A Systems and Contingency Approach. International Journal of Production Economics. Amsterdam Elsevier. 106(1): 70-81.
[17] Abdulmalek, F. A. andRajgupal, J.2007. Analyzing the Benefits of Lean Manufacturing and Value Stream Mapping via Simulation: A Process Sector Case Study. International Journal of Production Economics. 107: 223-236.
[18] Shah, R. and Ward, P. T.2003. Lean Manufacturing: Context, Practice Bundles and Performance. Journal of Operation Management. 21(2): 124-149.
[19] Ezzabadi, J. H., Saryazdi, M. D.and Mostafaeipour, A. 2015. Implementing Fuzzy Logic and AHP into the EFQM model for performance improvement: A case study. Applied Soft Computing, 36: 165-176.
[20] Taghizadeh, H., Tari, G. H. andAwrangi, S.2010. The Study of Adopting Rate of Production Organization with Lean Thinking Principles (Case study Iran Tractor Manufacturing Company- Tabriz). Journal of Industrial Management. 5(12): 41-52.
[21] TolouiAshlaghi, A., Motadel, M. R. andEhteshamRasi, R.2009. Presentation of an Analytical Model in Establishing Lean Production System (Case Study: Leather and Shoes Industry of Tehran Province). Researcher (Management). 6(13): 36-45.
[22] Ataei, M.2010. Multi-criteria Decision Making. Shahrood University of Technology Publication. 1: 118-126.