Exact equations for the reliability and mean time to failure of 1-out-of-n cold-standby system with imperfect switching
Subject Areas : Business AdministrationSeyed Taghi Akhavan Niaki 1 , Afshin Yaghoubi 2
1 - Sharif University of Technology
2 - Department of Industrial Engineering, Sharif University of Technology, Tehran, Iran
Keywords:
Abstract :
Amari, S. V. (2012). Reliability of k-out-of-n standby systems with gamma distributions. Reliability and Maintainability Symposium (RAMS), 2012 Proceedings-Annual. IEEE.
Ardakan, M. A., Hamadani, A. Z. (2014). Reliability–redundancy allocation problem with cold-standby redundancy strategy. Simulation Modelling Practice and Theory, 42, 107-118.
Ardakan, M. A., Rezvan, M. T. (2018). Multi-objective optimization of reliability–redundancy allocation problem with cold-standby strategy using NSGA-II. Reliability Engineering & System Safety 172: 225-238.
Billinton, R., Allan, R. N. (1992). Reliability Evaluation of Engineering Systems. New York: Plenum Press.
Coit, D. W. (2001). Cold-standby redundancy optimization for non-repairable systems. IIE Transactions 33(6): 471-478.
Dhillon, Balbir S. Reliability, quality, and safety for engineers. CRC Press, 2004.
Dwyer, Vincent M., Roger M. Goodall, and Roger Dixon. Reliability of 2-out-of-N: G systems with NHPP failure flows and fixed repair times. International Journal of Reliability, Quality and Safety Engineering 19.01 (2012): 1250003.
Jia, X., Chen, H., Cheng, Z., Guo, B. (2016). A comparison between two switching policies for two-unit standby system. Reliability Engineering & System Safety 148 (C): 109-118.
Kim, Heungseob, and Pansoo Kim. Reliability–redundancy allocation problem considering optimal redundancy strategy using parallel genetic algorithm. Reliability Engineering & System Safety 159 (2017): 153-160.
Lenz, M., Rhodin, J. Reliability calculations for complex systems. Department of Electrical Engineering, Linköpings universitet (2011).
Levitin, G., Xing, L., Dai, Y. Cold-standby sequencing optimization considering mission cost. Reliability Engineering & System Safety 118 (2013): 28-34.
Levitin, G., Xing, L., Dai, Y. Optimal component loading in 1-out-of-N cold standby systems. Reliability Engineering & System Safety 127 (2014): 58-64.
Sharifi, M., Pourkarim Guilani, P., & Shahriari, M. (2016). Using NSGA II Algorithm for a Three Objectives Redundancy Allocation Problem with k-out-of-n Sub-Systems. Journal of Optimization in Industrial Engineering, 9(19), 87-96.
Sharifi, M., & Yaghoubizadeh, M. (2015). Reliability modelling of the redundancy allocation problem in the series-parallel systems and determining the system optimal parameters. Journal of Optimization in Industrial Engineering, 8(17), 67-77.
Wang, C., Xing, L., Amari, S. V. (2012). A fast approximation method for reliability analysis of cold-standby systems. Reliability Engineering & System Safety106 (C): 119-126.
Wang, W., Loman, J. Reliability/availability of K-out-of-N system with M cold standby units. Annual Reliability and Maintainability Symposium. 2002 Proceedings (Cat. No. 02CH37318). IEEE, 2002.
Xing, L., Tannous, O., Dugan, J. B. (2012). Reliability analysis of non-repairable cold-standby systems using sequential binary decision diagrams. IEEE Transactions on Systems, Man, and Cybernetics-Part A: Systems and Humans 42(3): 715-726.
Yaghoubi, A., Niaki, S.T.A., Rostamzadeh, H. A closed-form equation for steady-state availability of cold standby repairable k-out-of-n, International Journal of Quality & Reliability Management 37 (2019): 145-155.
Zhai, Q., Xing, L., Peng, R., Yang, J. Reliability analysis of cold standby system with scheduled backups. 2015 Annual Reliability and Maintainability Symposium (RAMS). IEEE, 2015.