Estimation of Project Performance Using Earned Value Management and Fuzzy Regression
Subject Areas : Business StrategyMohammad Mahdi Asgari Dehabadi 1 , Mostafa Salari 2 , Ali Reza Mirzaei 3
1 - Department of Industrial engineering,
University of Economic Science
Tehran, Iran
2 - Department of Industrial engineering,
Sharif University of Technology
Tehran, Iran
3 - Department of Technology Management,
Allameh Tabataba’ee University
Tehran, Iran
Keywords:
Abstract :
[1] PMI. (2012), Practice standard for Earned Value management. PMI Publication.
[2] Al-Jibouri, S. H. (2003), Monitoring systems and their effectiveness for
project cost control in construction. International Journal of Project Management,
21 (2), 145-154.
[3] Bagherpour, M., Zareei, A., Noori, S., and Heydari, M. (2010), Designing
a control mechanism using earned value analysis: An application to production
environment. International Journal of Advanced Manufacturing
Technology, 49 (5-8), 419-429.
[4] Baumeister, A. and Floren, A. (2011), Optimizing the Configuration of
Development Teams Using EVA: The Case of Ongoing Project Adjustments
Facing Personnel Restrictions. International Journal of Information
Technology Project Management, 2 (1), 62-77.
[5] Moselhi, O., Li, J., and Alkass, S. (2004), Web-based integrated project
control system. Construction Management and Economics, 22 (1), 35-46.
[6] Oven, J. K. (2007), Implementing EV management in a R & D environment.
AACE International Transactions EVM, 1, 01-05.
[7] Anbari, F. (2003), Earned Value Project Management Method and Extensions.
Project Management Journal, 34 (41), 12-23.
[8] Cioffi, D. F. (2006), Designing project management: A scientific notation
and improved formalism for EV calculations. International Journal
of Project Management , 24, 134-144.
[9] Jacob, D. S. (2003), Forecasting project schedule completion with earned
value metrics. The Measurable News, 1, 7-9.
[10] Lipke, W. (2003), Schedule is different. The Measurable News, 31-34.
[11] MoslemiNaeni, L. and Salehipour, A. (2011), Evaluating fuzzy earned
value indices and estimates by applying alpha cuts. Expert Systems with
Applications, 38 (7), 8193-8198.
[12] Salari, M., Bagherpour, M., and Kamyabniya, A. (2014), Fuzzy extended
earned value management: A novel perspective. Journal of Intelligent and
Fuzzy Systems. Pre-press.
[13] Salari, M., Bagherpour, M., and Wang, J. (2014), A novel earned value
management model using Z-number. International Journal of Applied Decision
Sciences, 7 (1), 97-119.
[14] Jacob, D. S. and Kane, M. (2004), Forecasting schedule completion using
earned value metrics revisited. The Measurable News, 1, 11-17.
[15] Barraza, G. A., Back, W. E., and Mata, F. (2004), Probabilistic forecasting
of project performance using stochastic S curves, 130 (1), 25.
[16] Dillibabu, R. and Krishnaiah, K. (2005), Cost estimation of a software
product using COCOMO II. 2000 model-A case study. International Journal
of Project Management, 23 (4), 297-307.
[17] Lipke, W., Zwikael, O., Henderson, K., and Anbari, F. (2009), Prediction
of project outcome: The application of statistical methods to earned
value management and earned schedule performance indexes. International
Journal of Project Management, 27 (4), 400-407.
[18] Warburton-Roger, D. H. (2011), A time-dependent earned value model
for software projects. International Journal of Project Management, 29
(8), 1082-1090.
[19] Feylizadeh, M. R., Hendalianpour, A., and Bagherpour, M. (2012), A
fuzzy neural network to estimate at completion costs of construction
projects. International Journal of Industrial Engineering Computations,
3 (3), 477-484.
[20] Azman, M. A., Abdul-Samad, Z., and Ismail, S. (2013), The accuracy
of preliminary cost estimates in Public Works Department (PWD) of
Peninsular Malaysia. International Journal of Project Management, 31
(7), 994-1005.
[21] Caron, F., Ruggeri, F., and Merli, A. (2013), A Bayesian Approach to
Improve Estimate at Completion in Earned Value Management. Project
Management Journal, 44 (1), 3-16.
[22] Zadeh, L. (1965), Fuzzy sets. Information and Control, 338-353.
[23] Naeni, L., Shadrokh, S., and Salehipour, A. (2011), A fuzzy approach for
earned value management. International Journal of Project Management,
29, 764-772.
[24] Vandevoorde, S. and Vanhoucke, M. (2005), A comparison of different
project duration forecasting methods using EV metrics. International
Journal of Project Management, 24, 289-302.
[25] Tanaka, H., Uejima, S., and Asai, K. (1982), Linear regression analysis
with fuzzy model. IEEE Transaction on Systems, Man and Cybernetics,
12 (6), 903-907.
[26] Change, Y. and Ayyub, B. (2001), Fuzzy regression methods-a comparative
assessment. Fuzzy sets and systems, 119 (2), 187-203.
[27] D’Urso, P. (2003), Linear regression analysis for fuzzy/crisp input and
fuzzy/crisp output data. Computational Statistics & Data Analysis, 42,
47-72.
[28] Yang, M. S. and Lin, T. S. (2002), Fuzzy least squares linear regression
analysis for fuzzy input-output data. Fuzzy Sets and Systems, 126, 389-
399.
[29] Kiossi, M. C. and Shapiro, A. (2006), Fuzzy formulation of the Lee-Carter
model for morality forecasting. Insurance, Mathematics and Economics,
39, 287-309.
[30] S´anchez, J. d. A. (2006), Calculating insurance claim reserves with fuzzy
regression. Fuzzy Sets and Systems, 157 (23), 3091-3108