Using Genetic Algorithm to Robust Multi Objective Optimization of Maintenance Scheduling Considering Engineering Insurance
Subject Areas : Business StrategySomayeh Molaei 1 , Mir Mahdi Seyed Esfahani 2 , Akbar Esfahanipour 3
1 - Department of Industrial Engineering,
Amirkabir University of Technology,
Iran, Tehran
2 - Department of Industrial Engineering,
Amirkabir University of Technology,
Iran, Tehran
3 - Department of Industrial Engineering,
Amirkabir University of Technology,
Iran, Tehran
Keywords:
Abstract :
[1] Bashiri, M., Badri, H., and Hejazi, T. H. (2011), Selecting optimum maintenance
strategy by fuzzy interactive linear assignment method. Applied
Mathematical Modeling, 35 (1), 152-164.
[2] Bevilacqua, M. and Braglia, M. (2000), The analytic hierarchy process applied
to maintenance strategy selection. Reliability Engineering & System
Safety, 70 (1), 71-83.
[3] Mobley, R. K. (2002), An introduction to predictive maintenance.
Butterworth-Heinemann.
[4] Li, J. R., Khoo, L. P., and Tor, S. B. (2006), Generation of possible multiple
components disassembly sequence for maintenance using a disassembly
constraint graph. International Journal of Production Economics, 102 (1)
51-65.
[5] Canfield, R. V. (1986), Cost optimization of periodic preventive maintenance.
Reliability, IEEE Transactions, 35 (1), 78-81.
[6] Panagiotidou, S. and Tagaras, G. (2007), Optimal preventive maintenance
for equipment with two quality states and general failure time distributions.
European journal of operational research, 180 (1), 329-353.
[7] Yao, X., Fu, M., Marcus, S. I., and Fernandez-Gaucherand, E. (2001), Optimization
of preventive maintenance scheduling for semiconductor manufacturing
systems: models and implementation. In Control Applications,
Proceedings of the 2001 IEEE International Conference, 407-411.
[8] Charles, A. S., Floru, I. R., Azzaro-Pantel, C., Pibouleau, L., and
Domenech, S. (2003), Optimization of preventive maintenance strategies
in a multipurpose batch plant: application to semiconductor manufacturing.
Computers & chemical engineering, 27 (4), 449-467.
[9] Usher, J. S., Kamal, A. H., and Syed, W. H. (1998), Cost optimal preventive
maintenance. IIE transactions, 309 (12), 1121-1128.
[10] Levitin, G. and Lisnianski, A. (2000), Short communication optimal replacement
scheduling in multi?state series-parallel systems. Quality and
Reliability Engineering International, 16 (2), 157-162.
[11] Jayakumar, A. and Asgarpoor, S. (2004), Maintenance optimization of
equipment by linear programming. In Probabilistic Methods Applied to
Power Systems, 145-149.
[12] Canto, S. P. (2008), Application of Benders’ decomposition to power plant
preventive maintenance scheduling. European journal of operational research,
184 (2), 759-777.
[13] Budai, G., Huisman, D., and Dekker, R. (2005), Scheduling preventive
railway maintenance activities. Journal of the Operational Research Society,
57 (9), 1035-1044.
[14] Shirmohammadi, A. H., Zhang, Z. G., and Love, E. (2007), A computational
model for determining the optimal preventive maintenance policy
with random breakdowns and imperfect repairs. Reliability, IEEE Transactions,
56 (2), 332-339.
[15] Tam, A. S. B., Chan, W. M., and Price, J. W. H. (2006), Optimal maintenance
intervals for a multi-component system. Production Planning and
Control, 17 (8), 769-779.
[16] Moghaddam, K. S. and Usher, J. S. (2011), Preventive maintenance and
replacement scheduling for repairable and maintainable systems using dynamic
programming. Computers & Industrial Engineering, 60 (4), 654-
665.
[17] Kim, H., Nara, K., and Gen, M. (1994), A method for maintenance
scheduling using GA combined with SA. Computers & Industrial Engineering,
27 (1), 477-480.
[18] Samrout, M., Yalaoui, F., Chtelet, E., and Chebbo, N. (2005), New methods
to minimize the preventive maintenance cost of series-parallel systems
using ant colony optimization. Reliability engineering & system safety, 89
(3), 346-354.
[19] Limbourg, P. and Kochs, H. D. (2006), Preventive maintenance scheduling
by variable dimension evolutionary algorithms. International journal of
pressure vessels and piping, 83 (4), 262-269.
[20] Quan, G., Greenwood, G. W., Liu, D., and Hu, S. (2007), Searching for
multiobjective preventive maintenance schedules: Combining preferences
with evolutionary algorithms. European Journal of Operational Research,
177 (3), 1969-1984.
[21] Moradi, E., Fatemi Ghomi, S. M. T., and Zandieh, M. (2011), Bi-objective
optimization research on integrated fixed time interval preventive maintenance
and production for scheduling flexible job-shop problem. Expert
systems with applications, 38 (6), 7169-7178.
[22] Naderi, B., Zandieh, M., and Aminnayeri, M. (2011), Incorporating periodic
preventive maintenance into flexible flow shop scheduling problems.
Applied Soft Computing, 11 (2), 2094-2101.
[23] Berrichi, A., Yalaoui, F., Amodeo, L., and Mezghiche, M. (2010), Bi-
Objective Ant Colony Optimization approach to optimize production and
maintenance scheduling. Computers & Operations Research, 37 (9), 1584-
1596.
[24] Smith. C. O. (1976), Introduction to Reliability in Design, first edition,
McGraw-Hill, New York.
[25] Yun, W. Y. and Kim, J. W. (2004), Multi-level redundancy optimization
in series systems. Computers & Industrial Engineering, 46 (2), 337-346.
[26] Kouvelis, P. and Yu, G. (1997), Robust discrete optimization and its applications,
14, Springer.
[27] Serafini, P. (1994), Simulated annealing for multi objective optimization
problems. In Multiple criteria decision making, 283-292).
[28] Suppapitnarm, A., Seffen, K. A., Parks, G. T., and Clarkson, P. J. (2000),
A simulated annealing algorithm for multiobjective optimization. Engineering
Optimization, 33 (1), 59-85.