Modeling a Concentration Pattern on Critical Paths in Control of Project Delays
Subject Areas : International Journal of Industrial Mathematicsوحید روح العلم 1 , عباس شیخ ابومسعودی 2
1 - گروه مهندسی صنایع، واحد نجف اباد، دانشگاه آزاد اسلامی، نجف آباد، ایران.
2 - گروه مهندسی صنایع، واحد نجف اباد، دانشگاه آزاد اسلامی، نجف آباد، ایران.
Keywords:
Abstract :
[1] Y. Abdelhadi, M. F. Dulaimi, A. Bajracharya, Factors influencing the selection of delay analysis methods in construction projects in UAE, International Journal of Construction Management 19 (2019) 329-340. http://dx.doi.org/10.1080/15623599.2018.1435155/: .
[2] H. Bazi, Sh. Mirsaeidi, Project Delay Analysis considering Financial Payment, Researchgate, International Project Management Conference (2013) .
[3] Chou Hui-Yu, Yang Jyh-Bin, Preliminary Evaluation of BIM-based Approaches for Schedule Delay Analysis, IOP Conference Series: Materials Science and Engineering, (2017).
[4] M. Golabchi, H. Talkhabi, M. Parchami, M. Bemanian, Compilation and analysis of claim packet models in non-industrial design projects in Iran, Management Studies in Iran, Journal of Management Research in Iran, Tarbiat Modarres University Press, (2014).
[5] H. Iranmanesh, M. Piltan, H. Mohammadlou, Comparison of delay analysis methods for construction projects and implementation of the timing windows method for a real project, the first conference of the thermal power industry, (2009).
[6] A. Momeni, A. S. Kheirkhah, A Model for Preventing Delays in Projects with a Dynamic Decision Approach, Second International Project Management Conference. Second International Project Management, (2006).
[7] F. Rahnama Roodposhti, V. Rooholelm, Portfolio management with heuristic optimazation, Tehran, Islamic Azad University, Science and Research Branch, First edition.(2016), Second International Project Management, (2006).
[8] M. Z.Ramli, Study of factors influencing construction delays at rural area in Malaysia, F. Rahnama Roodposhti and V. Rooholelm, Portfolio management with heuristic optimazation, Journal of Physics: Conference Series 1049 012017, (2017).
[9] V. Rooholelm A.Rashidi, Claim Management and Delay Analysis in Construction Contracts Based on SCL Protocol and Executive Experience, Adineh book, (2019).
[10] V. Rooholelm, H. Shiroyezad, Selection, ranking and optimal project portfolio optimization under the conditions of contraction policy with Dimetel combined method and Data Envelopment Analysis in Mobarakeh Steel Company Development Projects, Ninth National Conference on Data Envelopment Analysis, (2017).
[11] A. Sheikh Aboumasoudi, Design of Value Chain Models in Multistage Production Systems to Achieve Effective Profit Management Strategy, Isfahan University Press, First Edition(2016).
[12] Sheng-Li Si, Xiao-Yue You, Hu-Chen Liu, Ping Zhang, DEMATEL Technique: A Systematic Review of the State-ofthe-Art Literature on Methodologies and Applications, Mathematical Problems in Engineering, Volume 2018, Article ID 3696457, 33 pages,(2018) https://doi.org/10.1155/2018/3696457./
[13] R. Sweis, A. Moarefi, M. Amiri, S. Moarefi, R. Saleh, Causes of delay in Iranian oil and gas projects: a root cause analysis, International Journal of Energy Sector Management 13 (2019) 630-650. https://doi.org/10.1108/IJESM-04-2018-0014/.