Application of AHP and GRA Hybrid Method for Cost Management on Changes in EC Contracts Case study: EC Projects in the Oil Industry
Subject Areas : Management Accountingpeyman niayeshnia 1 , Morteza Rayati Damavandi 2 , Sirous Gholampour 3
1 - Doctoral Student of Construction, Department of Civil Engineering, Sari Branche, Islamic Azad University, Sari, Iran.
2 - Department of Civil Engineering, Faculty of Engineering, Islamic Azad University, Qaemshahr Branch, Iran
3 - Assistant Professor of Department of Civil Engineering, Qaemshahr Branch, Islamic Azad University, Qaemshahr, Iran
Keywords: Cost, Chang, Management, AHP, GRA,
Abstract :
In most executive projects, changes and rework have become one of the main risks in this area, so providing a cost management model for registering, evaluating, controlling, and managing change can play an important role in achieving project goals.In this study, field studies and questionnaires and interviews with experts, information and relevant records were collected, which resulted in finding 16 of the most effective changes in the cost of executive EC projects in the oil industry. Then, based on the management model of each of the changes presented in this research, using a hybrid method of multi-criteria decision making of hierarchical analysis (AHP) and gray relationship analysis (GRA), to provide management structure to change the cost of EC projects in the field of EC industry. This research could be useful in reducing the risk of budgeting and managing the cost of change and minimizing its impact on EC projects in the oil industry.
* Kabirfar, K.; Mojtahedi, M. The impact of [Engineering, Procurement and Construction (EC) Phases on Buildings 2019, 9(1), 15; https://doi.org/10.3390/buildings9010015.
* Neyestani, B.; Juanzon, J.B.P. Developing an Appropriate Performance Measurement Framework for Total Quality Management in Construction, and Other Industries; University Library of Munich: Munich, Germany, 2016.
* Oakland, J.; Marosszeky, M. Total Construction Management: Lean Quality in Construction Project Delivery; Routledge: Abington, UK, 2017.
* Keyvani, B. (2006). Identifying the claims of conventional construction contracts andAnalysis of its causes. MSc. Thesis, Faculty of Engineering, University of Tehran, Iran.
* Heravi.A. (2013). Cause of claims incidence in urban project contracts, MSc. Thesis. School of Civil Engineering, Science and Technology, Tehran, Iran.
* Abrahimi, N., Farahani, M., & Sheikh, J. (2015). Pathology of claim management process in design and Build contracts: the case study of oil contracts; Sixth International Conference on Project Management, Istanboul, Turkey.
* Mira, F.A.; Pinnington, A.H. Exploring the value of project Management: Linking project Management efficiency and project success. Int. J. Proj. Manage. 2014, 32, 202–217.
* Kerzner, H.; Kerzner,R. Project Management: A Systems Approach to Planning, Scheduling, and Controlling; John Wiley & Sons: Hoboken, NJ, USA, 2017.
* Tonchia, S. Industrial Project Management; Springer: Berlin, Germany, 2018; Available online: https://link.springer.com/book/10.1007%2F978-3-662-56328-1#authorsandaffiliationsbook (accessed on 30 December 2018).
* Gamil, Y.; Rahman, I.A. Identification of causes and effects of poor communication in construction industry: A theoretical review. Emerg. Sci. J. 2018. Pophalie, M. Causes of cost overrun in construction. IOSR J. Eng. 2011, 4, 1–7.
* Lu and Liu, R. 2018 a. acute toxicity bioassay of mercuric chloride: an alien fish from a river. Toxicological & Environmental Chemistry. 92: 169-173.
* Darvik, L.; Larsson, J. The Impact of Material Delivery-Deviations on Costs and Performance in Construction Projects. Master’s Thesis, Chalmers University of Technology, Goteborg, Sweden, 2010.
* Julong Deng, JD. (2000). Business Dynamics: Systems Thinking and Modeling for a Complex world, McGraw-Hill, NewYork, US.
* Zou, P.X.; Zhang, G. Managing risks in construction projects: Life cycle and stakeholder perspectives. Int. J. Construct. Manag. 2009, 9, 61–77.
* Sadeghi, H., Naseri, A., Shahriari, L. (2013). Examination of the Factors Affecting the Efficiency of Gas Power Plants. Iranian Energy Economics, 2(8), 93-107, In Persian.
* Salehi Taleshi, M., Arbabi, H., Hosseinalipour, M. (2018). Examining the Role of the Project Management Office in Creation of Knowledge Management Infrastructures in Project-Based Organizations of Iranian Oil & Gas Upstream Industry. Journal of Executive Management, 9(18), 37-61, In Persian.
* Masoudnejad, M., Rayati Damavandi, M., Gholampoor Dahaki, S. (2018). Introducing a cost-effective engineering model for increasing productivity indicators. Management Accounting, 11(37), 15-27.
* Masoudnejad, M., Rayatid Damavandi, M., Gholampour, S. (2019). A hybrid model for risk assessment in infrastructure projects: the case of small-scale power plants. Asas Journal, 21(54), 41-56, In Persian.
_||_