• Home
  • Considering budget limits in the time-cost-quality trade-off problem And determination of the most economical combination of crashing the time of activities In Critical Path methods networks (CPM)

Share To

Article Url


Manuscript ID : 669788 Visit : 152 Page: 192 - 211

20.1001.1.22519165.1398.10.41.9.1

Article Type: Original Research