[2]
P. Moore, P. Ashmole, “Flexible AC Transmission Systems” Pt.1, Power Engineering Journal, Dec 1995.
[3]
S. Grebex, Cherokaoui, A.J. Germond, “Optimal Location of FACTS Devices to Enhance Power System Security”, IEEE Power Tech Conference Proceeding, Vol.3, pp.23-26, Jun 2003.
[4]
Y. Lue and A. Abur, “Improving System Static Security via Optimal Placement of Thyristor Controlled Series Capacitors (TCSC)”, IEEE Power Engineering Society Winter Meeting, Vol.2, pp.516-521, 2001.
[5]
H. Besharat, S.A. Taher, “Congestion Management by Determining Optimal Location of TCSC in Deregulated Power Systems”, Electrical Power and Energy Systems, Elsevier, pp.563-568, 2008.
[6]
Allen J. Wood and Bruce F. Wollenberg, “Power Generation, Operation & Control”, New York: Wiley, 1996.
[7]
Federal Energy Regulatory Commission Staff, “Assessment of Demand Response and Advanced Metering”, Federal Energy Regulatory Commission, Docket AD-06-2-000, Aug 2006.
[8]
Federal Energy Regulatory Commission Staff, “Assessment of Demand Response and Advanced Metering”, Federal Energy Regulatory Commission, Docket AD-06-2-000, Aug 2006.
[9]
[10]
[11]
[12]
P. Jazayeri, A. Schellenberg, W.D. Rosehart, J. Doudna, “A Survey of Load Control Programs for Price and System Stability”, IEEE Transactions on Power Systems, Vol.20, No.3, pp.1504-1509, Aug 2005.
A. Yousefi, E. Shayesteh, M. ParsaMoghaddam, “Enhancement of Spinning Reserve Capacity by means of Optimal Utilization of EDRP Program”, IASTED Conferences, Power and Energy Systems Conference, 2008.
D. Kirschen, G. Strbac, “Fundamentals of Power System Economics”, John Wiley & Sons, 2004.
H. Aalami, G.R. Yousefi, M. ParsaMoghadam, “Demand Response Model Considering EDRP and TOU Programs”, IEEE/PES Transmission and Distribution Conference & Exhibition, May 2008