References:
[1]
X. Wang, J. R. McDonald, “Modern Power System Planning”, MCGRAW-HILL publication,1994.
[2]
U.G.W.Knight, “The logical design of electrical networks using linear programming methods”, proc. Inst. Elect. Eng. A, vol.107, pp.306-316, 1960.
[3]
Oldfield. J.Vand Lang. M.A, “Dynamic programming network flow procedure for distribution system planning”, in proc. Power industry computer applications conf., 1965.
[4]
R. N. Adams and M. A. Laughton, “Optimal planning of power networks using mixed integer programming”, Proc. IEEE, vol. 121, no. 2, pp.139–147, Feb. 1974.
[5]
D. M. Crawford and S. B. Holt, “A mathematical optimization technique for locating and sizing distribution substations and deriving their optimal service areas”, IEEE Trans. Power App. Syst. vol.PAS-94, no. 2, pp. 230–235, Apr. 1975.
[6]
E. Masud, “An iterative procedure for sizing and timing distribution substations using optimization techniques”, in Proc. IEEE PES Winter Meeting, pp.1281–1286, Feb.1974.
[7]
T. Gönen and B. L. Foote, “Distribution system planning using mixed integer programming”, Proc. Inst. Elect. Eng, vol. 128, no. 2, pp. 70–79, Mar. 1981.
[8]
M. J. Carson and G. Cornfield, “Design of low voltage distribution networks”, Proc. IEEE, Vol.120, No. 5, pp. 585–
International Journal of Smart Electrical Engineering, Vol.2, No.1, Winter 2013 ISSN: 2251-9246
9
593, May 1973.
[9]
M. J. Carson and G. Cornfield, “Computer aided design of low-voltage distribution networks”, in Proc. IEE Computer Aided Design Conf, Vol.86, pp. 121–124, 1972.
[10]
T. Belgin, “Distribution system planning using mixed integer programming”, ELEKTRIK, Vol.6, No.1, pp. 37–48, 1998.
[11]
M. R. Haghifam and M. Shahabi, “Optimal location and sizing of HV/MV substation in uncertainty load environment using genetic algorithm”, Elect.Power Syst. Res, Vol.63, pp.37–50, 2002.
[12]
M. H. Sepasian, H. Seifi, A. A. Foroud, S. H. Hosseiniand E. M. Kabir, “A new approach for substation expansionplanning”, IEEE Trans. Power Syst, vol. 21, no. 2, pp. 997–1004,May 2006.
[13]
S. Najafi, S.H. Hosseinian, M. Abedi, A. Vahidnia and S.Abachezadeh, “A framework for optimal planning in largedistribution networks”, IEEE Trans. Power Syst, vol. 24, no. 2,2009.
[14]
T.H.M. El-Fouly, H.H. Zeineldin, E.F. El-Saadany andM.M.A. Salama, “A new optimization model for distributionsubstation sitting, sizing, and timing”, Electric Power SystemsResearch, vol. 30, pp. 308-315, 2008.
[15]
A. Mantawy and M. Al-Muhaini, “A new particle swarmbasedalgorithm for distribution system expansion planning includinggeneration”, Proceedings 2nd Iasme/Wseas Int. Conf. on Energy &Environment, Jun 2008.
[16]
A. Hajizadeh and H. Hajizadeh, “PSO-based planning ofdistri-bution systems with distributed generations,” World Academyof Science, Engineering and Technology 45, 2008.
[17]
J. F. Gomez, P. M. De Oliveira, L. Ocque J. M. Yusta R.Villasana, H.M. Khodr and A. J. Urdaneta, “Ant colony system algorithm for the planning of primary distribution circuits”, IEEE Trans. Power Syst., Vol.19, pp.996–1004, May. 2004.
[18]
J.M. Alvarado, E.V. Alvarado, M.A. Arévalo, S.P. Quituisaca, J.F. Gomez and P.M. De Oliveira-De Jesus, “Ant colony systems application for electric distribution network
planning”, IEEE 15th International Conference on Intelligent System Applications to Power Systems, 2009.
[19]
H. K. Temraz, M.M.A. Salama, “A planning model for sitting, sizing and timing of distribution substations and defining the associated service area”, Electric Power Systems Research 62, pp.145-151, 2002.
[20]
K. Aoki, K. Nara, T. Satoh, M. Kitagawa and K. Yamanaka, “New approximate method for distribution system planning”, IEEE Transactions on power systems, Vol.5, No.1, pp.126-132, 1990.
[21]
K. Yahav and G. Oron, “Optimal location of electrical substation in regional energy supply systems”, in Proc. IEEE EEIS, Jerusalem, Israel, pp. 307–310, Nov, 1996.
[22]
D. E. Bouchard, M. M. A. Salama and A. Y.Chilchani, “Optimal feeder routing and optimal substation sizing and placement using guided evolutionary simulated annealing”, in Proc. IEEECCECE, 1995, pp. 684–691.
[23]
D. Hongwei, Y. Yixin and H. Chunhuaetal, “Optimal planning of distribution substation locations and sizes-model and algorithm”, Elect. Power Energy Syst., Vol.18, No.6, pp.343–357, 1996.
[24]
M. R. Haghifam, H.Falaghi, O. P. Malik “ Risk-based distributed generation placement”, IET Generation Transmission and Distribution, Vol.2, No.2, pp.252–260, 2008.
[25]
D. S. Popovic, Z. N.Popovic,”A risk management procedure for supply restoration in distribution networks”, IEEE Transactions on Power Systems, Vol.19, No.1, pp.221–228, 2008.
[26]
Goldberg, E. David, ”Genetic Algorithms in search, optimization, and machine learning”, Addison-wesley, 1989.