Comparison of the technical and economic feasibility of using EDS systems to replace the earth well in order to provide suitable electric earth with existing methods
الموضوعات :
1 - Department of Health, Arak Branch, Islamic Azad University, Arak, Iran
الکلمات المفتاحية: EDS, Technical and economic feasibility, water well wall pipe, earth well,
ملخص المقالة :
The present study was conducted with the aim of Studying the use of metal wall pipes of water wells to provide electric earth and technical and economic feasibility of using EDS to replace earth wells in installation equipment. The research method was descriptive, analytical and applied. The results of the research showed that the use of the well wall pipe in water pumping stations as the ground electrode may contribute to their corrosion due to the passage of electric current.