Beam shaping assembly study for BNCT facility based on a 2.5 MeV proton accelerator on Li target
الموضوعات : Journal of Theoretical and Applied Physics
1 - Department of Electrical Engineering, Eastern Macedonia and Thrace Institute of Technology
الکلمات المفتاحية: BNCT, Li(, )Be, proton accelerators, Li target, MCNP5,
ملخص المقالة :
AbstractA new study for a boron neutron capture therapy irradiation facility, based on a 2.5 MeV proton accelerator on a thick Li target as neutron converter, is presented here. The beam shaping assembly (BSA) modeling has been performed with the use of the MCNP5 Monte Carlo code. The fast (i.e., > 10 keV) neutron component yielded by the 7Li(p,n)7Be reaction is slowed down through TiF3 neutron spectrum shifter, while to obtain a high-quality epithermal neutron beam at the beam port exit additional layers for thermal neutrons removal and shielding of gamma rays were used. Moreover, 60Ni and Ti6Al14V were selected to filter out and further remove the residual fast neutron component, while cadmium was chosen as thermal neutrons absorber, and bismuth was selected for gamma rays shielding. The therapeutic effectiveness of the proposed BSA was evaluated by performing a set of dose-equivalent distribution calculations in a standard Snyder head phantom. The simulation results show that the proposed BSA modeling meets all the recommended by IAEA criteria and provides one possible technical choice for an accelerator-based BNCT irradiation facility in a hospital environment.