Two-stage fuzzy network based on central resource allocation
Subject Areas : International Journal of Data Envelopment AnalysisSomayeh sadeghzadeh 1 , Mohammad Reza Mozaffari 2 , Zohreh Iravani 3 , Ali Ebrahimnejad 4 , هادی باقرزاده ولمی 5
1 - Islamic Azad University, Imam Khomeini Yadgar Branch (RAH), Tehran, Iran
2 - Department of Mathematics, Shiraz Branch, Islamic Azad University, Shiraz, Iran
3 - Islamic Azad University, Imam Khomeini Yadgar Branch (RAH), Tehran, Iran
4 - Islamic Azad Univesity, Qaemshahr Branch
5 - IAU Of Yadegar Emam
Keywords: Data Envelopment Analysis, DEA network, Fuzzy linear programming, central resources allocation, target,
Abstract :
This Evaluation of fuzzy networks with imprecise data is crucial. In this article, we propose fuzzy two-stage network models based on the structure of central resource allocation models. Firstly, we obtain the target for the fuzzy decision-making units in the two-stage network by using central resource allocation models, with a maximum of one two-phase model in each stage of the network. Then, we determine the overall target for the network. The probability function approach is used in the two-stage fuzzy network models to rephrase the proposed models and find the target. In conclusion, we calculate the target for Iranian airlines using fuzzy data and the proposed model.
[1] Charnes, A., Cooper,W. W., Rhodes, E., Measuring the efficiency ofdecision making units, European
Journal of Operational Research 2(1978) 429-444.
[2] Banker,R. D. A., Charens,W. W.Cooper, Some models for estimating technical and scale inefficiencies in
Data Envelopment Analysis,Management Science 30 (1984) 1078-1092.
[3] Yu,G., Wei,Q., Brockett, P., Zhou, L.,Construction of all DEA efficientsurfaces of the production ossibilityset under the GDEA, European Journalof perational Research 95 (1996)491-510.
[4] Jahanshahloo,G. R., Hosseinzadeh Lotfi, F., ZhianiRezai, H., Rezai Balf F., Finding strong defining hyperplanes of Production Possibility Set, European Journal of Operational Research, 177(2007)42-54.
[5] Jahanshahloo, G. R., Shirzadi, A., Mirdehghan, S. M., Finding strong defining hyperplanes of PPS using multiplier form, European Journal of Operational Research 194 (2009) 933-938.
[6] Luo ,a., Hao Chen, a., Yue Yang ,a., Guangdong Wu ,b., Long Chen ,A., three-stage network DEA approach for performance evaluation of BIM application in construction projects Technology in Society ,Volume 71, November 2022, 102105 .
[7] Marios, D., Patrick, B., eullens. B., Leonidas Sotirios Kyrgiakos, c., Jonathan Klein, d., Measurement and evaluation of multi-function parallel network hierarchical DEA systems, Socio-Economic Planning Sciences,Volume 84, December 2022, 101428.
[8] Khoveyni , M., Eslami, R., Two-stage network DEA with shared resources: Illustrating the drawbacks and measuring the overall efficiency , Knowledge-Based SystemsVolume 250, 17 August 2022, 108725.
[9] Amiri, M., Taghavifard, T., Hanafizadeh, P., A new fuzzy DEA net: A case study, Expert Systems with Applications Available online 20 February 2023, 119552.
[10] Azadi,M., Jafarian,M., Farzipoor Saen,R., Mirhedayatian,M.,A new fuzzy DEA model for evaluation of efficiency and effectiveness of suppliers in sustainable supply chain management context,Computers & Operations Research,2015,Pages 274-285,
[11]Ebrahimnejad, A., (2016) New method for solving fuzzy transportation problems with LR flat fuzzy numbers. Inf Sci 37:108–124 [14]Arana-Jiménez M, Sánchez-Gil MC, Lozano S (2020) A fuzzy DEA slacks-based approach. J Comput Appl Math. https://doi.org/ 10.1016/j.cam.2020.113180
[12] Arana-Jiménez, M., Carmen Sánchez-Gil, M., Lozano,s., A fuzzy DEA slacks-based approach,
Journal of Computational and Applied Mathematics,2022,113180,
[13]Bagheri, M., Ebrahimnejad ,A., Razavyan ,S., HosseinzadehLotfi, F., Malekmohammadi ,N., (2020) Solving the fully fuzzy multiobjective transportation problem based on the common set of weights in DEA. J Intell Fuzzy Syst 39(3):3099–3124
[14]Cheng, P., He, S., Stojanovic, V., Luan X, Liu, F., (2021) Fuzzy fault detection for Markov jump systems with partly accessible hidden information: an event-triggered approach. IEEE Trans Cybern.https ://doi.org /10.1109/ TCYB.2021.3050209
[15]Chen, TCT., Wang ,YC., (2021) A fuzzy mid-term capacity and production planning model for amanufacturing systemwith cloudbased capacity. Complex Intell Syst 7:71–85. https://doi.org/10.
[16]Golany , B. , Tamir, E., “Evaluating efficiency-effectiveness-equality trade-offs: a data envelopment analysis approach”, management science, 41 (1995) 1172–1184
[17] Lozano, S., Villa, G., (2004). Centralized resource allocation using data envelopment analysis.Journal of Productivity Analysis, 22, 143–161.
[18] Lozano, S., Villa, G., Adenso-Díaz, B., (2004). Centralised target setting for regional recycling operations using DEA. Omega, 32, 101 – 110.
[19] Hosseinzadeh Lotfi, F., Nematollahi, N., Behzadi, M.H., Mirbolouki, M., Moghaddas, Z. Centralized resource allocation with stochastic data, J. Comput. Appl. Math. 236 (2012) 1783-1788.
[20] Lozano, S. Slacks-based inefficiency approach for general networks with bad outputs: An application to the banking sector, Omega, http://dx.doi.org/10.1016/j.omega.2015.02.012
[21] Charnes, A., Cooper,W.W., Chance-constrained programming, Manage. Sci. 6 (1959) 73–79.
[22] Hatami-Marbini,A., Saati,S., (2018), Efficiency evaluation in two-stage data envelopment analysis under afuzzy environment: A common-weights approach, Journal of Applied Soft Computing, 156–165
Available online at http://ijdea.srbiau.ac.ir
Int. J. Data Envelopment Analysis (ISSN 2345-458X)
Vol. 11, No. 4, Year 2023 Article ID IJDEA-00422, Pages 1-12
Research Article
International Journal of Data Envelopment Analysis Science and Research Branch (IAU)
|
Two-stage fuzzy network based on central resource allocation
S.Sadeghzadeh 1, M.R.Mozaffari 1 2, Z.Iravani 1, A.Ebrahimnejad 3, H.BagherzadehValami 1
1 Department of Mathematics, Yadegar-e-Imam Khomeini (RAH) Shahre Rey Branch, Islamic Azad University, Tehran, Iran,
2 Department of Mathematics, Shiraz Branch, Islamic Azad University, Shiraz, Iran,
3 Department of Mathematics, Qaemshahr Branch, Islamic Azad University, Qaemshahr, Iran.
Received 12 April 2023, Accepted 13 July 2023
Abstract
This Evaluation of fuzzy networks with imprecise data is crucial. In this article, we propose fuzzy two-stage network models based on the structure of central resource allocation models. Firstly, we obtain the target for the fuzzy decision-making units in the two-stage network by using central resource allocation models, with a maximum of one two-phase model in each stage of the network. Then, we determine the overall target for the network. The probability function approach is used in the two-stage fuzzy network models to rephrase the proposed models and find the target. In conclusion, we calculate the target for Iranian airlines using fuzzy data and the proposed model.
Keywords: Data Envelopment Analysis; DEA network; Fuzzy linear programming, central resources allocation; target.
[1] Corresponding author: Email: Mozaffari854@yahoo.com
1. Introduction
Data Envelopment Analysis (DEA) is a method of analyzing data by considering both input and output vectors. It calculates relative efficiency and can determine the target units of a decision-maker using either fixed or variable scale efficiency technology. The CCR models, developed by Charnes, Cooper, and Rhodes in 1978, were the precursors to the BCC models proposed by Banker et al. in 1984. The CCR and BCC models consider fixed and variable scale efficiency technology, respectively [1][2]. Although calculating the efficiency score of decision-making units is very important, following the principles of DEA to build the efficiency frontier and determine efficient and inefficient units is the main basis of modeling in DEA. As a result, many studies have been conducted to identify efficient hyperplanes in DEA. For example, in 1978, Charnes, Cooper, and Rhodes investigated constructive hyperplanes (hyperplanes corresponding to a strong efficient boundary) [3]. In 1996, Yu et al. proposed a method for analyzing efficient hyperplanes [4]. Jahanshahloo et al. (2007) used hyperplanes to obtain the members of the reference set [5]. In 2009, Jahanshahloo, Shirzadi, and Mirdehghan presented a collective model and a multiplicative BCC model to obtain strong efficient hyperplanes [6]. In 2022, Leo, Chen et al. developed a three-stage network DEA approach for performance evaluation of BIM application in construction projects [7]. Merris et al. (2022) measured and evaluated multi-function parallel network hierarchical DEA systems [8]. Khovini (2022) proposed a two-stage network DEA with shared resources and illustrated the drawbacks and measured the overall efficiency [9]. In 2023, Amiri et al. proposed a new fuzzy DEA network based on possibility and necessity measures for agile supply chain performance [10].
In the real world, accurately measuring data can be a difficult and sometimes impossible task. As a result, the technique of Fuzzy Data Envelopment Analysis (FDEA) was introduced to handle imprecise data. The concept of fuzzy and fuzzy sets was first defined by Max Block in 1937, and since then, there have been extensive studies in the field of Fuzzy Data Envelopment Analysis (FDEA). For example, Azadi (2015) also proposed a new fuzzy DEA model to evaluate the effectiveness and efficiency of suppliers in sustainable supply chain management [10]. Ebrahimnejad et al. (2016) developed a new method for solving fuzzy transportation problems [11], while Lozano (2020) proposed a fuzzy DEA slacks-based approach [12]. HassanzadehLotfi et al. (2020) investigated solving the fully fuzzy multi objective transportation problem based on the common set of weights in DEA [13]. Chen et al. (2021) studied a Fuzzy fault detection for Markov jump systems with partly accessible hidden information [14], and Wang et al. (2021) presented Wang et al. (2021) presented a fuzzy mid-term capacity and production planning model for manufacturing system with cloud-based capacity [15].
On the other hand, in the primary models of data envelopment analysis, to evaluate the decision-making units, the problem should be solved by their number, therefore, central resource allocation models (CRA) were presented, based on which the target of all DMUs can be modeled by solving only one Calculate the linear programming problem on the efficiency frontier. In fact, one of the advantages of central resource allocation models compared to traditional data envelopment analysis models is this feature. In a special case, in the input-oriented centralized allocation model, instead of reducing the input of each DMU, the total input consumption of all DMUs is reduced. Golani et al. in 1995 presented a model that assigns all input values to a decision-making unit without limiting the output changes of each unit [16]. After that, Lozano and Villa in 2004 presented central resource allocation models using data envelopment analysis. In their proposed model, the total output production does not decrease and by presenting a linear programming problem, the image of all units on the efficiency frontier. [17] Also, Lozano et al. in 2004 developed central resource allocation models by introducing correct variables and investigated the application of the proposed models by providing an example on the paper industry [18]. Then, in 2012, HosseinzadehLotfi et al. presented a centralized resource allocation model with random data and showed that in the proposed model, the total random input is reduced, but the proposed model is in a situation where the manager faces limited resources in total inputs or total outputs. It was not used [19].
The main goal of this article is to evaluate the effectiveness of two-stage fuzzy network modeling and the use of CRA structure in finding a suitable model for decision-making units. One of the key advantages of this article is the utilization of a two-phase fuzzy linear programming model to identify a target for fuzzy decision-making units. Additionally, the article highlights the importance of using the probability function approach to de-fuzzily the proposed models. In the second part, the basic concepts of CRA and the fuzzy probability function are briefly presented. In the third part, first and second stage models of the fuzzy network are proposed, then the general stage model and its de-fuzzification based on the probability function are presented. In the fourth section, a practical example is given and the conclusion is at the end.
2. Basic concepts
In this section, some materials related to non-radial CRA model, basic fuzzy concepts are given.
2.1. input - oriented non-radial CRA model
Assume n decision making units with m inputsand s output is available and the non-radial CRA model consists of two stages in the input nature. In phase one, a different reduction factor is considered for each input. Suppose that the priority factor is to reduce the overall consumption of the ith input and be the factor of reducing the overall consumption of the ith input. In this case we have
Model (1) is a linear programming problem with 1+2+…n variables and
m + s + n constraints. If z* is the optimal value of model (1), then the second phase of the model is expressed as (2).
In model (2), the non-radial reduction of the first phase has been done, and on the other hand, the first set of constraints of the inputs are valid, so it does not need any slack input variables. After solving the model (2), an efficient point is obtained for the desired DMU. Therefore, the input and output of each point can be calculated as (3).
Therefore, the advantage of CRA models compared to traditional DEA models is that, firstly, instead of solving a separate linear programming model for each DMU, all DMUs are evaluated simultaneously, and secondly, instead of reducing the inputs in the evaluated DMUs, the overall consumption The input of all DMUs is reduced.
3. Two-stage network with fuzzy data
In this section, first, the target of the fuzzy decision-making units for the two-stage network is obtained based on central resource allocation models with a maximum of one two-phase model in each stage of the network, then the target is determined for the overall state of the network. In two-stage fuzzy network models, the probability function approach has been used to de-phase the proposed models to find the target.
3.1 Fuzzy model of two-stage fuzzy network
Consider the two-stage network as shown in Figure (1):
Figure 1. Two-stage fuzzy network
Considering the fuzzy vectors in the two-stage network, we consider the network fuzzy model based on CRA as follows.
In phase (I), it is necessary to solve the fuzzy programming model (4) and in phase (II), taking into account the model of maximum auxiliary variables, it is a fuzzy programming model that is solved to find the appropriate pattern of decision-making units. Based on the idea of Lozano et al. [22], the model of decision-making units is obtained from the following relationship:
In model (4), the appropriate pattern for the first stage of the network is obtained. Of course, the model (4) is a fuzzy linear programming problem that is converted into a linear form by the approach of the probability function, and from the solution of the linear model, a suitable pattern can be depicted on the border that is built on the basis of CRA. Similarly, the second stage fuzzy network model based on CRA is proposed as follows.
3.2 The overall phase of the fuzzy network
The fuzzy network model of the overal stage based on CRA, considering and corresponding to the first and second stages of the network, is proposed as (7):
Model (7) is a fuzzy nonlinear programming problem and has two objectives. Therefore, we convert model (7) into a fuzzy linear programming problem with the appropriate variable. It should be noted that model (7) in case of maximizing the variables an auxiliary related to the adverbs means that in the second phase, it can calculate the appropriate model of the decision-making units based on the fuzzy probability function. Now, by changing the variable, the model (7) can be converted into the (8).
Model (8) is a linear model. If an optimal solution is model (8), then the relative efficiency of the second stage and the relative efficiency of the first stage are defined. Therefore, considering the boundary image method, the overall efficiency and the relative efficiency of both stages of the model (8) are obtained.
3.3 overall step of fuzzy network with fuzzy probability function approach
In this section, we consider the overal phase model of the fuzzy network without introducing the generality of the gap reasoning, and the probability function approach is used to de-fuzzify it. Model (8) is a linear and fuzzy model that must be de-fuzzified to solve it, so the fuzzy probability function approach of Charz and Cooper [23] is used.
In model (9) andthe predicted acceptable levels for the first to fourth constraints are all in the range of [0, 1]. In this model, the value of the objective function is a minimum value. While all the constraints are met at the level of the predicted probabilities. This model is a fuzzy model and to solve this model, it should be de-fuzzified. This is possible due to the emergence of acceptable levels of andin the above model. Considering that the fuzzy variables are convex and normal, therefore, for every possible levelandwhich are in the interval and [0,1], Lemma 1 holds. Therefore, by applying Lemma 1 on model (9), it is possible to find the upper and lower bounds of the alpha level sets corresponding to the first to fourth constraints in the mentioned model and write this model in the following form:
Due to the fuzziness of the variables of the model (10), we can write the formula (11):
Model (11) is still a fuzzy linear programming problem. In this model, the fuzzy variables and fuzzy numbers are trapezoidal and according to theorem 1, any trapezoidal fuzzy number that can be represented as the upper and lower bounds of alpha-level sets can be by using the related α-cuts, it was de-fuzzified and converted into a definite number. Therefore, the model (11) can be removed from the fuzzy state and converted into a non-fuzzy programming model. Therefore, according to theorem 1, model (11) can be written as (12):
Therefore, the model (12) becomes a parametric linear programming problem. and targets are obtained for the overall state of the network.
4. Numerical example
This section, we analyze the performance of 24 non-life insurance companies in Taiwan where the operation of each company includes two distinct processes; (i) premium acquisition and (ii) profit generation. The inputs of the first process are operating expenses () and insurance expenses () to produce the two inter-mediate measures; direct written premiums () and reinsurance premiums (). All these intermediate measures are then consumed by the second process to produce the two final outputs; underwriting profit () and investment profit (). The fuzzy data has been created based on the data of 2001 and 2002 to deal with imprecision to some appropriate extent. The data are shown in Table 1.
5. Conclusion
In general, the main goal of this paper is to model the two-stage fuzzy network and use the CRA model to evaluate fuzzy networks with imprecise data. In this article, using a two-phase fuzzy linear programming model, the pattern of fuzzy decision-making units is obtained, and based on the structure of central resource allocation models, two-stage fuzzy network models are proposed. First, the target of the fuzzy decision-making units for the two-stage network is obtained, then the target is determined for the overall state of the network. In two-stage fuzzy network models, the probability function approach is used to de-phase the proposed models to find the target.
| x1 | x2 | z1 | z2 | y1 | y2 |
1 | (1113,1178,1178,1256) | (636,673,673,717) | (7041,7451,7451,7934) | (809,856,856,912) | (930,984,984,1049) | (644,681,681,726) |
2 | (1305,1381,1381,1472) | (1278,1352,1352,1441) | (9469,10020,10020,10.681) | (1712,1812,1812,1932) | (1160,1228,1228,1309) | (788,834,834,889) |
3 | (1112,1117,1117,1255) | (559,592,592,631) | (4513,4776,4776,5091) | (529,560,560,597) | (227,293,293,312) | (622,658,658,701) |
4 | (568,601,601,641) | (561,594,594,633) | (2999,3174,3174,3383) | (351,371,371,395) | (234,248,248,264) | (167,177,177,189) |
5 | (6331,6699,6699,7141) | (3167,3351,3351,3572) | (35335,37362,37362,39.680) | (1657,1753,1753,1869) | (7419,7851,7851,8369) | (3709,3925,3925,4184) |
6 | (2483,2627,2627,2800) | (631,668,668,712) | (9211,9747,9747,10.390) | (900,952,952,1015) | (1619,1713,1713,1826) | (392,415,415,442) |
7 | (1853,1942,1942,2047) | (1377,1443,1443,1521) | (10193,10685,10685,11262) | (613,643,643,678) | (2136,2239,2239,2350) | (419,439,439,463) |
8 | (3615,3789,3789,3994) | (1787,1873,1873,1974) | (16473,17267,17267,18.199) | (1082,1134,1134,1195) | (3720,3899,3899,4110) | (593,622,622,656) |
9 | (1495,1567,1567,1652) | (906,950,950,1001) | (10945,11473,11473,12.093) | (521,546,546,575) | (995,1043,1043,1099) | (252,264,264,278) |
10 | (1243,1303,1303,1373) | (1238,1298,1298,1368) | (7832,8210,8210,8653) | (481,504,504,531) | (1619,1697,1697,1789) | (529,554,554,584) |
11 | (1872,1962,1962,2068) | (641,672,672,708) | (6890,7222,7222,7612) | (613,43,643,678) | (1418,1486,1486,1566) | (17,18,18,19) |
12 | (2473,2592,2592,2732) | (620,650,650,685) | (9000,9434,9434,9943) | (1067,1118,1118,1178) | (1502,1574,1574,1652) | (867,909,909,958) |
13 | (2481,2609,2609,2739) | (1301,1368,1368,1436) | (13239,13921,13921,14.617) | (771,811,811,852) | (3432,3609,3609,3789) | (212,223,223,234) |
14 | (1328,1369,1369,1466) | (940,988,988,1037) | (7034,7396,7396,7766) | (442,465,465,488) | (1332,1401,1401,1471) | (316,332,332,349) |
15 | (2077,2184,2184,2293) | (619,651,651,684) | (9911,10422,10422,10.943) | (712,749,749,786) | (3191,3355,3355,3523) | (528,555,555,583) |
16 | (1152,1211,1211,1272) | (395,415,415,436) | (5331,5606,5606,5886) | (382,402,402,422) | (812,854,854,897) | (187,197,197,207) |
17 | (1382,1453,1453,1526) | (1032,1085,1085,1139) | (7318,7695,7695,8080) | (325,3452,342,359) | (2990,3144,3144,3301) | (353,371,371,390) |
18 | (720,757,757,795) | (520,547,547,574) | (3453,3631,3631,3813) | (947,995,995,1045) | (658,692,692,727) | (155,163,163,171) |
19 | (151,159,159,167) | (173,182,182,191) | (1083,1141,1141,1196) | (458,483,483,506) | (493,519,519,544) | (44,46,46,48) |
20 | (138,145,145,152) | (50,53,53,56) | (300,316,316,331) | (124,131,131,137) | (337,355,355,372) | (25,26,26,27) |
21 | (80,84,84,88) | (25,26,26,27) | (214,225,225,236) | (38,40,40,42) | (48,51,51,53) | (6,6,6,6) |
22 | (14,15,15,16) | (9,10,10,10) | (49,52,52,54) | (13,14,14,15) | (78,82,82,86) | (4,4,4,4) |
23 | (51,54,54,57) | (27,28,28,29) | (233,245,245,257) | (47,49,49,51) | (1,1,1,1) | (17,18,18,19) |
24 | (155,163,163,171) | (223,235,235,246) | (452,476,476,499) | (611,644,644,675) | (135,142,142,149) | (15,16,16,17) |
X1 | X2 | z1 | z2 | |
1 | 820.437 | 469.112 | 5563.147 | 641.740 |
2 | 1139.000 | 650.800 | 7740.800=z | 889.600 |
3 | 1139.000 | 650.800 | 7740.800 | 889.600 |
4 | 1139.000 | 650.800 | 7740.800 | 889.600 |
5 | 1139.000 | 650.800 | 7740.800 | 889.600 |
7 | 1139.000 | 650.800 | 7740.800 | 889.600 |
7 | 1139.000 | 650.800 | 7740.800 | 889.600 |
8 | 1139.000 | 650.800 | 7740.800 | 889.600 |
9 | 1139.000 | 650.800 | 7740.800 | 889.600 |
10 | 1139.000 | 650.800 | 7740.800 | 889.600 |
11 | 1139.000 | 650.800 | 7740.800 | 889.600 |
12 | 1139.000 | 650.800 | 7740.800 | 889.600 |
13 | 1139.000 | 650.800 | 7740.800 | 889.600 |
14 | 139.000 | 650.800 | 7740.800 | 889.600 |
15 | 1139.000 | 650.800 | 7740.800 | 889.600 |
16 | 162.372 | 180.535 | 1228.495 | 500.060 |
17 | 154.200 | 176.600 | 1174.000 | 496.800 |
18 | 154.200 | 176.600 | 1174.000 | 496.800 |
19 | 154.200 | 176.600 | 1174.000 | 496.800 |
20 | 154.200 | 176.600 | 1174.000 | 496.800 |
21 | 154.200 | 176.600 | 1174.000 | 496.800 |
22 | 154.200 | 176.600 | 1174.000 | 496.800 |
23 | 154.200 | 176.600 | 1174.000 | 496.800 |
24 | 154.200 | 176.600 | 1174.000 | 496.800 |
Table 2. The results of the first stage
Table 3. The results of the second stage
| z1 | Z2 | Y1 | Y2 |
1 | 25485.651 | 1298.732 | 6234.566 | 2643.534 |
2 | 10115.400 | 726.800 | 3455.800 | 571.800 |
3 | 10115.400 | 726.800 | 3455.800 | 571.800 |
4 | 10115.400 | 726.800 | 3455.800 | 571.800 |
5 | 10115.400 | 726.800 | 3455.800 | 571.800 |
6 | 10115.400 | 726.800 | 3455.800 | 571.800 |
7 | 10115.400 | 726.800 | 3455.800 | 571.800 |
8 | 36145.800 | 1695.400 | 8161.800 | 4080.400 |
9 | 14650.537 | 693.753 | 3351.634 | 1652.866 |
10 | 50.200 | 13.400 | 84.400 | 4.000 |
11 | 50.200 | 13.400 | 84.400 | 4.000 |
12 | 50.200 | 13.400 | 84.400 | 4.000 |
13 | 50.200 | 13.400 | 84.400 | 4.000 |
14 | 50.200 | 13.400 | 84.400 | 4.000 |
15 | 50.200 | 13.400 | 84.400 | 4.000 |
16 | 50.200 | 13.400 | 84.400 | 4.000 |
17 | 50.200 | 13.400 | 84.400 | 4.000 |
18 | 50.200 | 13.400 | 84.400 | 4.000 |
19 | 50.200 | 13.400 | 84.400 | 4.000 |
20 | 50.200 | 13.400 | 84.400 | 4.000 |
21 | 50.200 | 13.400 | 84.400 | 4.000 |
22 | 50.200 | 13.400 | 84.400 | 4.000 |
23 | 50.200 | 13.400 | 84.400 | 4.000 |
24 | 50.200 | 13.400 | 84.400 | 4.000 |
| X11 | X21 | z11 | z21 | z12 | z22 | y12 | y22 |
1 | 829.769 | 474.434 | 5626.943 | 649.002 | 25485.651 | 1298.732 | 6234.566 | 2643.534 |
2 | 1139.000 | 650.800 | 7740.800 | 889.600 | 10115.400 | 726.800 | 3455.800 | 571.800 |
3 | 1139.000 | 650.800 | 7740.800 | 889.600 | 10115.400 | 726.800 | 3455.800 | 571.800 |
4 | 1139.000 | 650.800 | 7740.800 | 889.600 | 10115.400 | 726.800 | 3455.800 | 571.800 |
5 | 1139.000 | 650.800 | 7740.800 | 889.600 | 10115.400 | 726.800 | 3455.800 | 571.800 |
6 | 1139.000 | 650.800 | 7740.800 | 889.600 | 10115.400 | 726.800 | 3455.800 | 571.800 |
7 | 1139.000 | 650.800 | 7740.800 | 889.600 | 10115.400 | 726.800 | 3455.800 | 571.800 |
8 | 1139.000 | 650.800 | 7740.800 | 889.600 | 36145.800 | 1695.400 | 8161.800 | 4080.400 |
9 | 1139.000 | 650.800 | 7740.800 | 889.600 | 14650.537 | 693.753 | 3351.634 | 1652.866 |
10 | 1139.000 | 650.800 | 7740.800 | 889.600 | 50.200 | 13.400 | 84.400 | 4.000 |
11 | 1139.000 | 650.800 | 7740.800 | 889.600 | 50.200 | 13.400 | 84.400 | 4.000 |
12 | 1139.000 | 650.800 | 7740.800 | 889.600 | 50.200 | 13.400 | 84.400 | 4.000 |
13 | 1139.000 | 650.800 | 7740.800 | 889.600 | 50.200 | 13.400 | 84.400 | 4.000 |
14 | 1139.000 | 650.800 | 7740.800 | 889.600 | 50.200 | 13.400 | 84.400 | 4.000 |
15 | 1139.000 | 650.800 | 7740.800 | 889.600 | 50.200 | 13.400 | 84.400 | 4.000 |
16 | 153.040 | 175.212 | 1164.699 | 492.798 | 50.200 | 13.400 | 84.400 | 4.000 |
17 | 154.200 | 176.600 | 1174.000 | 496.800 | 50.200 | 13.400 | 84.400 | 4.000 |
18 | 154.200 | 176.600 | 1174.000 | 496.800 | 50.200 | 13.400 | 84.400 | 4.000 |
19 | 154.200 | 176.600 | 1174.000 | 496.800 | 50.200 | 13.400 | 84.400 | 4.000 |
20 | 154.200 | 176.600 | 1174.000 | 496.800 | 50.200 | 13.400 | 84.400 | 4.000 |
21 | 154.200 | 176.600 | 1174.000 | 496.800 | 50.200 | 13.400 | 84.400 | 4.000 |
22 | 154.200 | 176.600 | 1174.000 | 496.800 | 50.200 | 13.400 | 84.400 | 4.000 |
23 | 154.200 | 176.600 | 1174.000 | 496.800 | 50.200 | 13.400 | 84.400 | 4.000 |
24 | 154.200 | 176.600 | 1174.000 | 496.800 | 50.200 | 13.400 | 84.400 | 4.000 |
References
[1] Charnes, A., Cooper. W., Rhodes, E., Measuring the efficiency of decision-making units, European Journal of Operational Research 2(1978) 429-444.
[2] Banker, R. D. A., Charens, W. Cooper, some models for estimating technical and scale inefficiencies in Data Envelopment Analysis, Management Science 30 (1984) 1078-1092.
[3] Yu,G, Wei,Q., Brockett, P., Zhou, L., Construction of all DEA efficient surfaces of the production possibilities under the GDEA, European Journal of prerational Research 95 (1996)491-510.
[4] Jahanshahloo, G. R., Hosseinzadeh Lotfi, F., Zhiani Rezai, H., Rezai Balf F., Finding strong defining hyperplanes of Production Possibility Set, European Journal of Operational Research, 177(2007)42-54.
[5] Jahanshahloo, G. R., Shirzadi, A., Mirdehghan, S. M., Finding strong defining hyperplanes of PPS using multiplier form, European Journal of Operational Research 194 (2009) 933-938.
[6] Luo, a., Hao Chen, a., Yue Yang, a., Guangdong Wu, b., Long Chen, A., three-stage network DEA approach for performance evaluation of BIM application in construction projects Technology in Society, Volume 71, November 2022, 102105.
[7] Marios, D., Patrick, B., eullens. B., Leonidas Sotirios Kyrgiakos, c., Jonathan Klein, d., Measurement and evaluation of multi-function parallel network hierarchical DEA systems, Socio-Economic Planning Sciences,Volume 84, December 2022, 101428.
[8] Khoveyni, M., Eslami, R., Two-stage network DEA with shared resources: Illustrating the drawbacks and measuring the overall efficiency, Knowledge-Based SystemsVolume 250, 17 August 2022, 108725.
[9] Amiri, M., Taghavifard, T., Hanafizadeh, P., A new fuzzy DEA net: A case study, Expert Systems with Applications Available online 20 February 2023, 119552.
[10] Azadi, M., Jafarian,M., Farzipoor Saen,R., Mirhedayatian,M.,A new fuzzy DEA model for evaluation of efficiency and effectiveness of suppliers in sustainable supply chain management context, Computers & Operations Research,2015,Pages 274-285.
[11] Ebrahimnejad, A., (2016) New method for solving fuzzy transportation problems with LR flat fuzzy numbers. Inf Sci 37:108–124.
[12] Arana-Jiménez, M., Carmen Sánchez-Gil, M., Lozano,s., A fuzzy DEA slacks-based approach, Journal of Computational and Applied Mathematics,2022,113180.
[13] Bagheri, M., Ebrahimnejad, A., Razavyan, S., HosseinzadehLotfi, F., Malekmohammadi, N., (2020) Solving the fully fuzzy multi objective transportation problem based on the common set of weights in DEA. J Intel Fuzzy Syst 39(3):3099–3124.
[14] Cheng, P., He, S., Stojanovic, V., Luan X, Liu, F., (2021) Fuzzy fault detection for Markov jump systems with partly accessible hidden information: an event-triggered approach. IEEE Trans Cybern.https ://doi.org /10.1109/ TCYB.2021.3050209
[15] Chen, TCT., Wang, YC., (2021) A fuzzy mid-term capacity and production planning model for manufacturing system with cloud-based capacity. Complex Intel Syst 7:71–85. https://doi.org/10.
[16] Golany, B., Tamir, E., “Evaluating efficiency-effectiveness-equality trade-offs: a data envelopment analysis approach”, management science, 41 (1995) 1172–1184.
[17] Lozano, S., Villa, G., (2004). Centralized resource allocation using data envelopment analysis.Journal of Productivity Analysis, 22, 143–161.
[18] Lozano, S., Villa, G., Adenso-Díaz, B., (2004). Centralised target setting for regional recycling operations using DEA. Omega, 32, 101 – 110.
[19] Hosseinzadeh Lotfi, F., Nematollahi, N., Behzadi, M.H., Mirbolouki, M., Moghaddas, Z. Centralized resource allocation with stochastic data, J. Compute. Appl. Math. 236 (2012) 1783-1788.
[20] Lozano, S. Slacks-based inefficiency approach for general networks with bad outputs: An application to the banking sector, Omega, http://dx.doi.org/10.1016/j.omega.2015.02.012.
[21] Charnes, A., Cooper, W., Chance-constrained programming, Manage. Sci. 6 (1959) 73–79.
[22] Hatami-Marbini, A., Saati, S., (2018), Efficiency evaluation in two-stage data envelopment analysis under afuzzy environment: A common-weights approach, Journal of Applied Soft Computing, 156–165.