Raissi, Sadigh, Rooeinfar, Ramtin, Ghezavati, Vahid Reza. “Three Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint.” Journal of Optimization in Industrial Engineering, vol. 12, no. 2, 2019, pp. 131-147. 10.22094/joie.2018.242.1532