Raissi, Sadigh, Rooeinfar, Ramtin, Ghezavati, Vahid Reza (2019). Three Hybrid Metaheuristic Algorithms for Stochastic Flexible Flow Shop Scheduling Problem with Preventive Maintenance and Budget Constraint. *Journal of Optimization in Industrial Engineering*, 12(2), 131-147. 10.22094/joie.2018.242.1532